The Subject Of The Order Includes The Following Scope Of Works: As Part Of The Renovation Works, The Following Should Be Performed: - Dismantling Of Materials And Products And Other Elements Installed During The Works Performed In 2022, Due To The Inability To Identify The Quality Parameters Of The Built-In Elements, Certificates, Technical Approvals And Certificates, In Particular Hygienic Ones -Sanitary And Fire Protection In Particular: Interior Doors, Floors Made Of Mdf Panels, Lighting Fixtures, Radiators, Piping, Capacitive Electric Water Heaters, Circulation Pump In The Boiler Room, White Assembly, Etc. - - Dismantling Of Other Old Elements Of Technical Equipment - Demolition Of The Indicated Partition Walls In The Bathrooms And Toilets In Order To Adapt Them To The Requirements Of Technical And Construction Regulations - Demolition Of Existing Platforms And Ramps In The Boiler Room - Demolition Of Floors On The Ground Within The Basement Rooms, - Demolition Of Floors On The Remaining Floors Made Mainly Of Cement And Pvc Tiles, With The Exception Of Rooms With Terrazzo Floors ( Main Hall) And Parquet Floors (Classrooms And Corridors), These Remain Unchanged - Sanding Of Parquet Floors, Filling Of Gaps, Sealing And Varnishing Permitted For School Facilities - Grinding, Greasing And Maintenance Of The Existing Terrazzo Surface In The Main Hall And The Adjacent Corridor, - Replacing The External Joinery With New Pvc Windows And Wooden Doors - Performing Vertical Insulation Of The Basement Walls At The Junction With The Ground On The Outer Side Of The Wall, Along With Making A Band Of Granite Cubes - Tidying Up The Entrance To The Boiler Room By Hardening The Area In Front Of The Boiler Room Door With Granite Cubes Installation Of A 315 Mm Rainwater Outflow (Openwork Hatch On The Well) Along With The Construction Of Terrain Stairs Made Of Granite Cubes Connecting The Entrance Level To The Boiler Room With The Ground Level (Elimination Of Flooding Of The Boiler Room) - Replacement Of Internal Door Joinery Within The Renovated Rooms And Adjustment Of The Jamb Opening To The Required Door Width - Construction Of New Stairs In The Boiler Room Vestibule - Construction Of New Internal Installations: - Central Heating With The Construction Of A New Boiler Room With A Pellet Condensing Boiler With A Capacity Of 125 Kw - Water, Three-Circuit (Heat/Circuit) - Supplied From The Existing Water Connection To The Building And Hot Water From A Coil Water Heater With A Capacity Of 1000 L. Supplied From The Boiler Room - Sewage - With Connection Of K.S. Risers. To The Existing Underfloor Approaches And The Implementation Of Side Ventilation Of New Sections In Indicated Places, - Hydrant - Supplied From The Existing Water Connection To The Building Through The Distribution Point (W-1 Node With A Mechanical Fire Cut-Off Valve On The Central Heating System) - Electric - Basic, Emergency And Emergency Lighting Evacuation, Plug-In Sockets With Pwp Switches (Main And Boiler Room), Powered From The Existing Overhead Connection To The Building - Burglary And Attack Alarm System With Division Into Zones And Installation Of An Alarm Control Panel In The Office - Monitoring Installation Inside And Outside The Building - Computer Network Installation With With The Installation Of A Rack Server Cabinet - Execution Of Finishing, Cladding, Flooring, Painting And Installation And Assembly Works - Performance Of Complementary And Accompanying Works To The Main Works, Complementing Them From The Point Of View Of The Purpose Of Performing The Main Works To The Full Extent. The Contractor Will Also Ensure Stratigraphic Research Is Carried Out In Accordance With The Guidelines Wdkz In Wrocławthe Parameters Of The Building Such As Usable Area, Development Area, Height, Length And Width Do Not Change And Are: − Building Area – 628.19 M2 − Usable Area – 1,210.08 M2 Of Which Basement – 394.41 M2 Ground Floor – 426.47 M2 Mezzanine Floor – 22.49 M2 Floor – 366.71 M2 − Height (According To §6 Of The Technical Conditions) – 9.21 M − Length – 37.12 M − Width – 18.08 M The Detailed Description Of The Subject Of The Order Is The Design Documentation And Technical Specifications For The Execution And Acceptance Of The Works Construction, All Provisions Of The Swz Together With Questions And Answers, If Any, Were Raised In The Proceedings And Were Published On The Website Where The Proceedings Were Conducted.
|