Floor Laying And Covering Work – Bodenbelagsarbeiten. Delivery And Installation Of: - Rubber Floor Covering, Homogeneously Smooth, - Rubber Skirting Board, - Rubber Stair Covering, On Platforms And Steps, - Floor Covering As A Woven Carpet, Made Of Polyamide, Including Moisture Measurement, Fill The Surface, Apply A Primer, Sand The Surface, Vacuum The Cement Screed, Close Cracks , Creating Recesses, Adapting To Rising Components Without Base Cover, Permanently Elastic Jointing, Cutting Off Excess Edge Insulation Strips, Covering Floor Tanks And Inspection Covers, Initial Care. Supply And Installation Of End Profiles, Stair Nosing Profiles, Floor Indicators As Individual Indicators In Stud Form And Flat Steel Profiles For Separating Coverings In Fire Protection Door Areas. In The Total Execution Time, A Work Interruption Of 4 Weeks Must Be Taken Into Account Between The Work In The Basement And The Subsequent Work On The 5Th Floor. The Interruption Is Not Part Of The Stated Total Execution Period Of Seven Months.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 77215401
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.