Contract Notice Architectural Engineering And Planning ServicesPlanning Performance As For The Project Barrier Free Conversion Of Stadtkrone Ost Light Rail Station In The Service Diagrams Of The Planning Of Traffic Facilities Engineering Structures And Structural DesignDescription The Urban Railway Line 82 Was Expanded In The Area From The Stop Kohlgartenstra e To The Stop Stadtkrone Ost In 1992 As A Light Rail Line As Part Of The Public Transport Acceleration Program For The Use Of The B Car Since Then The Platforms In This Section Have Uniformly A Platform Height Of 38 Cm Above Sea Level So Due To The Amendment Of The Passenger Transportation Act Of 1 1 2013 There Is A Requirement That The Accessibility Of Local Public Transport In Germany Should Be As Complete As Possible By 1 1 2022 In This Context The Planning For The Production Of Accessibility At The Stadtkrone Ost Stop In The Middle Position Of The B1 And The Creation Of Barrier Free Access Via The New Bridge Should Be Created It Should Be Noted That The Redesign Of The Railway Facilities And The Construction Of The New Bridge Should Be Coordinated With Each Other In Design And Construction Execution In Addition The Realization Of The Aforementioned Infrastructural Measures Should Take Into Account The Vehicle Concept Of The Railway Operator Dsw21 Thereafter The Provisional Use Of The Stops From The Year 2024 Is Sought The Total Estimated Investment Volume Of The Construction Project Including A Planning Effort Of Around Eur 700 000 Totals Around Eur 5 800 000 As Part Of The Preliminary Planning Preferred Variants Of Stop Trainings Were Already Applied And Evaluated On This Basis A Decision Was Taken By The City Of Dortmund Council On 13 12 2018 The Project Is Therefore Based On The Following Concept The Light Rail Is Led In The Area Of The Station Stadtkrone Ost In The Stock Of The Tracks The New Stop Is To Be Arranged As A Central Platform East Of The Bridge With Elevator And Stairs This Means A New Construction Of The Stadtbahnhaltestellen Under Economic Consideration With A Platform Height Of 94 Cm Above Sea Level So With The Required Operational Equipment Taking Into Account Expert Recommendations On The Technical Feasibility Of Special Stop Solutions With Reduced Intervention In The Trees For The Access Routes This Means That The Planning Of The Demolition And Replacement Of The Access Bridge Including The Ramp And Staircase Structures Is Required It Is Aimed At The Stadtbahnhaltestellen Kohlgartenstr To Shape Stadtkrone Ost With A Unified Handwriting The Planning Is Developed By An Architectural Office And Must Be Incorporated Into The Planning In Coordination Likewise The Concerns Of Industrial Engineering Are To Be Incorporated Into The Planning The Entire Construction Project Must Be Carried Out Under Operation Public Transport And Iv This Must Be Taken Into Account Taking Into Account The Different Stages Of Construction Of The Traffic Systems In Particular When Constructing The Bridge Structures Time Limit For Receipt Of Tenders Or Requests To Participate Date 26 09 2019 Local Time 12 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 22231489
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.