Tenders Are Invited For Execution Of Groundwater Intake From Tertiary Formations - Well Hole No. 1A (Replace ...
Tender Notice
TenderID
61054224
Tender Brief
Tenders Are Invited For Execution Of Groundwater Intake From Tertiary Formations - Well Hole No. 1A (Replacement) At The Intake Of A Group Rural Water Supply System In Nied wiada
1. The Subject Of The Contract Is The Execution Of An Exploratory And Exploitation Drilling Well No. 1A In The Village Of Nied wiada In Order To Intake Groundwater From Neoneg Formations With A Planned Depth Of Approximately 115.0 M In Accordance With The Geological Works Project For The Execution Of Groundwater Intake From Tertiary Formations - A Well No. 1A (Replacement) Approved By The Decision Of The Staroste Of owicz, Reference Number: Os.6530.5.2020 Of July 23, 2020 - Appendix No. 12 To Swz.2. Location Of Geological Works: Plot No. 126, Precinct Nied wiada, Commune Of owicz, Poviat Of owicki, Voivodship Of d .3. The Order Provides For The Performance Of Geological Works And Works In The Following Scope: - Construction Of Well No. 1A (Replacement) With A Mechanical And Rotary System With The Right Circulation Of The Bentonite Mud To A Depth Of About 100.0 M And The Left Circulation Of The Biodegradable Polymer Mud In The Depth Range Of 100.0-115, 0 M And The Final Diameter Of The Hole 380 Mm, - Foundation Of The Well - Slotted Filter, - Pumping, Purifying And Measuring The Well Hole, - Carrying Out Geodetic Works Within The Scope Specified In The Geological Works Project (...) Approved By The Decision Of The Staroste Of owicz, Sign: Os. 6530.5.2020 Of July 23, 2020, - Laboratory Tests - Physicochemical And Bacteriological Analysis Of Water, - Accompanying Works, - Development Of As-Built Documentation - Hydrogeological Documentation, In Accordance With The Requirements Set Out In The Act Of June 9, 2011 Geological And Mining Law (I.E.: Journal Of Laws Of 2022, Item 1072, As Amended) And Submitted Submission To The Ordering Party In 5 Copies In The Paper Version And 5 Copies In The Electronic Version (Cd),4. The Order Does Not Include The Liquidation Of Well No. 1. 5. Guarantee: 5.1. The Length Of The Quality Guarantee Period For The Construction Works Performed And The Delivered And Built-In Materials Is Min. 36 Months From The Date Of Signing The Final Acceptance Report And Is A Criterion For Evaluating Tenders. 5.2. The Contracting Authority Defines It For A Period Ranging From 36 Months (Minimum Term) To 60 Months (Maximum Term). 5.3. The Contractor Is Liable Under The Warranty For Physical Defects On The Terms Set Out In 12 Of The Draft Agreement.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 61054224
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.