4.1 The Subject Of The Order Is The Implementation Of The Task Pn: Modernization Of The Sewage Treatment Plant In Suszec - Construction Of A Secondary Settling Tank With Accompanying Infrastructure And Construction Of A Sanitary Sewage System - Pressure Pipeline With A Sewage Pumping Station In The Area Of Ul. Piaskowa In Suszec, Hereinafter Referred To As The Order, Co-Financed By The Government Fund Polish Order: Strategic Investment Program. 4.2 Scope Of The Subject Of The Order: 1) The Subject Of The Order Includes The Implementation Of: A) Scope I: Modernization Of The Sewage Treatment Plant In Suszec - Construction Of A Secondary Settling Tank With Accompanying Infrastructure, Including: Construction Of New Facilities: • Secondary Settling Tank, • Pumping Station Sludge, Floating Parts And Process Water, • Excess Sludge Tank, • Measuring Chamber For Treated Sewage, • Sewage Measuring Chamber For A New Settling Tank, • Sewage Separation Chamber For Settling Tanks, • Electrical Technical Container/Akp. Reconstruction, Renovation Or Replacement Of Installations In Existing Facilities : • Biological Reactor, • Vertical Secondary Settling Tank Ow1, • Vertical Secondary Settling Tank Ow2, • Connecting Chamber Kp1, • Connecting Chamber Kp2, • Emergency Overflow Measuring Well, • Sludge And Floating Parts Pumping Station, • Sludge Thickener, • Sewage Measuring Chamber, Demolition Existing Facility: • Mechanical Sludge Dewatering Station, Accompanying Infrastructure • Road, Sidewalks, Embankments, • Industry Inter-Facility Installations, • Dn 600 Pipeline Implemented As Part Of The Reconstruction Of The Ditch, B) Scope Ii: Construction Of A Sanitary Sewage System - Pressure Pipeline With A Sewage Pumping Station In The Area Of Ul. Piaskowa In Suszec, Consisting In The Construction Of A Fragment Of The Sanitary Sewage Network In A Gravity-Pressure System With A Sewage Pumping Station, Which Includes, Among Others:• Pvc-U Gravity Sanitary Sewer Dz200mm L = 46.70• Pressure Pipeline Made Of Steel Pipes Dn80 88.9X3, 2Mm Oh18 N9 L = 2.95M• Pressure Pipeline Made Of Pe100 Rc Sdr17 Pipes Pn10 Dz90x5.4Mm L = 1.55M• Pressure Pipeline Made Of Pe100 Rc Sdr17 Pipes Pn10 Dz110x6.6Mm L = 616.05M• Sewage Pumping Station P With 2 Pumps. Working Alternately With A Capacity Of Q = 5.019 L/S Each, Maintenance-Free, Built In An Underground Well Made Of Polymer Concrete Dn2000, With An Internal Power Supply Line (According To A Separate Study Included In The Technical Design). A Detailed Description Of The Subject Of The Order Was Specified In Point. 4 Swz
|