Electrical Fitting Work – Renovation Of Matthias-Grünewald-Gymnasium Tbb. Electrical Installation: - 5 St Floor Sub-Distribution Boards With Various Energy, Data And Surge Protection Components As Well As With Various Kxn-Dali Building Automation Components For Connecting The Lighting System And Switchable Sockets - Approx. 300M Feed Cable Up To 35Mm² From The Main Building Distribution To The Sub-Distribution - Approx. 6000M Final Circuit Lines Up To 6Mm² To The Individual Rooms - Approx. 800 St Switches, Sockets, Buttons, Temperature Controllers, Key Switches - Approx. 40 St Socket Connections For Dec. Ventilation Devices - Approx. 180 St Blind Connections With Cabling To The Transfer Point - Approx. 200 St Kxn Building Automation Components For Peripheral Connection Of Blinds And Heating Actuators - Approx. 400M Sheet Metal Or Plastic Ducts Including Installation Components - Approx. 140 M Main Cable Route Including Approved Fire And Sound Insulation - 1 St Calibrated Intermediate Counter For Recording Kitchen Consumption Lighting Technology - Approx. 900 St Led Recessed, Surface-Mounted Lights And Downlights With A Dali Knx Connection For Classrooms, Hallways, Stairwells, Toilets, Technical Rooms And For The Administration And Library Area Approx. 30 St Led Ring Pendant Lights (0.6-1.7M) In The Entrance And Cafeteria Area Approx. 100 St Dali-Knx Presence Detectors For Presence Detection Safety Lighting Technology: - Approx. 180 St Safety And Pictogram Lights Including Cabling With Connection To The Existing One Central Battery System In The Basement From The 1St Construction Phase Elevator Technology: - Connect 1 St Completely Assembled Elevator System To Energy And Bma Technology - Connect 1 St Elevator Emergency Call System To Tk Technology Note: The Complete Elevator Control And Cabling Including Emergency Call And Evacuation Is Carried Out On Site By Ab Messerschmitt Advertised Electro-Acoustic System (Ela) - 1 St Move Existing Ela System To Room G.105 (Rectorate) And Expand It With An Additional Amplifier For The Loudspeaker Technology As Well As Replace The Existing Battery Set And Reconnect The Announcement Unit In The Secretariat - Approx. 80 St Loudspeakers Including Cabling And Integration Into The Existing System - Reconnect The Existing Ela Cabling In The Kitchen/Canteen Area - Connect The Ela Cabling From The Small House To The Stationary Existing System In The 2Nd Construction Phase - Reactivate The Existing Ela Amok Alarm Via Vpn Remote Triggering As Well As Additional Amok Trigger Buttons Connect Media Technology In The Teachers Room And In The Secretariat: - Approx. 20 St Hdmi-Vga Rca Connections Including Switchable Sockets For Projectors And Loudspeakers In The Classrooms (Excluding Specialist Classes!) - Approx. 10 St Data Connections Including Switchable Sockets For Info -Displays (Dsb) Hazard Alarm System (Bma) - 1 St Fire Alarm Control Panel With E30 Enclosure For Construction Phase 2 Including Central Fire Brigade Control Technology - Approx. 290 St Detectors Including Peripheral Cabling And Connection To The Existing Fire Alarm Control Panel From The 1St Construction Phase For Remote Monitoring Of Smoke Discharge (Rwa) - 2 St Completely Assembled Smoke Heat Extraction System (Rwa) To The Energy And Bma-Techn
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78028363
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.