Construction Work – Demolition And New Construction Of The Youth Hostel In Marburg - Lot 19 External Plaster, Wdvs. Demolition And New Construction Of The Youth Hostel In Marburg Lot 19 - Exterior Plaster, Etics - 1,450.00 M2 Check The Substrate For External Plaster - 780.00 M2 Check The Substrate For Etics - 2,230.00 M2 Remove Contamination From The Substrate - 580 M Galvanized Wire Straightening Angle For Corners - 210 M Plaster Finishing Profile Galvanized - 460 M Window Connections Apu Strip - 1,300.00 M2 Lime-Cement Light Base Plaster With Fibers - 1,200.00 M2 Reinforcing Mortar With Full-Surface Fabric Inlay - 400 M2 Min. Finishing Plaster Window Plaster Structure - 650 M2 Min. Finishing Plaster Broom Texture Structure - 1050 M2 Facade Paint White - 650 M2 Allowance For Facade Paint For Price Group Ii - 100 M Plastering Reveals Up To 4Cm Wide + Plaster Base Board - 180 M Plastering Reveals Up To 11Cm Width + Plaster Base Board - 650 M2 Insulation Boards Made Of Miwo 140 Mm Thick - 743 M2 Additional Mechanical Fastening Of The Insulation Material - 743 M2 Reinforcing Mortar With Full-Surface Fabric Insert - 350 Pieces Diagonal Reinforcement On Corners And Openings - 230 M Fabric Corner Angle For Outside Corners - 743 M2 Min. Finishing Plaster Window Plaster Structure - 743 M2 Facade Color White - 240 M Plaster And Paint Reveals 15 Cm - 200 M Window-Door Connection Apu Strip - 300 M Connection Joints With Fully Impregnated Sealing Tape
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 77733980
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.