Contract Notice Architectural Construction Engineering And Inspection ServicesU1 Viaduct Rehabilitation Op Lp 8 9Description U1 Viaduct Refurbishment Kottbusser Tor To Oberbaumbr ckelp 8 9 Incl Local Construction Supervision Acc 41 And Ff In The Achievement Picture Engineering Hoai And Other Special Achievements In The Period From April 2020 To April 2021 Berliner Verkehrsbetriebe Plans To Carry Out Refurbishment Work On The Elevated Railway Viaduct In The Area Of The U1 Line Between Kottbusser Tor And The Oberbaumbr cke The Section In The Underground Kleinprofil Runs Parallel To The Carriageways Of The Skalitzer Road In Berlin Kreuzberg During The Construction Period A Rail Replacement Bus Service Will Be Set Up The Renewal Of The Track Superstructure And The Track Systems Is To Be Carried Out In The Section From Km 7 4 52 To Km 7 9 53 Including The Station Silesian Gate In The Type Slab Track For The Construction Of The Slab Track Also Constructive Modifications To The Viaduct Are Required By Fixed Points Which Intervene In The Founding Of The Viaducts And Possibly Require Appropriate Line Transfers Or Line Fuses Following Construction Phase 3 The Track Superstructure Will Be Renewed From Km 7 9 53 To Km 8 1 95 At The Same Time Track Construction And Steel Construction Work In The Section From Km 6 4 To Km 6 8 13 Is Planned To Cover The Line Closure This Work Is Also Part Of The Tender After Complete Dismantling Of The Track Tracks 1 And 2 Including The Track Ballast The Hump Plates Of The Bridge Construction Are Cleaned Repaired And Provided With Corrosion Protection Afterwards The Tracks Will Be Mounted With New Superstructures In The Track End Position In The Section Km 6 9 41 To Km 7 0 48 G rlitzer Station The Existing Tracks And Track Systems Including Ballast Are To Be Dismantled And Stored For Re Installation Subsequent To This The Corrosion Protection Of The Hump Plates Also Takes Place Here This Is Followed By The Reassembly Of The Tracks And Track Systems With The Stored Materials For The Contents Evaluation And Fees Of The Planning Achievements The Hoai Version 2013 Applies The Services To Be Provided For The Construction Project Include Object Planning In The Sense Of 41 Ff Hoai The Fee Zone To Be Applied Is The Fee Zone Iii Below The Preliminary Chargeable Costs Amount To 24 032 652 76 Eur Net Time Limit For Receipt Of Tenders Or Requests To Participate Date 16 08 2019 Local Time 23 59 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 21377058
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.