The Army Contracting Command Aberdeen Proving Grounds Acc Apg Tobyhanna Division Tobyhanna Pa 18466 Intends To Issue A Request For Proposal Rfp For A Firm Fixed Price Requirement For The Turn Key Design Supply Delivery Off Loading Transporting Locating Installation Cleaning Assembly Set Up And Training For One 1 Each Computer Numerical Controlled Cnc Double Column Vertical Machining Center Vmc At Tobyhanna Army Depot Tyad In Tobyhanna Pa 18466 The Contractor Shall Supply All Materials Supplies Freight Delivery Tools Equipment Consumables Labor And Supervision For The Turn Key Design Supply Delivery Off Loading Transporting Locating Installation Cleaning Assembly Set Up And Training For The Machine The Contractor Shall Also Disconnect An Existing Vmc And Transport It Another Building On Site The Contractor Will Also Be Responsible For Disconnecting All Equipment Associated With The Central Coolant Filtration System On The Existing Vmc And Reconnecting It To The New Vmc And Assure It Is Operating As Specified The Contractor Shall Supply Only New Machines And New Associated Equipment Used And Refurbished Machines And Used And Refurbished Equipment Are Unacceptable And Will Not Be Considered All Repair And Replacement Parts For The Machine And Associated Equipment Shall Be New All Repair And Replacement Parts Shall Be Available For Purchase And Supplied From Within The Continental United States See The Attached Draft Statement Of Work Sow For Requirement Details This Is Only A Draft Sow And Is Subject To Change Without Any Notice The Final Statement Of Work Will Be Released With The Solicitation When Issued A Site Visit Will Be Scheduled At Time Of Solicitation And It Is Advised That Prospective Offerors Attend The Site Visit Is For The Purpose Of Prospective Offerors To Consider The Layout And Floor Space Of The Project Area And To Enable The Viewing Of The Delivery Utility And Installation Site The Site Visit Shall Be Used By The Prospective Offerors To Identify Structures Or Conditions That May Impede Obstruct Or Prevent Completion Of The Work It Shall Be The Responsibility Of The Prospective Offeror To Identify Obstructions And Impediments To The Project And To Make Appropriate Accommodations For Correction And Modification To Mitigate The Problem If A Corrective Measure Conflicts With Other Requirements Listed In The Sow Or Is Outside The Work Area The Contractor Shall Identify These Issues In The Proposal Submittal To The Government Answers Not Contained In The Sow To All Questions That Are Raised During The Site Visit Shall Be Submitted In Writing Should The Contractor Fail To Identify An Obstruction And Hindrance To The Project That Is Identifiable From A Site Visit The Contractor Shall Provide A Solution To The Problem That Is To The Satisfaction Of The Government And At No Additional Cost To The Government It Shall Be The Responsibility Of The Contractor For All Dimensioning Of The System Including All Auxiliary Pieces And Materials It Shall Be The Responsibility Of The Contractor To Supply His Personal Protective Equipment Ppe For The Site Visit At A Minimum The Ppe Needed Is Protective Eyewear And Protective Footwear A Contractor In Non Compliance With The Ppe Requirement Will Not Be Permitted On The Site Visit It Shall Be The Responsibility Of The Contractor To Verify All Machine And Worksite Dimensions And Ensure The Machine And Ancillary Pieces Fit Within The Available Floor Space At The Project Installation Worksite In Bldg 1C Bay 2 The Contractor Shall Be Responsible To Verify Overhead Clearance Dimensions For The Machine And Ancillary Pieces At The Project Installation Worksite In Bldg 1C Bay 2 Tyad Currently Uses Cnc Software S Mastercam Computer Aided Manufacturing Cam Software For The Programming Of All On Site Vmcs The
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 39667224
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.