Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services – Pellworm Spa And ...
Tender Notice
TenderID
77602928
Tender Brief
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services – Pellworm Spa And Tourism Service, New Construction Of A Deep-Water Jetty On The Island Of Pellworm - Planning Services - Technical Equipment Ag 7
Architectural, Construction, Engineering And Inspection Services – Pellworm Spa And Tourism Service, New Construction Of A Deep-Water Jetty On The Island Of Pellworm - Planning Services - Technical Equipment Ag 7. The Municipality Of Pellworm Operates The Deep-Water Jetty For Ferry Traffic Between Nordstrand And Pellworm As Part Of Its Own Operations. The Deep-Water Jetty Was Built Between 1990 And 1992 And Is In A Dilapidated Condition. For This Reason, The Port Authority Is Planning A New Building That Also Takes Into Account The Developments Of Recent Years. The Mechanical Systems For A Hydraulically Operated Ferry Bridge Must Be Planned. A Ferry Bridge With A Lifting Portal And Hanging Hydraulic Cylinders Is Planned. Information About The Ferry Bridge Length 24.0 M, Width Between The Shelves: 4.65 M, Total Width Between The Hydraulic Rams: Approx. 6.00 M. Upper Position (Rest Position): Approx. Above Sea Level + 5.50 M, Lower Operating Position: Approx .Nhn -1.00 M Weight Of The Ferry Bridge: Around 60 T. Hydraulic Drive Planning Of The Electro-Hydraulically Operated Lifting System In Accordance With The Ec “Machinery” Directive As Well As The Relevant Standards And Regulations (Din, Vde, Etc.). Lowering And Lifting Speed Of At Least 3.5 M/Min. Hydraulically Operated Locking In The Highest Bridge Position (Rest Position). It Is Operated With A Remote Control. This Requires Compatibility With The Other Ferry Bridges In Wyk, Dagebüll And Wittdün As Well As On The Ferries (Manufacturer: Telcat). Electrical Circuits For All Operating States And Floating Positions. __________________________________________________________________________________________ Further Features: • Oil Container In The Nacelle On The Upper Portal Cross Member • The Hydraulic System Is To Be Designed For Operation With Bio-Hydraulic Oil. • Cable Length With Sufficient Reserve. Bearing On Reinforced Concrete Abutment. Spherical Plain Bearing With Damping For A Vertical And Horizontal Load Direction. Ship Impacts Are Also Diverted Here. Produce Road Heating To Prevent Ice Formation On The Road And Scratch Edges From Heating Conductors With Heating Mats With 3 Heating Circuits, Each 220 V. ___________________________________________________________________________________________ The Costs For The Measure Were Estimated At €500,000 Net (Plus 19% Vat). For This Purpose, Planning Offices Are Invited To Participate In The Competition That Cover The Planning Services Of Technical Equipment Planning In Accordance With Section 55 Hoai, System Group 7, Use-Specific Systems And Process Engineering Systems, And Have Implemented Similar Measures In The Past. Service Phases 1-9 Should Be Processed. The Commissioning Will Take Place In Stages. The Client Reserves The Right To Only Award A Portion Of The Basic Services From The Above-Mentioned Service Profiles. ___________________________________________________________________________________________ The Following Procedure Is Carried Out: In Phase 1, Potential Applicants Are Invited To Participate And Submit The Application For Participation With The Required Evidence. In Phase 2, The Applications For Participation Received Are Processed
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 77602928
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.