South End Water Pollution Control Centre (Sewpcc) B679 Chiller Replacement . D2. Scope Of Workd2.1 The Work To Be Done Under The Contract Shall Consist Generally Of Replacement Ofwater-Cooled Chiller Chlr-B679 And Hvac Upgrades At The South End Water Pollution Control Centre(Sewpcc).D2.2 The Major Components Of The Work Are As Follows:(A) Supply And Installation Of A New Water-Cooled Chiller;(B) Supply And Installation Of A New Refrigerant Leak Detection System;(C) Supply And Installation Of A New Refrigerant Exhaust System And Ductwork;(D) Supply And Installation Of Instrumentation And Control Equipment;(E) Wiring Of New Controls And Interlocks To The Existing Automation System Associated With Thenew Equipment And Updating Loop Tags;(F) Provide Configuration Set Points And Programming;(G) Provision Of Concrete Pad;(H) Provision Of Asbestos Abatement To Accommodate The Work;(I) Completion Of Minor Structural Repairs To Accommodate The Work As Required;(J) Demolition And Removal Of Existing Equipment To Be Replaced And;(K) Refer To The Drawing Set And Complete Specification For Additional Details.D2.3 The Following Shall Apply To The Services:(A) City Of Winnipeg Green Building Policy: New City-Owned Buildings And Major Additions;Http://Clkapps.Winnipeg.Ca/Dmis/Docext/Viewdoc.Asp?Documenttypeid=2&Docid=5989(B) Universal Design Policyhttp://Clkapps.Winnipeg.Ca/Dmis/Docext/Viewdoc.Asp?Documenttypeid=2&Docid=3604
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78038446
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.