Contract Notice Waste IncineratorsPlanning Construction And Maintenance Of A Turnkey Mono Sewage Sludge Incineration Plant Including The Construction Facilities With Upstream Sewage Sludge Drying At The Site Of The Wastewater Treatment Plant Wallmenroth 2Description The Treatment Plant Is Located In 57584 Wallmenroth The Possible Locations Of The Plant To Be Built Are Both Located On The Wastewater Treatment Plant The Area Is Indicated In The Land Use Plan As Area For Supply For Waste Disposal And Sewage Disposal As Well As For Deposition And Represented With The Signature Wastewater Treatment Plant Waste Water A Construction Law Approval Should Be Made In Accordance With 35 Para 1 Baugb The Overall Plant Concept To Be Created Must Make It Possible To Accept External Dewatered Sewage Sludge With An Average Solids Content Of 18 30 By Truck In Order To Ensure A Continuous Drying And Combustion Process With A Batch Or Batch Delivery A Sewage Sludge Storage Bunker With A Storage Volume Of Approx 5 Operating Days Should Be Planned The Plant Must Process At Least 10 000 Tonnes Per Annum Of Dewatered Sewage Sludge Optionally An Extension Should Be Provided That Can Handle Up To 18 200 Tonnes Per Annum The System Is To Operate As Far As Possible During Operation Of Heat Energy Self Sufficient The Plant Engineering Goal Of The Combustion Process Is To Obtain Or Produce A Sewage Sludge Mesh The Nutrients Of Which Are Available To The Plants Technologically Therefore To Avoid A Process That Leads To A Glazing Of The Ashes It Is Desirable That The Plant Eliminates Or Extracts The Heavy Metals Present In The Sewage Sludge Ash Or Sewage Sludge Ash So That The Ashes Can Be Used As Fertilizer It Is Also Desirable As Far As Possible To Describe A Method For Separating Phosphorus From The Ash It Is Desirable To Have An Energy Concept For Any Surplus Heat Energy It Is Desirable That The Plant Is Able To Process Sewage Sludge From Earth Moving Plants The Individual Structures Must Contain All The Necessary Peripherals As Well As The Operational Installation Of All Plant Components The Electrical And Tax Equipment As Well As All Conveyors At The Same Time The Necessary Halls And Adjustments Of The Site Have To Be Planned The Entire System Must Be Approved In Accordance With 19 Bimschg According To The 4Th Bimschv Section 8 1 1 4 The Approval Planning Must Therefore Observe A Combustion Throughputan Approved Plan Should Be Available Until 02 2020 The Plant Should Be Operated By The End Of 2021 The Maintenance Contract Is To Be Concluded For A Period Of 12 Years Time Limit For Receipt Of Tenders Or Requests To Participate Date 23 09 2019 Local Time 12 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 22149774
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.