Landscaping Work – Mpi For Microstructure Physics, Extension Institute: Landscaping. Civil Engineering - Type Of Work: Earthworks, Shoring Work, Dewatering Work, Pipeline Construction For Drinking Water And Extinguishing Water, Drainage Canal Construction For Rainwater And Dirty Water. Scope Of Services: - Approx. 2,000 M³ Earthworks Up To 3.0 M Deep For Sewer Construction - Approx. 4,000 M² Pipe Trench Shoring Up To 3.0 M Deep - Approx. 420 M Rainwater Sewer Up To Dn 250, 10 Inspection Shafts Stb - Approx. 450 M Dirty Water Sewer Up To Dn 200 , 16 Control Shafts Sbt - Approx. 25 Pieces Of Sw Sewer Drainage With Overpumping - Approx. 50 M Drinking Water Pipe Dn 50 Pe - Approx. 70 M Fire Water Pipe Dn 80 Pe - 1 Rainwater Pumping Station - 1 Dirty Water Pumping Station - 1 Rainwater Cistern - Approx. 250 M Cable/Protective Pipe Trenches For Third-Party Media. Galabau - Type Of Work: Demolition Work, Earthworks, Road Construction Work, Drainage Work, Concrete And Foundation Work, Stamped Concrete Work, Installation Of Fences, Lights And Equipment Scope Of Services: - Approx. 2500 M2 Demolition And Disposal Of Concrete And Natural Stone Paving - Approx. 800 M3 Collection And Disposal Substructure - Approx. 45 M Demolition Of Stairs - Approx. 25M Demolition Of Drainage Channels - 7 Courtyard Inlets - Approx. 50 M Demolition Of L-Stone Wall (0.8-1.00 M High) - Approx. 1800 M³ Loosen And Remove Soil For Paving - Approx. 200 M³ Soil For Strip Foundations Loosen Walls/Foundations, Remove - Approx. 100 M³ Excavated Soil For Cable Trench - Approx. 1100 M³ Combined Frost Protection Base Layer - Approx. 450 M Curb - Approx. 400 M Flat Steel As Edging - Approx. 2200 M2 Paving Concrete Block - Approx. 1000 M2 Slab Concrete Block - Approx. 130 M Drainage Channels Nw 100 - Approx. 30 M Drainage Channel Nw 200 - Approx. 14 M Facade Gutter/Box Gutter - Approx. 6M Facade Gutter/Radial Gutter - 6 Yard Inlets - Approx. 90 M Steps - Approx. 25 M³ Foundations - Approx. 42 M Angle Supports (0.3-2.3M High) - Approx. 280 M/ 80 M3 Seat Walls Made Of Stamped Concrete ( Approx. 0.6-1.3 High, 0.4 Wide) - - Approx. 95 M3 Strip Foundations Stamped Concrete Walls - Approx. 65 M3 Clean Layer / Under Foundations - 3 Pcs Surface-Mounted Wall Lights, 3 Pcs Recessed Wall Lights, 6 Pcs Bollard Lights - 6 Mast Lights, 3 Pcs Spotlights With Ground Spike, 1 Piece Of Recessed Ground Light - 7 Pieces Of Impact Protection Bollards, 2 Pieces Of Bollards That Can Be Removed - 25 Pieces Of Bicycle Bars - Individual Foundations For Gas Tanks, Storage Areas, Garbage Shelters, Etc. Approx. 30 Pieces, Approx. 50 M3 - 3 Benches With Backrests Made Of Existing Wooden Material With A Steel Substructure - 2 Benches Without Backrest Made Of Existing Wooden Material With Steel Substructure - 18M Seat Cover With Led Lighting Made Of Existing Wooden Material - 40 M Fence Double Rod Mat, 2M High, 4 Double Gates, 2 Gates Special Note Regarding Bidding Questions Due To Special External Events (E.G. Sars-Cov-2 Or Ukraine War): When Preparing Your Offer, Please Take Into Account Any Possible Or Recognizable Impairments, E.G. With Regard To The Availability Of Materials And Products, Workers, A Possible Delay In Providing The Required Evidence, And Effects On Any Subcontractors
|