Contract notice Road Bridge Construction WorkBW 98 replacement bridge overpass St 2054 over A 9Description The existing bridge structure at the junction Allershausen which transfers the state road St 2054 on the federal motorway A9 Nuremberg Munich should be canceled and replaced by a new structure at the same place For the duration of the construction work a makeshift bridge will be built south of the building The bridge structure as well as the makeshift bridge are flattened The work will be carried out from 2019 to 2020 bridge length 58 3 m Span 29 15 29 15 m Bridge area 1 009 m3 Width between the railings 17 3 m Concrete superstructure precast beams 392 m3 Concrete superstructure crossbeam in situ concrete supplementation 324 m3 Concrete substructures 1271 m3 Reinforcing steel finished part beam 49 t Reinforcing steel cross beam in situ concrete supplementation 79 t Reinforcing steel substructures 205 t prestressing steel 23 4 t Concrete temporary bridge 58 m3 Reinforcing steel temporary bridge 16 t Sheet piling back anchored 240 m2 Beam screed 1 625 m2 Remove topsoil 310 m3 Create excavation pit 3 800 m3 Deliver soil 4 700 m3 manufacture ADS 6 000 m2 Time limit for receipt of tenders or requests to participate Date 27 06 2019 Local time 09 00 Disclaimer The above text is machine translated For accurate information kindly refer the original document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20373302
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.