Tenders Are Invited For Provision Of Christmas Tree And Installation Service For U1 18 U1 20 And U1 22 Wells Technical Requirements 1 While Designing Christmas Tree Applicants Must Consider Information Below Gas 2 500 000 M3 Day Condensate 465 M3 Day Reservoir Pressure 900 Atm Co2 30 Psi H2s 0 5 Psi2 Applicants Must Demonstrate The Technical Specifications And Information Relevant To Each Equipment Minimum Internal Diameter Drift Diameter Working Pressure Working Temperature Metallurgy3 Applicants Must Take Into Account All The Taxes And Mandatory Payments As Well As Transportation Insurance And Other Expenses To Be Covered By The Legislation Of The Republic Of Azerbaijan In TheirTender Proposals 4 Main Equipment Is Mentioned In The Table Above Applicants Must Include In Proposal All Other ToolsAnd Equipment Not Mentioned In The Table 5 Installation And Supervising Services For Christmas Tree Set Must Be Done By The Contractor Company 6 Contractor Company Must Include Testing And Installation Costs In The Proposal Separately 7 Certificates And Passports Of Equipment That Is Demonstrated In Tender Proposal List Which Is ProvidedBy Contractor Company Need To Be Added 8 Awarded Service Company Must Deliver The Amount Of Equipment Until The September Of 2020 To TheClient If The Proposals Made By Applicants Will Be Dated Later Than September 2020 Proposal Will StillBe Valid And Evaluated Accordingly 9 If Additional Equipment Needed Client Company Can Purchase Under This Contract 10 The Representatives Of Service Company Will Be Paid By Operator Company For Only During ActualWorking Days 11 Operator Company Keeps The Rights Alter The Amount Of Equipment Or Not To Purchase Some EquipmentWhich Was Intended For 3Rd Well 12 The Technical Parameter Of Purchased Goods Must Comply With The Parameters Given In The Table Above 13 The Specification Of Required Equipment Must Adhere To The Ecology And Technical Safety Standards 14 The Purchased Equipment Must Have Warranty Until Installation To The Well If Some Problems ObservedAfter Installing This Equipment In That Case If Required 3Rd Party Other Company Will Be Invited ToInvestigate 15 The Manufacture Date Of Purchased Goods Must Not Be Before 01 09 2019 And The Storage Condition OfThem Needs To Meet Requirements Of The Standards Given Above In Case Of Breach Of The RequirementsSpecified In This Clause The Operator Company Keeps The Right Not To Accept The Goods Under The Contract In This Case The Contractor Must Refund All Financial Loss Of Product Equipment To The Client Operator Company 16 Applicant Shall Provide Necessary Conditions For Gas Testing Of Christmas Tree In Azerbaijan And IfRequired By Operator Company Gas Testing Should Be Done The Expense Of Gas Testing Should BeIncluded In Commercial Proposal Separately Note Operator Company Will Be Charged For Gas Testing Only If The Gas Testing Of Christmas Tree Will BePerformed 17 2 Delegates Who Are Appointed By Purchaser Company Must Inspect All Equipment During Gas HydraulicAnd Etc Testing For Being Sure About Technical Parameters Are Fitted With The Parameter That Shown InContract Before Loading Them To The Vehicle And Inspection Results Need To Be Confirmed Officially The Expenses Of Inspection Need To Be Payed By Contragent And These Expenses Must Be Taken IntoAccount In Financial Proposal 18 The Technical Specifications Of The Proposed Products Drawing Dimension User Manual OperatingCosts And Other Information Must Be Added To The Proposal Envelope In Both Azerbaijani And English 19 At The Process Of Signing A Procurement Contract With The Winner Contractor The Following DocumentsWill Be Included In The Contract For Either The Submission Of The Documents Together With The EquipmentOr After Delivery Of The Equipment Certificate Of Origin Original Certificate Of Quality Test Certificate Original Manufacturers License Certificate Of Conformity Or Standard Certificate Copy Technical Passport Of Equipment And Operation Guide Original Document Transport Receipt About Shipment Of Goods Original Insurance Document Of Goods When Cif Is Applicable Original 20 Client Operator Company Is Not Liable For Any Costs That Is Not Incurred Under Customs Code AndSelected International Shipping Terms 21 Service Company Should Have Workshop In Azerbaijan If Required By Operator Company For ProvisionOf Immediate Technical Support Service Company Must Have Technical Personnel In Azerbaijan 22 After Contract Has Been Signed By Contractor When Requested Contractor Shall Provide DetailedInformation Regarding Christmas Tree User Manual Performed Testing Manuals And Certificates In TheFactory For Each Christmas Tree Storage Conditions Transportation Preparation For Installation Etc 23 Christmas Tree Should Be Tested Following Tests Which Were Mentioned Below And Testing ManualsShould Be Shared With Customer Company Gas And Hydraulic Testing At The Base Of Manufacturer Hydraulic And Functional Testing On The Base In Azerbaijan Note All Test Expenses Of Equipment Must Be Included In Proposal 24 The Maintenance Service Of Christmas Tree Should Be Provided By Service Company And Expences OfMaintenance Service Should Be Noted Separately In The Proposal 25 If The Maintenance Of Valves Of Christmas Tree Is Possible By Replacing The Rods Of Lubricator ThenDifferent Sizes Of Rods Will Be Purchased If There Will Be Needed To Change Lubricator In This CaseLubricator Will Be Purchased Only For Bpv Two Way Check Valve 26 After Signing Contract Between Contractor And Operator Company Installation Procedure Of EquipmentMust Be Provided At Least 1 Months Before Completion Operation 27 It Is Considered Purchasing Equipment For 3 Wells U1 18 U1 20 U1 22 From Service Company Initially Equipment For 2 Wells U1 18 U1 20 Will Be Purchased By Operator Company AfterwardsEquipment Intended For One Well U1 22 Is Planned To Be Purchased By Operator Company ByInforming Service Company 9 Months In Advance 28 Christmas Tree Pack Should Be Stored In The Base Of Service Company And Designed Storage ConditionShould Be Provided With Inclusion Of Costs Into The Proposal Separately 29 Christmas Tree Shall Comply To The Following Or Updated Standards Api 6A And Or Iso 10423 Wellhead Christmas Tree EquipmentNote The Standards And Certificates Which Are Fitted With The Standards Which Are Not Mentioned AboveAre Applicable If Agreed And Approved By Client Operator Company
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 24566157
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.