Installation Of Cable Infrastructure – 24E40038; Laves House1; Replacement New Building; Building Automation. Delivery, Assembly And Commissioning Of: 210 Pieces Of Field Devices Such As Temperature Sensors, Pressure Sensors, Monitors, Transmitters And Smoke Switches; 13 Actuators, Electronically Controlled For Valves And Air Flaps; 25 Pieces Of Control Valves As 2- And 3-Way Valves Up To Dn 100; 96 Pieces Of Circuit Breakers, Remote Switches, Control Panels; 11 Automation Focal Points, Consisting Of Control Cabinets With Power Supply, Load Disconnectors, Internal Wiring, Control And Monitoring Modules, Power Modules, Power Supplies, Fault Modules, Manual Control Level, Terminals, Surge Protection, Automation Devices, Operating Devices, Physical Input And Output Functions, Processing Functions, Management And Operating Functions; 32,000 M Installation Cable, Nym-J Up To 4 X 4 Mm², Including Connecting; 60,000 M Installation Cable, Bus Line, Data Cable, J-Y(St)Y Up To 20 X 2 X 0.8 Mm², Including Connecting; 1,400 M Electrical Installation Pipe Made Of Pvc And Steel Up To Od 25 Mm; 1,600 M Of Pvc Electrical Installation Duct And Steel Cable Trays, Including Fittings And Connectors As Well As Suspensions; 160 Pieces Of Cable Fire Protection Insulation As A Foam Insulation; 50 Pieces Of Earthing Connections With 150 M Connection Cables And Potential Equalization; 1 Building Automation System With Control Center Server, Operator Station, Ups, Router, Software, Network Storage, Management And Operating Device, Workstation, Gateway; 100 Pieces. Core Drilling In Concrete And Masonry Up To 150 Mm Diameter.
|