Executive Project Of Concrete Structure (Including Foundation)Executive Project Of Concrete Structure (Including Foundation), Executive Electrical And Logic Projectelectrical And Logical Executive Project, Executive Project Of Hydro Sanitary Installationsexecutive Project Of Hydro Sanitary Installations, Executive Project Of Spdaexecutive Project Of Spda , Executive Project For Medicinal Gasesexecutive Project For Medicinal Gases, Executive Project For Fire Prevention And Fightingexecutive Project For Fire Prevention And Fighting, Supply And Placement Of Construction Sign In Galvanized Sheet #26, Esp. 0.45Mm, Dimension (3X1.5)M, Plotted With Vinyl Adhesive, Affixed With 4.8X40mm Rivets, On 20X20mm Metal Structure, Special. 1, 25Mm, Including Support In Autoclaved Eucalyptus Painted With Pva Paint. Closing Of Work In Plywood Sheet, Thickness 12Mm, With Module In The Dimension Of (110X220) Cm, Including Latex Paint (Pva) With Two (2) Coats, Exclusive Opening For Fixed Protective Foam Door For Closing Of Work In Plywood Sheet , Exclusive Gate Opening, Land Cleaning, Including Weeding, Raking With Spacing Up To (20) Meters And Controlled Burningland Cleaning, Raking With Spacing Up To (20) Meters And Controlled Burning, Temporary Connection With Air Power Input, Cemig Standard, Installed Load From 15.1Kva To 30Kva, Three-Phase, With Underground Output, Including Pole, Meter Box, Circuit Breaker, Bus Bar, Grounding And Accessories Temporary Connection With Air Power Input, Grounding And Accessories, Temporary Water Connection For Site, Including Hydrometer And Water Measuring Easel - Main Entrance, In Galvanized Steel Dn 20Mm (1/2) - Utility Standardprovisional Water Connection For Site, In Galvanized Steel Dn 20Mm (1/2) - Utility Standard, Work Location With Running Board Template , Punctures Every 2.00M, Reuse (2X), Including Monitoring Of A Topographical Team To Mark A Topographical Point, Work Location With Template Of Running Boards, Including Monitoring Of A Topographical Team To Mark A Topographical Point, Construction Shed For Deposit And Typical Tooling -I, Internal Area 14, 52M2, In Resin Plywood Sheet, Including Furniture (Small Work, Effective Up To 30 Men), Der-Mg Standard Construction Barrier For Deposit And Type-I Tooling, Der-Mg Standard, Manual Excavation Of Trench With A Depth Of Less Than Or Equal To 1.5M. Material Of Any Nature By Truck, Distance Greater Than 2Km And Less Than Or Equal To 5Km, Within The Urban Perimeter, Excluding Loading, Including Unloadingtransportation Of Material Of Any Nature By Truck, Including Unloading, Manual Piling At The Bottom Of A Ditch With Socket, Exclusive Excavation, Manual Piling At The Bottom Of A Trench With Socket, Exclusive Excavation, Lean Concrete, 1:3:6 Ratio, Prepared On Site With A Concrete Mixer, Without Structural Functionlean Concrete, Without Structural Function, Shape And Deformation Of Resin Plywood, Esp. 12Mm, Reuse (3X) (Fundacao)Forma E
|