Network Infrastructure – Increasing The Availability Of Services And Increasing The Capacity Of Rowanet Transmission Lines. The Purpose Of The Public Contract Is To Build A New Data Network, Which Will Be Built On Modern Technologies, While Modern Management Principles Will Be Introduced. The Existing Network Is Built On Optical Fibers With Xwdm Technology And Mpls Vpn Virtualization. It Operates 70 L3 Vpn And L2 Vvpn Units. The New Network Will Be Built Parallel To The Existing One And Must Have A Capacity Of 250 L3 Vpns And 50 L2 Vpns. The Implementation Consists Of The Following Steps: 1. Creation Of An Implementation Project Including Measurement Of Optical Routes, 2. Delivery Of Hw And Sw, 3. Installation Of A Transmission System, 4. Installation Of Active Elements In Designated Nodes, 5. Creation Of Migration Bridges For Moving Services From The Old Network (The Specific Service Must Be Operated In Both The Old And The New Network At The Same Time), 6. Completion Of Acceptance Tests And Demonstration Of Typical Tasks, 7. Documentation And Training, 8. Service And Maintenance For The Duration Of The Service Contract. More Detailed Information About The Subject And Conditions Of Performance Are Provided Further In The Tender Documentation And Its Attachments On The Profile Of The Contracting Authority Https://Ezak.Kr-Vysocina.Cz/Vz00011897.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 77485290
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.