Prior Information Notice Without Call For Competition Construction Work For Swimming PoolNew Construction Of An Indoor Pool With Sports Teaching Swimming Pool Childrens Pool And Slide Bath Water TechnologyDescription The Community Kirchlengern Intends To Create A New Swimming Pool At The Location Of The Existing Outdoor Indoor Pool The New Building Is Located On The Municipalitys Own Grounds Of The Open Air Swimming Pool In Kirchlengern And Is To Be Built As A Compact Building On The Eastern Boundary Of The Street Am Hallenbad The Best Indoor Swimming Pool Should Be Demolished Only With Fertigstyllung The New Building The Upper Level Of The Entrance Level 0 00 Is 64 50 M Above Sea Level And Thus At Street Level The New Swimming Pool Is Intended To Cover The Basic Components Of School Club Sports And Family Leisure Swimming Be A 4 X 25 M Sports Pool 1 About 250 M2 A Teaching Pool With 100 M2And A Childrens Area About 50 M2 Built The Outdoor Pool Is Only By A Techn Renovation Has Been Repaired And Remains Usable All User Relevant Functions Are On One Level The Bathing Water Technology Filter Systems Splash Tanks Pumps Metering Technology Et C Are Located In The Basement The Ventilation Systems Are Arranged Centrally In The Upper Floor All Levels Can Be Reached Via Internal Internal Development The Depot In Front Of The Locker Can Be Reached Via The Street Am Hallenbad Where The Chlorine Room And The Mounting Shaft Via Which The Delivery Of The Technical Equipment Takes Place And The Access To The Heating And Chp Can Be Assumed The Subsoil Expert Laid The Design Water Level On The Deepest Terrain The Upper Edge Of The Building Is Therefore Buoyancy Proof Receive A Wu Concrete Construction With Perimeter Insulation Load Bearing Walls Above Ground Are Implemented As Massive Reinforced Concrete Construction With 18 Cm Thermal Insulation And Plaster Or Brickwork Facing Brick At The Large Facade Openings Are Aluminum Post Bar Constructions With 3 Pane Isolierve Arranged If Necessary The Inner Walls Are Made In Reinforced Concrete Otherwise In Ks Basin And Water Tank Are Made In Wu Concrete 35 Cm And Receive A Ceramic Stoneware Surface On The Water Side Ceilings Are Made Of Reinforced Concrete Ceilings And Provided With Floating Screed And Non Slip Cat A Ceramic Covering The Roof Levels Are Executed In The Low Area As Reinforced Concrete Semi Finished Ceilings The Ceilings Of The Swimming Pools Are Manufactured In Wood Element Construction And Stored On Bsh Binders At A Distance Of Approx 5 M The Roofs Are Covered With Insulation And Epdm Foil The Pool Technology For 3 New And 2 Existing Baths Is Being Built In The Basement Coarse Weights 10 Pool Water Suction Filters 13 Raw Water And 2 Attraction Pumps 2 Purging Air And Attraction Blowers Concrete Ponds And Tanks Sp labwasserfiltrationsanlage Pe Piping Dn 15 400 Approx 3 000 Running Meters 8 Led Underwater Floodlights Various Water Attractions In The Learning Pool And Childrens Pool Chlorine Gas Supply Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 22540111
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.