Prior Information Notice For Research Production Battery Cell Münster I 2.Ba Fab. Nrw.Urban Gmbh & Co. Kg (Client) Intends To Build A New Building Including Technical Equipment And Associated Outdoor Facilities To Accommodate The Battery Cell Research Production (Ffb) At The Münster Location. In This Case, The Client Acts In Trust For The State Of North Rhine-Westphalia, Which Is Financing The Construction Project With State Funds. The Fraunhofer Society For The Promotion Of Applied Research (Fhg) Is Intended To Operate The Ffb And Use The New Building. The Ffb Battery Cell Research Production Is Intended To Accelerate The Innovation Process For The Development Of New Cell Production Concepts And Their Implementation In Industrial Production. It Thus Complements The Bmbf Umbrella Concept “Battery Research Factory” With The Module “Battery Cell Production” And The Excellent Research Scene In Germany Are Another Crucial Building Block In The Area Of Large-Scale Battery Cell Production. The Ffbs Core Offering Is The Evaluation Of The Scalability Of Innovative, Industry-Relevant Cell Manufacturing Concepts, Which Includes And Further Develops The Existing Lithium-Ion Technology. In Perspective, The Ffb Can Also Develop Future And Post-Lithium-Ion Cell Concepts (Including New Materials, Manufacturing Processes, Process Technologies And Manufacturing Systems) And Advance Them To Zero Or Small Series Production. The Training Of Specialist Staff Along The Entire Educational Chain And The Intended Integration Effect Of The Research Scene Should Generally Lead To An Increase In The Attractiveness Of Germany As A Location For Battery Cell Production. The Battery Cell Research Production Will Be Implemented In Two Construction Phases. The Two Construction Phases Will Be Implemented At Different Times On Two Properties. The Planned Building For The 2Nd Construction Phase Is To Be Built On Parcel 257 In Münster Amelsbüren On The Bab 1 Federal Highway And The Dortmund Ems Canal. The Planning Services (Lph 19 According To Hoai) Are Provided By A General Planner. The Planned Building Is Organized Orthogonally, With A Striking Trapezoidal Shape In The Floor Plan. The Building Is Approx. 150 M Wide In The East-West Direction, Approx. 175 M On The West Side And Approx. 100 M Long On The East Side. A Gross Floor Area Of Around 36,000 M2 Bgfr Can Be Assumed (Of Which Construction Floor Area Is Around 2,600 M2 Kgf). Structurally, The Ffb Consists Of Two Main Building Parts: Manufacturing Or Production In The West And The Office With Ancillary Areas, The Workshop And The Laboratories In The East. It Is Currently Being Considered That The Client Will Bundle And Award The Construction Services In “Partgu Packages”.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 71955132
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.