Item Unique Identification And Valuation Mar 2016 19 Higher Level Contract Quality Requirement 8 Wide Area Workflow Payment Instructions Dec 2018 16 Invoice And Receiving Report Combo Inspection Site Source Final Acceptance Source Tbd Sprpa1 Tbd Tbd See Schedule Tbd N A N A Tbd N A Tbd N A N A N A Navy Use Of Abilityone Support Contractor Release Of Offeror Information 3 18 1 Equal Opportunity Sep 2016 2 Equal Opportunity For Veterans Jun 2020 4 Equal Opportuity For Workers With Disabilities Jun 2020 2 Buy American Free Trade Agreements Balance Of Payments Program Basic Deviation 2020 O0019 Jul 2020 3 Estimate Of Percentage Of Recovered Material Content For Epa Designated Products May 2008 1 Alternate A Annual Representations And Certifications Nov 2020 13 Buy American Free Trade Agreements Balance Of Payments Program Certificate Deviation 2020 O0019 Jul 2020 3 Buy American Balance Of Payments Program Nov 2014 1 Royalty Information Apr 1984 1 Annual Representations And Certifications Mar 2020 13 332919 500 Facsimile Proposals Oct 1997 1 Notice Of Priority Rating For National Defense Emergency Preparedness Andenergy Program Use Apr 2008 2 Evaluation Criteria And Basis For Award 1 Special Emergency Procurement Authority 1 Scope 1 1 Markings Shall Be In Accordance With Mil Std 130 1 2 Pre Award Post Award Requirements Due To The Critical Use Of This Item And Its Quality History A Pre Award Survey And Post Award Conference May Be Required For All New Manufacturers For All Previous Sources A Post Award Conference May Be Recommended 1 3 The Contractor Shall Include On The Detailed Process Operation Sheets Developed 1 All In House Manufacturing Processes And 2 The Identity Of All Manufacturing Sources Performing Processes Operations Outside Their Facility These Sheets Shall Not Be Revised Or Altered After The Successful Completion Of First Article Or Production Lot Testing Without Approval From The Basic Design Engineering Activity Via The Pco 1 4 Unless Otherwise Specified For Fabricated Parts The Inspection Method Sheets Final Inspection Sheets Shall List The Characteristics Of Each Item Produced Under The Contract The Manufacturer Shall Be Required To Provide Certifications Of All Raw Material Including Castings And Forgings The Material Source Shall Be Identified And The Documentation Shall Be Able To Identify The Customer And Or Contract Number The Manufacturer Shall Maintain All Raw Material Documentation For A Minimum Of Ten 10 Years The Contractor Is Responsible For Providing Completed Inspection Method Sheets Final Inspection Sheets Showing The Actual Dimensions Taken For All Characteristics In Addition Critical Characteristics Shall Be Annotated 1 5 The Components Being Acquired Under This Solicitation Have Been Classified As Flight Critical Requiring Engineering Source Approval By The Naval Air Systems Command Only Those Companies Who Have Submitted Requests For Source Approval And Been Approved Will Be Eligible For Award Under This Solicitation Any Company Not Previously Approved May Submit A Source Approval Request To The Contracting Officer Naval Inventory Control Point See Block 10 Of The Sf33 For Name And Code The Source Approval Request Shall Contain The Following Documentation And Shall Be Submitted By The Closing Date Of This Solicitation A Copy Of Complete Configuration Drawings For A Similar Item S Which Your Company Has Produced Within The Past Three Years Including Test Procedures For Which Your Company 1 Has Been Qualified To Manufacture And 2 Which Is Similar I E Requires The Same Materials Manufacturing Processes Inspections Tolerances And Similar Application As The Item S For Which You Are Seeking Approval B Copy Of The Complete Process Operation Sheets Used To Manufacuture The Similar Item Including But Not Limited To Detailed Shop Sketches These Plans Must Note Those Operations And Processes Performed By Subcontractors Vendors C Complete Copies Of Purchase Orders Shipping Documents Etc That Document Delivery Of Production Quantities Of The Part To The Original Equipment Manufacturer Or Military Service Provide The Most Recent Copies Of The Documents D A Detailed Comparative Analysis Of The Differences Similarities Between The Similar Part And The Part S For Which You Are Seeking Approval This Analysis Should Include Materials Configuration Tolerances Process Requirements Dimensions Castings Forgings Etc E Copy Of Inspection Method Sheets Used In The Manufacturing And At Final Inspection These Sheets Should Include Actual Tolerance Print Requirements Inspection Devices Sources Performing The Operation And Level Of Inspection Critical Characteristics Should Be Discernible From All Other Characteristics The Above Requirements Are A Subset Of Requirements Specified In The Aso Source Approval Information Brochure Dated January 1995 The Submission Of This Data Subset Is Contingent Upon And In Consideration Of The Submitting Contractor Meeting All Other Requirements Specified In This Solicitation To Include A Bilateral Agreement With Mda Which Includes Availability Of Complete Data Mrb Disposition Etc Any Company Not Having Such Agreement But Desiring To Seek Engineering Source Approval Will Be Required To Submit Data Meeting All Requirements Of The Aso Navicp Source Approval Brochure 1 6 The Material Covered In This Contract Purchase Order Will Be Used In A Crucial Shipboard System Enabling The Launch And Or Recovery Of Aircraft The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In A Serious Personnel Injury Loss Of Life Loss Of Vital Shipboard Systems Or Loss Of Aircraft Therefore The Material Has Been Designated As Critical Material And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material 1 7 Articles To Be Furnished Hereunder Shall Be Manufactured Tested And Inspected In Accordance With Nawc Lakehurst Drawing Number 80020 610150 9 Revision An And All Details And Specifications Referenced Therein 1 8 Unless Expressly Provided For Elsewhere In This Clause Equipment Such As Fixtures Jigs Dies Patterns Mylars Special Tooling Test Equipment Or Any Other Manufacturing Aid Required For The Manufacture And Or Testing Of The Subject Item S Will Not Be Provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification 1 9 If Mil Std 454 Is Referenced In The Drawings Or In The Specification The Contractor Is Expected To Show Compliance With Ipc Eiaj Std 001C 2 Applicable Documents Drawing Data A315473 80020 M A Drawing Data A318426 80020 T A Drawing Data Mpr 1072 80020 A Drawing Data Mpr 1221 80020 R A Drawing Data Mpr 1299 80020 A Drawing Data Mpr 1294 80020 B A Drawing Data Naec 91 7616 80020 H A Drawing Data Neac Eng 6518 80020 Bl A Drawing Data 17 32283 80020 U A Drawing Data 17 32284 80020 M A Drawing Data 17 32286 80020 L A Drawing Data 17 42052 80020 L A Drawing Data 17 61755 80020 Ac A Drawing Data 316293 80020 M A Drawing Data 316294 80020 U A Drawing Data 317891 80020 D A Drawing Data 422886 80020 A A Drawing Data 424842 80020 C A Drawing Data 509441 80020 W A Drawing Data 509544 80020 P A Drawing Data 514364 80020 N A Drawing Data 517814 80020 G A Drawing Data 517815 80020 F A Drawing Data 517816 80020 F A Drawing Data 517817 80020 D A Drawing Data 517843 80020 D A Drawing Data 522404 80020 A A Drawing Data 523479 80020 C A Drawing Data 610150 9 80020 Al A Drawing Data 623406 80020 D A 3 Requirements Not Applicable 4 Quality Assurance 4 1 Unless Otherwise Provided For In The Contract Sample S Shall Be Returned To The Contractor And May Be Considered As Production Items Under The Contract Provided The Sample S Can Be Refurbished To Ready For Issue Condition And Provided The Sample S Have Inspection Approval Of The Cognizant Dcmao Qar Sample S May Be Shipped As Production Items Only After All Other Units Required Under The Contract Have Been Produced And Are Ready For Shipment 4 2 Mandatory Inspection Requirements 100 Procurement Contracting Officer Pco Mandatory Inspection Is Required And Shall Be Accomplished At Source Under The Surveillance And Final Approval Of The Cognizant Dcmao Quality Assurance Representative Qar During Production Mandatory Inspection Is Required To Be Accomplished By The Contractor As Follows A Level Of Inspection Loi 1 Critical Characteristics 100 Inspection Shall Apply 2 Major And Minor Characteristics Loi Shall Be In Accordance With A Sampling Plan Acceptable To The Qar B Critical Characteristics 80020 610150 9 C1 C3 M101 M105 Actual Dimensions Must Be Recorded C Major And Minor Characteristics 1 Shall Be Defined By The Contractor Subject To Qar Concurrence Unless Defined On Applicable Drawings And Associated Specifications 4 3 Government Production Lot Sample Testing Requirements A The Production Lot Sample S Shall Be 100 Selected At Random By The Cognizant Government Inspector Dcmao Qar Such Sample S Shall Be Submitted Via The Cognizant Government Inspector All Transportation Charges Prepaid By The Contractor Ship To Naval Air Warfare Center Aircraft Division Code Bl41600 B148 2 Hwy 547 Lakehurst Nj 08733 5125 Attention Paul Campos The Samples Shall Be Identified By Contract Number And Lot Number And Shall Be Clearly Marked As Follows Production Lot Samples Not Rfi Material Do Not Take Up In Stock B Such Samples Shall Be Delivered To The Testing Facility In Sufficient Time Prior To The Delivery Date Of The Production Articles To Allow A 60 Day Period For Testing By The Laboratory And Written Notification By The Contracting Officer Of The Approval Conditional Approval Or Disapproval Of The Samples Within 30 Days Of The Receipt Of The Samples The Testing Facility Shall Notify The Contracting Officer Naval Inventory Control Point Attn See Block 10 Of Sf33 For Name And Code Of The Results Of The Testing Together With A Recommendation For Approval Or Disapproval C In The Event The Contractor Does Not Receive Written Notification Of Approval Conditional Approval Or Disapproval Of The Samples For A Particular Production Lot Within 90 Days From Their Submission For Such Testing The Contract Delivery Schedule Shall Be Equitably Adjusted As Necessary D If The Contractor Fails To Deliver Any Production Lot Samples For Testing Within The Time Or Times Specified Or If The Contracting Officer Disapproves Any Production Lot Samples The Contractor Shall Be Deemed To Have Failed To Make Delivery Within The Meaning Of The Default Clause Of This Contract And This Contract Shall Be Subject To Termination For Default E In Order For A Production Lot To Be Acceptable All Samples Representative Of The Lot Must Pass All Of The Contract Requirements In The Event A Sample Fails To Pass Such Requirements The Lot Will Be Rejected In Such Event The Government May At Its Option And At No Additional Cost To The Government I Terminate All Or Any Portion Of This Contract For Default Ii Require The Manufacture Of A New Production Lot Or A Rework Of The Rejected Production Lot If The Means And Procedures Proposed By The Contractor For Rework Are Acceptable To The Government Or Iii Require The Submission Of Additional Samples For Test The Foregoing Procedures Shall Apply To New Or Reworked Production Lots In The Same Way As They Did To The Original Production Lot F For Each Additional Sample Or Each Resubmission Of A Modified Sample Which The Contractor Is Required To Submit For Approval Hereunder As A Result Of The Failure Of A Previous Sample To Conform To The Requirements Of The Specifications The Contractor Shall Pay To The Government The Costs Of Reinspection Shipping Examination And Retesting By The Government And The Contractor And His Sureties If Any Shall Be Liable For The Amount Of Such Costs G All Transportation Charges Incurred In The Submission And Return Of Any Production Lot Sample Shall Be Borne By The Contractor H Nothing Contained In The Foregoing Provisions Of This Clause And No Action Of The Government In Accordance Herewith Shall In Any Way Prejudice The Right Of The Government Under The Clause Of This Contract Entitled Default 4 4 Critical Manufacturing Processes Applies Heat Treat Applies Welding Applies Cadmium Plating Engineering Chrome Plating Nickel Chrome Plating Casting S Forging S Applies Mpr Material Processing Requirements 4 5 Special Inspection Requirements Applies Magnetic Particle Inspection Applies Surface Inspection Penetrant Inspection Radiographic Inspection Ultrsonic Inspection High Shock Test Mechanical Vibration Test 4 6 Final Inspection Requirement Due To The Critical Nature Of This Item Representatives Of The Buying Office And The Cognizant Field Activity Nawc Lakehurst Shall Be Notified By The Successful Contractor At Least 14 Days Prior To Presentation To The Dcm Qar Of The Items For Final Inspection So That They May Have The Option Of Witnessing The Final Inspection The Contractor Shall Notify By Email Or Telefax Pco And Nawc Lakehurst Qa Roy Janney Qa Rep At Fax 732 323 1381 To Arrange For The Final Inspection The Authority Of The Qar Shall Not Be Abrogated If The Notification Is Not Given To Both Sites Then The Qar Shall Not Accept The Units 4 7 In Process Inspection Requirements Due To The Critical Nature Of This Item It Is Necessary To Conduct In Process Inspections On Critical Component Features Attributes Or Manufacturing Processes The Contractor Shall Notify The Pco And Nawc Via Email Or Telefax Pco And Nawc Lakehurst Qa Roy Janney Nawc Qa Rep At Fax 732 323 1381 To Arrange For The In Process Inspection A Minimum Of 10 Days Is Needed For Advance Notice For Each Occurrence The Authority Of The Qar Shall Not Be Abrogated The Qar Shall Verify That Timely Notification Was Given All Parties Listed Below Characterisics To Be Inspected The Follow Item S Requires An Interim Inspection At The Contractor s Location I P N 17 42052 1 Stem Dimensional Inspection Per Drawing 17 42052 Prior To Nnext Assembly May Be Scheduled Concurrently With Spring Pin Installation Ii P N 610150 9 Valve Assembly Spring Pin Installation Iaw Note 19 Of Drawing 610150 The Contractor Shall Assist On The Conduct Of The Interim Inspections As Described Herein Contractor Shall Provide Adequate Facilities Inspection Equipment And Skilled Personnel To Support The Navair Inspector In The Conduct Of The Interim Inspections The Contractor Shall Provide Gauges Tools Fixtures And Jigs Necessary To Perform The Inspections The Contractor Shall Also Provide Suffient Rigging Material Handling Services And Manpower To Setup Configure Operate Equipment Amp Machines Used To Accomplish The Inspection Task This Contractor Assist Requirement Shall Be Applicable To 100 Of The Production And As A Minimum Including Inspection Of All 100 Imterim Inspection Requirements Identified Above 4 8 The Tests To Be Performed Under The First Article Approval Clause Far 52 209 4 Of The Contract Are Listed Below 4 8 1 Dimensional Test Special 100 Dimensional Inspection 4 8 2 Requirements Of Lke Drawing Package 4 8 3 Form Applies 4 8 4 Fit Applies 4 8 5 Function Applies Hydrostatic Test 4 8 6 Compliance With Drawing 80020 610150 Revision An And Specifications Referenced Therein 4 9 In Addition To The Above Tests The First Article S To Be Delivered Hereunder Shall Also Be Subjected To Those Tests Which Will Demonstrate That The Article S Comply With Contract Requirements Requirements 4 10 The Contractor Shall Be Responsible For Providing The Necessary Parts And Repair Of The First Article Sample S During Testing 4 11 The Cost Of The Government Testing Effort Set Forth In This Solicitation Is Estimated To Be 5000Per Part For The First Article Testing This Cost Factor Will Be Added For Solicitation Purposes To The Price Of All Offerors For Whom The Government Will Require Such Testing 4 12 Disposition Of Fat Samples 4 12 1 Sample S Shall Not Be Returned To The Contractor Because They Shall Be Destroyed During Testing 4 12 2 Applies Unless Otherwise Provided For In The Contract Sample S Shall Be Returned To The Contractor And May Be Considered As Production Items Under The Contract Provided The Sample S Can Be Refurbished To Ready For Issue Condition And Provided The Sample S Have Inspection Approval From The Cognizant Dcmc Qar Sample S May Be Shipped As Production Items Only After All Other Units Required Under The Contract Have Been Produced And Are Ready For Shipment Sample S Shall Be Returned To The Contractor But Shall Not Be Considered As Production Due 4 13 Test Sample Coating Instructions 4 13 1 Samples Are To Be Unpainted Corrosive Areas Are To Be Coated With A Light Preservative This Paragraph Does Not Apply To Shipping Containers 4 14 Fat Approval Criteria 4 14 1 Far 52 209 4 Applies A The Contractors Shall Deliver One Unit S Of The Following Cage 80020 Part Number 610150 9 Revision An Within 240 Calendar Days From The Date Of This Contract To The Government At Naval Air Warfare Center Aircraft Division Code Bl41600 B148 2 Hwy 547 Lakehurst Nj 08733 5125 Attention Paul Campos Marking Of Test Sample S Shipping Container Shall Be As Follows Citing This Contract Number For First Article Testing Not Rfi Material Do Not Take Up In Stock Contract Number For First Article Test The Shipping Documentation Shall Contain This Contract Number And Lot Item Identification The Characteristics That The First Article Must Meet And The Testing Requirements Are Specified Elsewhere In This Contract B Upon Shipment Of First Article Sample S Two 2 Copies Of The Material Inspection And Receiving Report Dd Form 250 Bearing The Qar s Signature And Indication Of Preliminary Inspection Shall Be Forwarded To The Navicp Philadelphia Code Cited In Block 10 A Of Sf33 With Duplicate Copies To Navicp Code 072 And To The Designated Test Facility The Envelopes Shall Be Clearly Marked Do Not Open In Mail Room Within 60 Days After Receipt Of The Samples The Test Site Shall Complete Testing Evaluation And Submit Two 2 Copies Of Their Test Report With Conclusions And Recommendations To The Navicp Code Cited In Block 10 A Of The Sf33 C Within 70 Calendar Days After The Government Receives The First Article The Contracting Officer Shall Notify The Contractor In Writing Of The Approval Conditional Approval Or Disapproval Of The First Article The Notice Of Approval Conditional Approval Or Disapproval Shall Not Relieve The Contractor From Complying With All Requirements Of The Specifications And All Other Terms And Conditions Of This Contract A Notice Of Conditional Approval Shall State Any Further Action Required Of The Contractor A Notice Of Disapproval Shall Cite Reasons For Disapproval D If The First Article Is Disapproved The Contractor Upon Government Request Shall Submit An Additional First Article For Testing After Each Request The Contractor Shall Make Any Necessary Changes Modifications Or Repairs To The First Article Or Select Another First Article For Testing All Costs Related To These Tests Are To Be Borne By The Contractor Including Any And All Costs For Additional Tests Following A Disapproval The Contractor Shall Furnish Any Additional First Article To The Government Under The Terms And Conditions And Within The Time Specified By The Government The Government Shall Act On This First Article Within The Time Limit Specified In Paragraph B Above The Government Reserves The Right To Require An Equitable Adjustment Of The Contract Price For Any Extension Of The Delivery Schedule Or For Any Additional Costs To The Government Related To These Tests E If The Contractor Fails To Deliver Any First Article On Time Or The Contracting Officer Disapproves Any First Article The Contractor Shall Be Deemed To Have Failed To Make Delivery Within The Meaning Of The Default Clause Of This Contract F Unless Otherwise Provided In The Contract The Contractor 1 May Deliver The Approved First Article As Part Of The Contract Quantity Provided It Meets All Contract Requirements For Acceptance And Was Not Consumed Or Destroyed In Testing And 2 Shall Remove And Dispose Of Any First Article From The Government Test Facility At The Contractors Expense G If The Government Does Not Act Within The Time Specified In Paragraph B Or C Above The Contracting Officer Shall Upon Timely Written Request From The Contractor Equitably Adjust Under The Changes Clause Of This Contract The Delivery Or Performance Dates And Or The Contract Price And Any Other Contractual Term Affected By The Delay H The Contractor Is Responsible For Providing Operating And Maintenance Instructions Spare Parts Support And Repair Of The First Article During Any First Article Test I Before First Article Approval The Acquisition Of Materials Or Components For Or The Commencement Of Production Of The Balance Of The Contract Quantity Is At The Sole Risk Of The Contractor Before First Article Approval The Costs Thereof Shall Not Be Allocable To This Contract For 1 Progress Payments Or 2 Termination Settlements If The Contract Is Terminated For The Convenience Of The Government J The Contractor Shall Produce Both The First Article And The Production Quantity At The Same Facility And Shall Submit A Certification To This Effect With Each First Article K The Contractor Shall Provide Specific Written Notification To The Procuring Contracting Officer Informing Him Her Of The Shipment Of Any Article S Furnished In Accordance With This Clause Such Notification Must Be Addressed To The Attention Of The Navicp Code Specified In Block 10 A Of The Sf33 With Copies To Navicp Code 072 And To The Testing Activity Failure To Provide Such Notification Shall Excuse The Government From Any Delay In Performing First Article Testing And Informing The Contractor Of The Results Thereof L Fourteen 14 Days Prior To Shipment Of First Article Samples The Contractor Shall Notify The Designated Test Facility In Writing Of The Anticipated Shipping Date With An Information Copy To The Pco Navicp Philadelphia Attn Cite Code Found In Block 10 A Of The Sf33 The Contractor Shall Also Arrange For Preliminary Inspection Of Test Samples By The Dcmc Qar 4 15 Alternate Offers Waiver Of First Article Approval Requirements The Following Provisions Supersede Any Waiver Of First Article Approval Requirements Terms Set Forth In Clause 52 209 3 Or 52 209 4 As Appropriate A Unless Otherwise Specified In The Solicitation The Naval Inventory Control Point Reserves The Right To Waive The First Article Approval Requirements Specified Herein For Offerors Who Have Previously Furnished Identical Production Articles Accepted By The Government Or The Original Equipment Manufacturer Prime Manufacturer An Offeror Requesting Waiver Of First Article Requirements Shall Submit Evidence With Its Offer Establishing That I The Last Production Unit Was Delivered Within Three 3 Years Of The Issue Date Of This Solicitation And Ii The Production Location To Be Used For This Requirement Is The Same As Used For The Previous Production Run Additionally The Offeror Shall Submit A Certification To Be Executed By The Officer Or Employee For The Offer Stating That I The Articles To Be Provided Will Be Produced Using The Same Facilities Processes Sequences Of Operations And Approved Subcontractors As Those Previously Delivered And Accepted By The Government Or The Original Equipment Manufacturer Prime Manufacturer And Ii The Previous Production Units Were Manufactured Without Material Review Board Disposition Or Waiver Deviation Request Or Rejection Of Pre Production Samples For Cause Note This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States And The Making Of A False Fictitious Or Fraudulent Certification May Render The Maker Subject To Prosecution Under Title 18 United States Code Section 1001 B Offerors Requesting Waiver Of First Article Approval Requirements Under The Provisions Of This Clause Are Cautioned To Submit Two Prices For Articles Required Herein One That Is Based On Compliance With The First Article Approval Requirements And One That Is Based On A Waiver Of Such Requirements Where An Offeror Submits Only One Price And Fails To Clearly State That The Price Is Based On Waiver Of The First Article Approval Requirements It Will Be Deemed To Be Based On Compliance With The First Article Approval Requirements C In The Event Of The First Article Approval Requirement Is Granted The Delivery Schedule For The Production Items Shall Be Reduced By The Number Of Days Designated For Delivery Of First Article Test Unit Plus The Number Of Calendar Days Indicated For The Government Notification Of Conditional Approval Or Approval These Requirements Are Specified In The Quality Assurance Section Of This Solicitation If The Offeror Is Unable To Meet The Desired Schedule He Shall Insert Below The Alternate Delivery Schedule He Offers To The Government Offeror s Proposed Alternate Delivery Schedule Based On Waiver Of First Article Approval Requirements Within Days Item No Quantity After Date Of Contract 5 Packaging Mil Std 2073 Packaging Applies As Found Elsewhere In The Schedule 6 Notes Not Applicable This Is An Alre Critical Safety Item For Drawing Updates See Attached Nawc Lke Drawing Update Sheet Navsup Reference Only 20 10072 Procurement Tdr Be Advised That This Tdr Is The Most Current Technical Requirements Provided By Navair Lakehurst The Drawing Update Is A Part Of This Referenced Tdr And Is A Part Of This Procurment Order And Shall Be Adhered To Any Questions Or Concerns In Regards This Shall Be Submitted To Navsup Alre Technical Via The Pco The Components Being Acquired Under This Solicitation Have Been Classified As Critical Requiring Engineering Source Approval By Naval Air Systems Command Only Those Companies Who Have Subm Amp Been Approved Will Be Eligible For Award Under This Solicitation Any Company Submit A Source Approval Request As Outlined In This Solicitation Date Of First Submission 240 Dac All Certifications Test Reports And In Process Inspection Documents Needed To Substantiate Product Quality Shall Be Available When Shipped To Nawc Lakehurst For Fat Inspection A Copies Of All Approved Requests For Variations B Material And Mill Certifications Per Drawings 316294 A318426 17 32286 424842 17 32284 316294 509441 509544 517814 517815 17 61755 17 32283 523479 17 42052 C Dimensional Inspection Per Drawing 316293 316294 A318426 17 32286 424842 17 32284 316294 509441 509544 517814 517815 17 61755 17 32283 523479 17 42052 D Welding Iaw Navsea S9074 Ar Gib 010 278 Per Drawings 509544 17 61755 E Radiographic Inspection Per Drawing 523479 F Nitride Hardening Per Note 4 Of Drawing 17 32283 G Design Ultimate Tensile Strength Uts Shall Be 120 000 Psi Per Drawing 17 32283 H Heat Treat Per Drawing 316294 17 32286 17 32284 316294 509441 509544 I Hardness Test Per Drawing 316294 17 32286 17 32284 316294 509441 509544 523479J Finish Per Drawing A318426 517815 17 61755 K 100 Magnetic Particle Inspection Per Drawing A318426 17 32286 17 32284 509441 509544 17 61755 17 32283 L Penetrant Inspection Per Drawing 17 61755 17 42052 M Hydrostatic Testing Per Drawing 316293 17 61755 N Identification Per Drawing 316293 A318426 316294 17 32286 316294 509544 517814 517815 17 61755 17 32283 17 32283 523479 17 42052 O 100 Inspect And Record The Readings For The Pitch And Functional Diameters And Document That The Inspection Results Are Acceptable And Are Iaw System 22 Of Fed Std H28 20 Per Drawing 424842 517843 517816 17 32284 517814 517815 17 61755 17 32283 17 42052 P Cadmium Plating Per Drawing 318426 First Article Testing P N 610150 9 Amp 514364 1 A First Article Testing By The Government Is Required For This Item Of Alre Se B First Article Samples All Certifications Test Reports And In Process Inspproduct Quality Shall Be Forwarded To The Naval Air Warfare Center Aircraft Div 547 Lakehurst Nj 08733 5125 Attention Paul Campos C First Article Samples Will Be Evaluated Within 45 Working Days After The Date Of Receipt For Sample Quantities First Article Sample Quantities Is 1 One Delivered In The Uncoated Condit Ion First Article Results And Disposition Recommendations Will Be Provided To The Pco Via Letter E Estimated Test Costs Are 5000 Per Part F First Article Testing Will Be Iaw Naec 91 7616 Per Note 6 Of Drawing 610150 Date Of First Submission Asreq Production Lot Test Report The Following Certifications Shall Be Submitted With The 100 Production Lot Inspection Units When Shipped To Lakehurst For Required Testing Data Requirements A Copies Of All Approved Requests For Variations B Material And Mill Certifications Per Drawings 316294 A318426 17 32286 424842 17 32284 316294 509441 509544 517814 517815 17 61755 17 32283 523479 17 42052 C Dimensional Inspection Per Drawing 316293 316294 A318426 17 32286 424842 17 32284 316294 509441 509544 517814 517815 17 61755 17 32283 523479 17 42052 D Welding Iaw Navsea S9074 Ar Gib 010 278 Per Drawings 509544 17 61755 E Radiographic Inspection Per Drawing 523479 F Nitride Hardening Per Note 4 Of Drawing 17 32283 G Design Ultimate Tensile Strength Uts Shall Be 120 000 Psi Per Drawing 17 H Heat Treat Per Drawing 316294 17 32286 17 32284 316294 509441 509544 I Hardness Test Per Drawing 316294 17 32286 17 32284 316294 509441 509544 523479 J Finish Per Drawing A318426 517815 17 61755 K 100 Magnetic Particle Inspection Per Drawing A318426 17 32286 17 32284 509441 509544 17 61755 17 32283 L Penetrant Inspection Per Drawing 17 61755 17 42052 M Hydrostatic Testing Per Drawing 316293 17 61755 O 100 Inspect And Record The Readings For The Pitch And Functional Diameters And Document That The Inspection Results Are Acceptable And Are Iaw System22 Of Fed Std H28 20 Per Drawing 424842 517843 517816 17 32284 P Cadmium Plating Per Drawing 318426 Production Lot Special Tests Government Testing P N 610150 9 Amp 514364 1 A Production Lot Testing By Nawcadlke As Specified In Naec Eng 6518 Is Require 100 Of The Csv Valve Assemblies And Spindles B Production Lot Samples All Certifications Test Reports And In Process Inspection Documents Needed To Substantiate Proroduct Quality Shall Be Forwarded To The Naval Air Warfare Center Aircraft Div 547 Lakehurst Nj 08733 5125 Attention Paul Campos C Test Units Shall Be Submitted As Follows I Prior To Valve Assembly Spindles P N 514364 1 Shall Be Submitted For Preliminary Testing And Serialization By Nawcadlke Ii Upon Successful Completion Of Spindle Testing And Return To Contractor The Completed Csv Valve Assemblies P N 610150 9 Shall Be Submitted To Nawcadlke For Final Testing And Serialization Iaw Naec 91 7616 Per Note 6 Of Drawing 610150 D Lot Samples Will Be Evaluated Within 45 Working Days After The Date Of Receipt E Lot Sample Quantities Is 5 Five Selected Randomly From The First Production Lot Shall Be No Greater Than 100 Piece Quantities Production Lots Shall Be Approved By Nawcadlke Code Bl41600 Lot Disposition Recommendations Will Be Provided To The Pco Via Letter F Estimated Test Costs Are 5000 Per Part Date Of First Submission Asreq Receipt Inspection All Certifications Test Reports And In Process Inspection Documents Needed To Substantiate Product Quality Shall Be Available When Shipped To Nawc Lakehurst For Receipt Inspection Data Requirements A Copies Of All Approved Requests For Variations B Material And Mill Certifications Per Drawings 316294 A318426 17 32286 424842 17 32284 316294 509441 509544 517814 517815 17 61755 17 32283 523479 17 42052 C Dimensional Inspection Per Drawing 316293 316294 A318426 17 32286 424842 17 32284 316294 509441 509544 517814 517815 17 61755 17 32283 523479 17 42052 D Welding Iaw Navsea S9074 Ar Gib 010 278 Per Drawings 509544 17 61755 E Radiographic Inspection Per Drawing 523479 G Design Ultimate Tensile Strength Uts Shall Be 120 000 Psi Per Drawing 17 32283 H Heat Treat Per Drawing 316294 17 32286 17 32284 316294 509441 509544 I Hardness Test Per Drawing 316294 17 32286 17 32284 316294 509441 509544 523479 J Finish Per Drawing A318426 517815 17 61755K 100 Magnetic Particle Inspection Per Drawing A318426 17 32286 17 32284 509441 509544 17 61755 17 32283 L Penetrant Inspection Per Drawing 17 61755 17 42052 M Hydrostatic Testing Per Drawing 316293 17 61755 N Identification Per Drawing 316293 A318426 316294 17 32286 316294 509544 517814 517815 17 61755 17 32283 17 32283 523479 17 42052 O 100 Inspect And Record The Readings For The Pitch And Functional Diametersand Document That The Inspection Results Are Acceptable And Are Iaw System22 Of Fed Std H28 20 Per Drawing 424842 517843 517816 17 32284 517814 517815 17 61755 17 32283 17 42052 P Cadmium Plating Per Drawing 318426 Receipt Inspection And Certification Of Sub Components A P N 17 42052 1 Stem Shall Be Certified At The Time Of Interim Inspection Pby Nawcadlke Prior To Assembly Contractor Assist And Marking As Specified Below Applies B P N 514364 Spindle Shall Be Receipt Inspected And Certified At Lakehurst Concurrently With Production Lot Testing Receipt Certification Inspection A P N 610150 9 Shall Be Receipt Inspected And Certified At Lakehurst Date Of First Submission Asreq Block 6 Forward Additonal Copy To Aso Code Cited In Block 10 A On Page 1 Welding Procedures Data Requirements A Weld Procedure Iaw Navsea S9074 Ar Gib 010 278 Para 4 Drawings509544 17 61755 Date Of Subsequent Submmision Approval Or Reason For Disapproval Shall Be Given By Navairwarcenacdivlke Via The P C O Nlt 45 Days After Disapproval Addresses For Navair Codes Navairwarcenacdivlke Code Bl14000 Bldg 596 Hwy 547 Joint Base Mdl Nj 08733 5000 Navairwarcenacdivlke Code 4 3 4 Bldg 562 Hwy 547 Joint Base Mdl Nj 08733 5000 Navairwarcenacdivlke Code Bl41600 Bldg 148 Hwy 547 Joint Base Mdl Nj 08733 5000 Welding Procedure Qualification Report Data Requirements A The Weld Procedure Qualification Test Report Including All Supporting Test Reports And Documentation Iaw Navsea S9074 Aq Gib 010 248 Para 4 2 3 And 4 6 Drawings 509544 17 61755 Date Of Subsequent Submmision Approval Or Reason For Disapproval Shall Be Given By Navairwarcenacdivlke Via The P C O Nlt 45 Days After Disapproval Addresses For Navair Codes Navairwarcenacdivlke Code Bl14000 Bldg 596 Hwy 547 Joint Base Mdl Nj 08733 5000 Navairwarcenacdivlke Code 4 3 4 Bldg 562 Hwy 547Joint Base Mdl Nj 08733 5000 Navairwarcenacdivlke Code Bl41600 Bldg 148 Hwy 547Joint Base Mdl Nj 08733 5000 Date Of First Submission Asreq Block 6 Forward Additonal Copy To Aso Code Cited In Block 10 A On Page 1 Contract Reference A Radiographic Inspection Of Castings Iaw T9074 As Gib 010 271 Per Drawing 523479 Addresses For Navair Codes Navairwarcenacdivlke Code Bl41600 Bldg 148 Hwy 547 Joint Base Mdl Nj 08733 5000
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 37499409
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.