Contract Notice Architectural Construction Engineering And Inspection ServicesKettenis Training And Development Of The Elementary School Complete Mission Project AuthorDescription Complete Mission Project Author Includes A Complete Architecture Mission A Complete Mission Of Static Engineers A Complete Mission Of Engineers In Special Techniques An Accompanying Mission In Sustainable Architecture A Mission Concerning Energy Efficiency Regulations An Accompanying Mission In Acoustics A Study Mission In Mobility A Mission In The Field Of Security Coordination For The Sections Project And Execution It Is To An Extension Of The Urban Elementary School Kettenis Of Ca 1 000 M2 Out Of About 700 M2 For Kindergarten And Primary School Classes The Renovation Of The Existing Building Along The Aachener Stra e As Well As The Entrances And The Environment Of The School In General The Extent Of The Renovations Will After Realization Of A Needs Analysis And An Energy Audit In The Mission Existing Building Old Buildings Are Fixed The Or The Location S Of Attachments Are Determined Among Other Things By A Mobility Analysis Which Is Foreseen In The Mission The Builder Will Pay Great Attention To The Rational Use Of Energy And Preventing The Use Of Environmentally Friendly Materials Prefabricated Construction Solutions Are Preferred To Keep The Impact Of School Operation As Low As Possible Sections The Project Is Divided Into 7 Sections 1St Section Fixed Apron Needs Assessment And Energy Audit Of Old Building Section 2 Fixed Sketch Section 3 Optional Preliminary Project 4 Ab Section Optional Approvals Section 5 Optional Tender Work Section 6 Optional Analysis Of Quotations Section 7 Optional Accompanying Execution Of Work To Definitive Acceptance Competences The Project Author Must Provide An Offer Which Includes The Complexity Of The Following Competences Architect Structural Engineer Engineer In Special Techniques Heating Sanitation Ventilation Electricity Lighting Fire And Burglary Security Engineer Consulting In Sustainable Architecture Responsible Energy Efficiency Author Of Feasibility Study Under New Specifications Regarding Energy Efficiency Acousticians Mobility Expert Safety And Health Coordinator Within The Project And Realization Coordination The Mission Includes A Coordination Mission For The Entity The Persons Concerned By The Project In All Phases Of The File Study And Construction Site The Team Of The Project Author W In Particular The Site Reports Will Be Written And Distributed By The Coordinator Alone He Will Also Be Responsible For The Periodic Review Of Consistency Between The Regulations Of Different Participants Of Team At All Stages Of The File Study And Construction Site In Particular Plans And Backgrounds Of Plans In Considering Go Techniques Are Checked For Financial Considerations The Coordinator The Summary Measures For The Entity Of Works Project And Execution All Lots Taken Together Teaching The Client To Provide A Clear And Accurate Estimation Of The Budget The Mission Does Not Include The Coordination Of The Lots In The Work Order Which Is Accepted By The Master Lot Budget See Specifications Chapter I 1P See Specifications Chapter Iii Time Limit For Receipt Of Tenders Or Requests To Participate Date 26 08 2019 Local Time 10 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 21121120
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.