Prior Information Notice Without Call For Competition Plumbing And Drain Laying Work31 Sanitary FacilitiesDescription General Description In The Former Plochingen Hospital 2 Storeys Are Under Construction Administration Office In The Other Properties To Be Rebuilt For Administrative Use For This Purpose The Following Roughly Described Measures Are Required For Sanitary Installation Disassembly Work The Existing Wet Rooms Wc Showers In The Former Hospital Rooms Are To Be Dismantled Ground Line Connections Are To Be Shut Down The Installation Of Shelves Cabinets Suspended Ceilings Etc Requires Specified Clear Room Heights Too Low Lying Existing Installations Are To Be Relocated The Complete Drinking Water Network Incl Oversized Drinking Water Distribution From Hospital Use Has To Be Dismantled For Drinking Water Hygiene Reasons And Rebuilt The Complete Central Hot Water Supply Including Hot Water Is No Longer Needed And Is To Be Dismantled The Water Treatment Plants Osmosis And Soft Water Systems Required For Hospital Operation And The Commercial Kitchen Will Be Dismantled Wastewater Plants The Existing Rainwater Pipes Are To Be Adapted To The New Use Of Space For This Purpose New Connections To The Underground Lines Are To Create For The New Furnishings The Wastewater Connections Must Be Recreated And Adapted To The Structural Conditions Water Systems For The Existing And New Wcs In The Central Zones New Washbasins Etc Are Planned For Completely New Water Pipes Cisterns And Furnishings At The End Of The Service Are Autom To Provide Flushing Valves To Ensure Sufficient Triknwasserhygiene Water Heating This Takes Place At The Washbasins Via Decentralized Electric Small Flow Heaters Fire Safety Measures F 90 Insulation For Pipe Penetrations Through Fire Resistant Walls Ceilings And Shafts Must Be Provided An Upgrade Of Existing Management Must Also Take Place Gas Systems Lpg Systems Propane Gas In The Course Of The Conversion Measures The Lpg Installations For The Emergency Supply Of The Boilers Within The Gas Transfer Chamber And Through The Boiler Room To The Two Burners Are To Be Dismantled In This Context The Burner Controls Are To Be Rebuilt So That No Automatic Switch To Lpg Operation Can Take Place Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20638073
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.