Modification Of A Contract Concession During Its Term Turbine Oil Delivery To Paks Nuclear Power PlantTurbine Lube OilsShort Description Transportation Of Turbine Oil In The Blocks Of The Paks Nuclear Power Plant And The Removal And Treatment Of The Resulting Waste Oil As Follows 1 Delivery Task 420 000 Kg Iso 8068 2006 Standard L Tsa Type Iso Vg 32 Viscosity Class Or Equivalent Turbine Oil Hereinafter Referred To As Turbine Oil Adjusted To The 2020 And 2021 Shutdown Periods Of Nuclear Power Plant Blocks At The Following Pace 1 Shipping Rate Delivery Deadline 2020 05 22 Quantity In Kg 70 0002 Delivery Rate Delivery Deadline 2020 07 23 Quantity In Kg 115 0003 Shipping Rate Delivery Deadline 2020 09 24 Quantity In Kg 113 0004 Delivery Rate Delivery Deadline 2021 07 02 Quantity In Kg 122 000Quantity In Kg Total 420 000 When The Turbine Oil Is Stored The Turbine Oil Quantities Are Measured In A Volume Unit M3 The Mass Unit Kg Is Calculated From The Amount Of Measured Volume Volume Turbine Oil Density Documentation Requirements The Manufacturing Quality Certificate Of Turbine Oil Which Includes Compliance With The Quality Requirements Contained In The Standard And The Security Data Sheet The Successful Tenderers Statement That The Type Of Turbine Oil Delivered In The Paks Nuclear Power Plant So Far Can Be Mixed With Mol Turbine 32 K Turbine Oil So Far Without Causing A Failure 2 Hazardous Waste Management Disposal Task 354 600 Kg Waste Turbine Oil Receipt Disposal And Treatment Or Disposal Of The Following Pace 1 Take Pack Deadline For Shipping 2020 04 23 Delivery End Limit 2020 04 30 Quantity In Kg 70 0002 Take Pack Deadline For Landing 2020 07 09 Delivery End Limit 2020 07 16 Quantity In Kg 94 0003 Take Package Deadline For Transport 2020 09 10 Delivery End Limit 2020 09 17 Quantity In Kg 92 0004 Package Pack Deadline For Landing 2021 06 18 Delivery End Limit 2021 06 25 Quantity In Kg 98 600Quantity In Kg Total 354 600 When Removing Turbine Oil The Turbine Oil Quantities Are Measured In A Volume Unit M3 The Mass Unit Kg Is Calculated From The Amount Of Measured Volume Volume Turbine Oil Density Documentation Requirements Following The Transfer Of The Successful Tenderer To The Contractor For The Disposal Of Waste Oil The Contracting Authority Must Pass On The Contracting Authority 4 Instant Accompanying Tickets Required To Deliver Hazardous Waste 4 Instances Of Disposal Of Waste Disposal The Receipt Of Hazardous Waste The Operator Carrying Out Waste Disposal By The Signature Of The Page And The Stamp Imprints The Receipt Of Hazardous Waste The Successful Tenderer Is 225 2015 On Detailed Rules For Certain Activities Related To Hazardous Waste Viii 7 Government The Details Of The Tasks Are Contained In The Public Procurement Technical Specifications That Are Part Of The Public Procurement Document Type Of Buyer Utilities EntityType Of Contract SuppliesType Of Procedure Open ProcedureRegulation European Union With Participation By Gpa CountriesType Of Bid Not ApplicableAward Criteria Not Applicable Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 44674614
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.