Quotation Are Invited For D-Station Phase-2 Boiler 8 Air Pre Heater Heating Element Replacement. Scope Of Work For Air Preheater Basket Replacement In D-Station Phase-2, Boiler No 8 -#Contractor To Visit The Site Before Submittin G The Quotation - Contractor Must Have Previous Experience On Executing The Similar Type Of Job -#Opening Of Duct Top Side Bolted Doors To Facilitate The Baskets Replacement -#Cutting Of Duct Plates If Required For Access -#Removal Of Insulation -#Installation O F Monorail For Removing The Aph Baskets -#Removal Of Hot End And Cold End Baskets -#Level Checking Of Sector Plate And Attending Ali Gnment Of The Same For Any Deviation. -#Checking/Setting/Repairing Of Static Seals, Axial Seals -#Checking/Inspection/Repair And Set Ting Of Radial, Axial And Bypass Seals At Cold And Hot End -#Inspect/Repair/Rectification Of All Sector Plates At Cold And Hot End S Ides By Weld Repair /Flush Grinding - #Inspect / Repair / Rectification / Alignment / Set Ting Of Axial Seal Plates With Respect To Sector Pla Tes And Seals -#Inspect/Repair/Rectification Of T-Bar At Cold And Hot End Sides Including Replacement Of Eroded Bolts And T-Bar Hold Ing Angles. -#Checking And Alignment Of Guide And Support Bearings Including Oil Replacement And Flushing Of Both End Side Bearing W Ith Filling New Oil. -#Overhauling/Servicing And Replacement Of Guide Bearing Assembly/Oil Level -#Transportation Of Requisite Steel Material And Baskets From Mmd Sub Store / Main Store. -#Gap Checking/Clearances Of Radial Seal And Recording The Same, If Seal Is F Ound Disturbed, It Is To Be Reset As Per Actual / Design Value. -#If Any Seal Found In Badly Damaged Condition, Contractor Has To Re Place The Same. -#Contractor Has To Detect The Puncture And Arrest The Same With New Patch Providing Work. -#Duct Casing Shield Plat E Welding If Found Any Crack/Damages -#Balancing Of Rotor By Manually Rotating The Rotor Assembly -#Preparing And Fixing Of Weights At Appropriate Place During Rotor Balancing -#Fixing Of New Of Hot End And Cold End Baskets -#Closing Of All Manholes Doors By Provi Ding New Sealing Rope. -#Witnessing Trial Run And Attending Defects If Any Like Rubbing Noise, Fouling Etc# By Adjustments -#Work Sh All Have To Be Carried Out Strictly On War-Foot Basis As Per Instruction Of Mmd. -#Final Report To Be Submitted. Hot End - One Container - 5 Box, Total 12 Container X 5 Box - 60 Nos Per Unit Cold End - One Container - 1 Box, Total 12 Container X 1 Box - 12 Nos Pe R Unit For Site Visit, Pl. Contact Mr. Aravind # 0526160062 - Aravind.Nair@Dewa.Gov.Ae Qty: 1 D-Station Phase-2 Boiler 8 Air Pre Heater Heating Element Replacement Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/2332202528
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 57460296
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.