Quotation Are Invited For Block 20 Hp/Lp Prds Control Valve Seat Ring Replacement Block 20 Hp/Lp Prds Control V 1032304776 Block 20 Hp/Lp Prds Control Valve Seat Ring Replacement; Size:20 In, Make Imi Cci, At M Station, Jebel Ali 1 Item-00001 Technical And General Specification Of Outsourcing Workm Station, Jebel Ali Power Stationtitle: Insitu Seat Ring Replacement Of Bloc K 20 Hp/Lp Prds Controlvalve; Size: 20 In, Make: Cciqty: 01 No.Duration: 03 Days.Tentative Schedule: 24.03.2024A.#Scope Of Work·#Mob Ilize Men/Equipment Within 02 Days Of Advance Notice.·#Get Ptw (Permit To Work) And Lc (Line Clearance) Document From Dewa.·#The Fol Lowing Documents To Be Submitted To Get Ptw,O#Method Statement.O#Risk Assessment Of The Work.O#Tool Box Talk Report.·#Ensure Area Is Correctly Secured And Safe To Work In All Aspects.·#Conduct Site Survey And Safety Inspection To Assess The Workingenvironment.·#If The Working Environment Safe, Then Proceed With The Followingsteps.·#Mark The Parts Orientation Before Dismantling.·#Decouple And R Emove The Actuator.·#Disassemble The Valve Internals.·#Install Inline Boring Machine And Cut Seat Seal Weld And Pull-Outexisting Sea T.·#Grind And Clean The Welded Area To Insert New Seat.·#Install New Seat Ring & Prepare For Welding.·#Preheat The Seat / Body Weldi Ng Area. (Heating Arrangement &Technician Will Be Provided By Dewa)·#Weld The Seat On The Body As Per Applicable Wps By Oem. (Welder Willbe Provided By Dewa)·#Check / Blue Match The Seat Ring & Plug Contact Area.·#Carry Out Lapping If Required.·#Re Assembly The Va Lve, Mount Actuator, Calibrate And Stroke Test.·#Dewa Engineer Shall Be Consulted In Case Of Any Indication Ofdamages.·#Replacement Of Spares Shall Be Decided During The Joint Inspection.·#All Bolts & Nuts To Be Cleaned And Lubricated.·#The Flange Bolts Are To Be Torque Tightened.·#Hot Tightening Of The Bolts To Be Done After Start Up.·#Final Inspection Shall Be Done By Dewa Personnel.·#Imi Cc I Service Specialist/Engineer To Be Assigned For The Job.·#02 Skilled Helpers Will Be Assigned By Dewa To Carry Out The Job.·#Imi Cc I Service Specialist/Engineer Has To Complete The Job Withinthe Target Time.·#De-Mobilize Men And Equipment After Completion Of The Job.·#Inspection & Maintenance Report To Be Submitted To Dewa. Inspectionreport With Photos To Be Provided.·#Seat Cutting Machine An D Related Tools Are In Contractors Scope.·#Proper And Tested Tools To Be Used.·#All Lifting & Power Tools Should Be With Valid Test Certificate.·#The Contractor Shall Visit The Site And Be Fully Familiar With Thework Scope Before Submitting The Bid.·#Dewa Scope:O #Spares#O#Welder With Welding Machineo#Scaffolding Erection At Siteo#02 Skilled Helpers.B.#Warranty·#The Warranty Period For The Wor K Shall Be One Year From The Date Ofcompletion Of Work Certified By Dewa.·#In Case Of Any Damage/Defect Of The Work Carried Out Unde R Thiscontract Within This Warranty Period, The Contractor Shall Attend Andcarry Out The Necessary Repair Work And Rectify The Defec T Within Shortperiod Without Affecting The Production Of Electricity And Water.C.#General Terms & Conditions·#The Contractor Shall V Isit The Site And Make Himself Fully Familiarwith The Work Scope, Plant Access, Facilities, Complexities, Safetymeasures Etc., Befor E Submitting The Bid.·#The Contractor Shall Ensure Housekeeping On A Daily Basis And Thecontractor Shall Be Responsible For All Wast E Material Disposals Todesignated Places.·#All Dewa Safety & Environment Policy, Rules And Regulation Shall Befollowed At Work Site During The Execution Of The Work. The Contractor#Sengineer Should Be Familiar With Safety Regulations While Working In Ahazardous Ar Ea.·#Scaffolding If Required Shall Be Arranged By Dewa.·#Crane If Required Shall Be Arranged By Dewa.·#All Rigging And Transporting Equipment Should Be Arranged By Thecontractor. These Equipment Should Be Duly Tested And Certified By The3rd Party Inspection Agency And The Certificates Should Be Produced Ondemand. Qualified Rigger, Mechanics Should Be Provided.·#The Work Shall Be Executed Under Dewa Supervision And As Perquality/Schedule Requirement.·#Contractor#S Supervisor Shall Be Available At Site Throughout Theperiod O F Work.·#Entry Permits For The Staff/Workers Should Be Applied With Passportcopies Having Valid Visa. Persons, Whose Names Are Not A Vailable In Thelist, Will Not Be Allowed To Enter The Powerhouse.·#Entry Permits For The Vehicle Should Be Applied With Copies Ofveh Icle Registration.·#Dewa Will Arrange Necessary Ptw / Lc / Hwp From Operation, Chemicallab / Fire Department Clearances To Carry Out The Scope Of Work Underthis Contract.·#The Contractor Upon Receiving The Work Permit Shall First Ensure Asafe Working Condition.·#A And Tools Brought In Shall Be Declared At Power Station Security Gate And The List Of These Items Shall Be Signed By Dewasecurity. The Copies Of These Documents Shall Be Lodged With Dewaen Gineer In-Charge On Daily Basis. This Document Will Be The Basis Forthe Clearance (Gate Pass) To Take Them Out On Completion Of The Job.·#Service Air, Electricity And Water For Work At Dewa Site. It Is Theresponsibility Of The Contractor To Have His Own Arrangeme Nt Inextending The Electricity And Water Utility To His Places Of Workincluding Lighting.D.#Covid-19 Precaution Safetyaccess To Japs For Contractors, Suppliers, Consultants And Visitors Areallowed Only If,·#They Are Vaccinated And Vaccination Records Are Attached Along Withgate Pass Request.·#All Company Staff Holding Dewa Gd Security Gate Pass Shall Be Checkedat Accommodation And Them On Boar D In Bus/Vehicle Is Free From Cough,Sneezing & High Body Temperature Below 38.1.·#Contractor Shall Submit Undertaking Letter & Trave L Declaration Ofall Staff As Per Prescribed Form. 1 Au Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/Get/2332302808
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 74215301
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.