Quotation Are Invited For Job1032003454 Fab And Replacement G Mst Fabrication And Replacement Of Ph 1 Fwp BaseFor Technical Clarification Please Contact Ezaz 0503493353 0555090835 Email Md E Dewa Gov Ae Mr A Razzak 0555567949 Mr Najeeb 0502838591G Station Feed Water Pump Base FrameFabrication And Replacement WorkIncluding Material G Station Feed WaterPump Base Frame NeedTo Fabricate And Replace With TheFollowing Specification And Job Scope Scope Of Work 1 Mobilizing AndDemobilizing Of Work Force Equipment Tools Consumables Etc 2 Measurement To Be Taken Prior To TheWork 3 Tools And Equipment NecessaryHand Tools AndEquipment Etc 4 Material All MaterialRequired To Complete The Work 5 Prefabrication Of Base Frame As PerDrawing And Sample SiTe Measurement 6 Base Frame Will BeFabricated With I Beam Same Size As ExistingChannel 7 Decoupling The Motor And Pump8 RemoVing The Pump Including Suction DischargeFlange Opening And Cooling Pipelines 9 Removed Items Keeping In Arranged And Safe ConditiOn 10 Removing The Old Base FrameIncluding Concrete Work 11 InstallationOf The Pre Fabricated New Base Frame WithThe Initial SIte Measurement 12 Aligning The BaseFrame Fixing It Including Concrete Work Core Cutting Casting Etc 13 ExistingCooling InLet And Outlet Pipeline Cannot Be Modified 14 Fix Back The Pump 15 Alignment Of ThePump And Motor With The Flexibility OfMotorMovement In Future 16 All Auxiliary PipelineFix Back And Final Alignment Check 17 InletAnd Outlet Pipeline Should Be Fixed Back Like Initial Condition Without Any ExtraStress 18 Contractor Should Protect ThePlant And Surrounding Area During Work 19 SubmiSsion Of As Build Dimensional Drawing OfThe Base 20 Submission Of Complete MethodStatements With The Offer 21 Submission Of RisK Assessments Before Starting The Jobs AtSite 22 Replacement Work Will Be CarriedOut On Site At Jebel Ali Power Station GStation 23 Work Will Be Carried Out As Per DewaSchedule Time Will May Be Different ForEach Unit Of Work 24 One Unit OfMeasurement WilL Be Considered As One Frame ReplacementIn All Respect Complete Vendor S GeneralResponsibility And Liabilities 1 ContractorShaLl Provide Supervisory Skilled Semi Skilled Unskilled Work Force 2 OneSupervisor Should Be At Site During TheWork 3 All ReqUired Tools Equipment Consumables Etc Required To Complete The Job 4 Contractor Shall Provide All PersonalProtective Equipment First Aid Kit Available Covid 19Precautionary Kit At Site During TheStandard Terms Conditions1 Prices Should Be Ddp Delivery Duty Paid At Dewa Stores 2 Quotation To Be Submitted Only In Local Currency U A E Dirhams3 Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material4 No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company And Your Participation In Dewa Tenders Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 34997216
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.