The Subject Of This Order Is Design, Manufacture, Testing, Delivery/Transportation, Disassembly, Installation, Documentation, Authors Supervision During Installation, Adjustment And Commissioning. In Order To Modernize The Radiation Control Systems Of 5, 6 Energy Block (Eb) And Special Corps (Sc) 3 Of The Kozloduy Npp, It Is Necessary To Optimize And Replace Power, Control And Signaling Panels, A Total Of 20 (Twenty) Pieces, With Technological Names 5,6Hr1,2,3; 5,6Hrh1,2,3,4,5; 0Hr1,2,3,4. 0Hr1,2,3,4. It Is Also Necessary To Replace Compressors (Block Gas Blowers) 6 (Six) Pieces With Technological Names 5,6,0Xq00d01,02, With Reworking Of The Sampling Route And Electromagnetic Valves 6 (Six) Pieces With Technological Names 0.5, 6,0Xq00s1,2 As Well As To Integrate The Existing Control Of The Solenoid Valves For Automatic Periodic Gas Control In The New Cabinets. In This Regard, A Separate Power Supply Should Be Provided (By Laying New Power Cables And Adding New Switching Equipment) To Data Collection Stations (Dds) From A Centralized Information And Measurement System For Radiation Control (Ciisrk).
|