View Changes This Is A Combined Synopsis Solicitation For Commercial Items Prepared In Accordance With The Format In Far Subpart 12 6 As Supplemented With Additional Information Included In This Notice This Announcement Constitutes The Only Solicitation Quotations Are Being Requested And A Written Solicitation Will Not Be Issued This Request For Quotations Incorporates Provisions And Clauses In Effect Through Federal Acquisition Circular 2005 84 Dated Nov 1 2015 All Responsible Sources May Submit Proposals That Will Be Considered By The Agency The Contract Will Be Awarded On A Firm Fixed Price Basis Using Simplified Acquisition Procedures In Accordance With Far Part 13 5 Past Performance Will Be Considered In The Selection Of The Awarded Vendor Primary Pop 08Feb2021 22Feb2021 Secondary Pop 15Feb2021 01Mar2021 Tcto Tb2010 50600 Rtk 0820 418 Work Item 1 Tank Sounding Tube Replace 1 Scope 1 1 Intent This Work Item Describes The Requirements For The Contractor To Replace Existing Carbon Steel Sounding Tubes In Tanks Listed In Table 1 With 90 10 Copper Nickel Piping And Fittings Table 1 List Of Tanks Type Of Structure Tank Number Tli Number Tli Location Approximate Length Of Sounding Tube Feet Oily Waste Holding 5 41 1 F Ow Lt 001 2 44 1 5 Aft Oily Waste 5 59 1 F Ow Lt 004 2 63 1 5 1 2 Government Furnished Property None 2 References Coast Guard Drawings Coast Guard Drawing 418A Wmsl 506 001 Rev Overflow Air Escapes Sounding Tubes Diagram Coast Guard Drawing 750 Wmsl 485 001 Rev L Sleeves Pipe Structure Penetration Sp485000 Coast Guard Drawing 750 Wmsl 506 015 Rev C Overfl Airescapes Sounding Tubes Unit 2100 Asc506210 Ae Coast Guard Drawing 750 Wmsl 506 016 Rev E Ovrflw Airescapes Sounding Tubes Unit 2110 Asc506211 Ae Coast Guard Drawing 750 Wmsl 506 020 Rev D Overfl Air Escapes Sounding Tubes Unit 2200 Asc506220 Ae Coast Guard Drawing 750 Wmsl 506 021 Rev C Ovfl Air Escapes Sounding Tubes Unit 2210 Asc506221 Ae Coast Guard Drawing 750 Wmsl 506 022 Rev B Ovrflw Airescapes Sounding Tubes Unit 2220 Asc506222 Ae Coast Guard Drawing 750 Wmsl 506 023 Rev C Overflow Air Escapes Sounding Tubes Unit 2230 Asc506223 Ae Coast Guard Drawing 750 Wmsl 506 025 Rev C Ovfl Air Escapes Sounding Tubes Unit 2300 Asc506230 Ae Coast Guard Drawing 750 Wmsl 506 026 Rev C Ovrflw Airescapes Sounding Tubes Unit 2330 Asc506233 Ae Coast Guard Drawing 750 Wmsl 506 039 Rev D Overflows Air Escapes Sounding Tubes Unit 2310 Asc506231 Ae Coast Guard Drawing 750 Wmsl 506 040 Rev B Overflw Airescapes Sounding Tubes Unit 2320 Asc506232 Ae Coast Guard Drawing 750 Wmsl 506 512 Rev Ferrous Sounding Tube Replacement A Amp D Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 Sflc Std Spec 0000 2018 General Requirements Surface Forces Logistics Center Standard Specification 0740 Sflc Std Spec 0740 2018 Welding And Allied Processes Surface Forces Logistics Center Standard Specification 3042 Sflc Std Spec 3042 2018 Shipboard Electrical Cable Removal Relocation Splice Repair And Installation Surface Forces Logistics Center Standard Specification 6310 Sflc Std Spec 6310 2018 Requirements For Preservation Of Ship Structures Surface Forces Logistics Center Standard Specification 6341 Sflc Std Spec 6341 2018 Install Interior Deck Covering Systems Other References Manufacturers Standardization Society Of The Valve And Fittings Industry Ansi Mss Sp 58 2018 Pipe Hangers And Supports Materials Design Manufacture Selection Application And Installation 3 Requirements 3 1 General 3 1 1 Cir The Contractor Shall Submit A Cir For The Inspections Listed In The Following Paragraph S None 3 1 2 Tech Rep The Contractor Shall Provide The Services Of An Oem Authorized Licensed Tech Rep For The Ohmart Vega Tank Level Indicator Vegapuls 66 To Accomplish The Following On Site Provide Manufacturer s Proprietary System Equipment Information Software And Tools Assist With And Ensure Compliance With Manufacturer s Procedures And Standards During Disassembly Inspection Repair Modification Calibration And Reassembly Of The Equipment System 3 1 2 1 Ensure The Tech Rep Is An Oem Certified Representative For The System Equipment Stated Above And Demonstrated On Their R sum 3 1 3 Protective Measures The Contractor Shall Furnish And Install All Protective Coverings To Seal Off And Protect All Non Affected Vessel s Components Equipment And Spaces Near The Work Area Against Contamination During The Performance Of Work Upon Completion Of Work The Contractor Shall Remove All Installed Protective Measures Inspect For The Presence Of Contamination And Return All Contaminated Equipment Components And Spaces To Original Condition Of Cleanliness 3 1 4 Interferences The Contractor Shall Handle All Interferences In Accordance With Sflc Std Spec 0000 Paragraph 3 3 5 Interferences Known Interferences Include But Are Not Limited To The Following Insulation Electrical Wiring Piping Systems Deck Covering 3 1 5 Electrical Requirements The Contractor Shall Accomplish All Electrical Work In Accordance With Sflc Std Spec 3042 3 2 Functional Test Of Tlis Initial Prior To Commencement Of Work The Contractor Shall Witness Coast Guard Personnel Perform An Operational Test Of Each Tank Tlis To Demonstrate That Each Radar Head Sensor Is Functional I E Digital Readout Is Displayed Ensure That There Is Interface Communication Between The Tli Sensor And The Machinery Control And Monitoring System I E Digital Readout At The Tli Is Identical To That Displayed Submit A Cfr Note Functional Test Of The Tli Radar Heads Should Be Done Before The Tanks Are Emptied 3 3 Tank Sounding Tube Replacement The Contractor Shall Replace The Entire Length Of The Sounding Tubes Below The Tli Assembly Coupling In Accordance With Coast Guard Drawing 750 Wmsl 506 512 Use The Referenced Coast Guard Drawings To Identify The Steel Sounding Tube And Associated Fittings For Removal Use The Existing Piping Configuration As Templates For The Replacement Piping 3 3 1 Removal For Each Tank Sounding Tube The Contractor Shall Disconnect The Radar Sensor Electrically And Mechanically Tag Each Sensor Assembly With Corresponding Tank Number Or Location Compartment Number And Protect The Sensors From Damage While In Storage As These Will Be Reinstalled On The New Sounding Tubes Once The Sensor Assembly Has Been Disconnected At The Coupling Remove All Remaining Sounding Tube Material In Affected Tanks Discard Removed Components In Accordance With All Federal State And Local Rules And Regulations 3 3 2 Installation The Contractor Shall Prepare And Install New Sounding Tubes New And Reused Material Shall Be In Accordance With Coast Guard Drawing 750 Wmsl 506 512 Use The Old Steel Piping As Templates Ensure The Internal And External Surfaces Of The New Pipes And Fittings Are Clean And Free Of Foreign Debris Before Installing Perform Welding And Brazing In Accordance With Sflc Std Spec 0740 3 3 3 Nde The Contractor Shall Perform A Visual Inspection Vt And A Dye Penetrant Pt Inspection Of All Piping And Deck Penetration Welds In Accordance With Sflc Std Spec 0740 Submit A Cfr 3 3 4 Nuts On Flanged Joints In All Tanks Shall Be Self Locking With At Least One Thread Length Extending Beyond The Insert When The Nut Is Drawn Up Tight The Self Locking Nut Shall Be Rated For The Temperature Of The Service 3 3 5 Where Disconnected Reinstall Pipe Supports In Accordance With Mss Sp 58 3 4 Boundary Test Compartment Air In The Presence Of The Coast Guard Inspector The Contractor Shall Air Test The Affected Tanks Listed In Table 1 In Accordance With Sflc Std Spec 0740 Appendix C Submit A Cfr 3 5 Calibration And Operational Test Post Repair After Completion Of Work The Contractor Shall Re Install And Calibrate The Tli Sensors Using The Cutter S Sounding Device In The Presence Of The Cg Inspector And The Tech Rep Take The Liquid Level Readings Using The Radar Tli And Manually Using The Sounding Gaging Tape At 0 25 50 75 And 95 Of Tank Capacities The Level And Or Volume Indication From The Tli Shall Be Within 3 Accuracy From The Manual Sounding Indication At All Locations Submit A Cfr 3 6 New Sounding Tube Surface Preservation The Contractor Shall Prepare And Coat The External Surfaces Of The New Sounding Tube Inside And Outside Of The Tanks Using The System Specified For Piping Interior Piping Insulated And Uninsulated Under 200 f Appendix B Cutter And Boat Interior Painting Systems In Sflc Std Spec 6310 3 7 Restoration And Touch Up Preservation The Contractor Shall Prepare And Coat All New And Disturbed Surfaces To Match Existing Adjacent Surfaces In Accordance With Sflc Std Spec 6310 Paragraph 3 1 13 Touch Ups And Minor Coating Repairs 3 7 1 Any Section Of The Polymeric Deck Covering That Has To Be Removed Shall Be Replaced Using The Same Material To Match The Adjacent Color And Flakes Prepare Affected Deck Surfaces And Install Polymeric Deck Covering System In Accordance With Sflc Std Spec 6341 4 Notes This Section Is Not Applicable To This Work Item Interested Vendors Please Send Official Quote With A Sam Gov Registered Duns Number And Email To Anthony J Andaluz Uscg Mil Cost Breakdown Of Quote Including But Not Limited To Labor Cost Per Hour And Materials Is Required
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 36612966
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.