Irrigation Works – Mezőgazd Production Capacity Development Vp2-4.1.4-16. As A Result Of This Public Procurement Process, The Tenderer Wishes To Implement The Development Of An Irrigation System With The Construction Of The Associated Solar Park. The Purpose Of The Development Is To Increase The Yield Of Crop Cultivation In The Area Included In The Water Rights License With The Appropriate Amount Of Irrigation Water Applied During The Development Stage Of The Vegetation. This Requires The Purchase Of Irrigation Water, Its Transport, Its Temporary Storage And Application Using Appropriate Technology. The Purpose Of The Development Is To Implement A Water And Energy-Saving Irrigation Plant With A Center Pivot (Circular) System In The Outskirts Of Mezőkövesd And Tard On An Agricultural Area Of 463 Ha By Practicing Sustainable Water Management Activities And Using Surface Water Resources. The Irrigation Plant And Its Facilities To The North Of The Inner Area Of Mezőkövesd, No. 2511. It Is Located On The East And West Sides Of The Road, Touching Properties Outside Mezőkövesd And Tard. The Facilities Affect Cultivated (Plowed) And Reclaimed (Road, Hór Stream) Areas In The Outskirts. The Facilities: Water Extraction Structure, Damming Structure, Pumping Station, Underground Pressure Pipeline, Irrigation Equipment. The Tenderer Draws The Attention Of Tenderers That All Offered Irrigation Equipment Must Be From The Same Manufacturer And Of The Same Type. Irrigation Method Of The Investment: By Operating Sprinkler, Center Pivot Equipment; Method Of Irrigation Operation: Gravity Water Extraction From The Hór Stream, Automatic And Remote-Operated Pump Station Sunken, Etc. With Pumps Operating In A Shaft, With 15 (Fifteen) Central Pivot Irrigation Devices Equipped With An Underground Pressure Pipeline. The Pumping Station Etc. Is Carried Out Through A Water Extraction Structure. Gravity Water Introduction Into The Shaft. On The Upstream Side (Hór Stream) A Prohibited Structure Is Being Built With A Crane. Above The Pipe Culvert, In The Coastal Lane, Load Distribution Vb. Will Be Placed. In The Bed Of The Water Course, A 5-Meter-Long Bed Cover Is Built. The Task Of The Pumping Station Consisting Of 6 Pumps Included In The Water Rights License Is To Provide Controlled Water Supply To The Irrigation Equipment By Ensuring The Necessary Water Flow And Pressure. Pump Design: 6 Pcs., Vb. Electric Submersible Pump Installed Vertically In The Shaft, Equipped With A Casing Pipe, Fixed On The Shaft Floor, With Motor And Pump Protection, With Frequency Changer Control. For The Operation Of The Pumping Station, A New Damming Structure With A Bed Cover Is Being Built In The Bed Of The Hór Stream. The Storage Capacity Of The Riverbed Section Between The Reservoir Draining Structure And The Damming Structure Will Be: 760 M3. A Total Of 15,682.8 M Kpe Main And Side Lines Will Be Built From The End Point Of The Surface Pressure Pipeline Of The Pumping Station, And The Irrigation Equipment Will Be Connected To The Hydrants Of The Pipelines On The Surface. This Investment Is Carried Out On The Basis Of A Water Rights Establishment Permit. The Solar Park Is A 364.5 Kw Dc Power, 300 Kva Connection Power, Ground-Mounted Isolated Solar Power Plant, Which Is Intended To Provide Energy For The Irrigation Plant. For The Joint Handover Procedure, The Instrument
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 77336323
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.