Contract Notice Building Construction WorkFes Lv02 Scaffolding WorkDescription The Friedrich Ebert School In Mannheim Waldhof Was Built Until 1966 As An Elementary School With Affiliated Childrens Home The Architectural Appearance Of The School Is Characterized By The Combination Of Ocher Yellow Exposed Masonry With Exposed Concrete Parts The Entire Complex Is A Listed Building Remodeling And Renovation Measures Are Planned For Future Use As A Full Time Elementary School Without Altering The External Appearance Of The Building The Building Is Made Barrier Free By The Installation Of Elevators And Wheelchair Ramps And The Structural Fire Protection Is Improved By Additional Escape And Rescue Routes Over Roof The Roof Surfaces Are Renovated And Energetically Improved By High Quality Insulation Materials Since The School Will Be Redeveloped In Construction Phases Due To The Partial Use Of The Classes During The Conversion Period Only The So Called North Wing Will Be Installed In The First Construction Phase Parts Of The Scaffolding Are On Surface In The South However On The Ceiling With Limited Load Capacity These Scaffolds Have To Be Coordinated With The Statics Office Of The Project Team In The Course Of The Structural Analysis In The Following Construction Phase The So Called Class Tract Is To Be Equipped Also With Scaffolding In The North Of The Building On The Hall Ceiling Dimensions Of The Building Total Length North Wing Approx 140 00 Mtotal Building Depth Approx 54 00 M Largest North South Extension Building Heights Ok Attica From Approx 3 60 M North Side Kitchen Tract Up To Approx 13 20 M South Side Of 3 Storey Class Tract Construction Of The Roof Surfaces Scaffolding Position On Flat Roofs Reinforced Concrete Flat Roofs As Ribbed Or Slab Ceilings From The Year Of Construction With Bituminous Sealing Single Roof Areas With Height Graduation And A Large Number Of Light Domes In The Hall Area The Scaffolding Position On The Flat Roof Above The Halls Is To Be Coordinated With The Planning Statics Office Construction Division And Construction Phases There Are Three Different Structures Available Which Are Rehabilitated At Different Times The Following Structure Also Takes Into Account The Use Of The School In The First Construction Phase The Classroom 2Nd Ba Will Be Used By The School And The North Wing 1 Ba Will Be Rebuilt From The Summer Of 2020 When The 1St Ba Is Completed The Rehabilitation Of The 2 Ba Will Start And The School Operation Will Start In The North Wing Then Follows The Renovation Of The Gym 1 North Wing 1 Ba Essentially 1 To 2 Storey With Rotunda Cafeteria Attica Heights Of The Building From About 3 60 M To About 8 70 M2 South Wing Classrooms 2 Ba 3 Storey With Staggered Levels Attic Heights Of The Building Up To About 13 20 M3 Hallen 3 Ba 1 Storey Hall Between The Northern And Southern Structures With Non Rectangular Floor Plans And Offset Levels Attica Heights Of The Building From About 2 50 M To About 3 30 Mscope Performance Specification Length Oriented Approx 4200 M2roof Scaffold Approx 500 Mspatial Surface Oriented Approx 1800 M3pedestrian Tunnel Open Spaces South Approx 120 MTime Limit For Receipt Of Tenders Or Requests To Participate Date 26 06 2019 Local Time 10 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20350838
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.