Contract Notice Insulation WorkFes Lv03 Roofing WorkDescription The Friedrich Ebert School In Mannheim Waldhof Was Built Until 1966 As An Elementary School With Affiliated Childrens Home The Architectural Appearance Of The School Is Characterized By The Combination Of Ocher Yellow Exposed Masonry With Exposed Concrete Parts The Entire Complex Is A Listed Building Remodeling And Renovation Measures Are Planned For Future Use As A Full Time Elementary School Without Altering The External Appearance Of The Building The Building Is Made Barrier Free By The Installation Of Elevators And Wheelchair Ramps And The Structural Fire Protection Is Improved By Additional Escape And Rescue Routes Over Roof The Energetic Renovation Of The Roof Areas Because At Present There Are Only Emergency Waterproofing On The Roofs Is An Important Part Of The Renovation Concept Except For The Mensadach Are Unused Roof Areas Some Extensively Landscaped Some Newly Made With Gravel Surfaces The Mensadach Receives A Plate Covering As Originally In The Year Of Construction Available In General Warm Roof Constructions Are Carried Out With High Quality Insulation Laid Down The Slope The Main And Emergency Drainage Of All Roofs Will Be Completely Renewed The Existing Attic Covers Will Be Dismantled And Replaced With New Aluminum Sheet Covers Silver Colored Coordinated With The Monument Protection The Staircase To The Mensa Roof Receives A Titanzinkblechdeckung The Missing Fall Protection On The Roofs Are Produced The Lightning Protection System Will Also Be Renewed After Planning By The Electrical Specialist The School Operation Is Not Completely Outsourced But Takes Place Partly In Those Phases That Are Not Yet Rehabilitated Or Have Already Been Rehabilitated 1St And 2Nd Phase Of Construction The Gym Will Remain In Use Until Summer 2020 Construction Operation And School Use Are Strictly Separated So That No Restrictions In The Construction Operation Due To The Reuse Of Parts Have To Be Considered Dimensions Of The Building Total Length North Wing Approx 140 00 M Total Building Depth Approx 54 00 M Largest North South Extension Building Heights Ok Attica From Approx 3 60 M North Side Kitchen Tract To About 13 20 M South Side 3 Storey Class Tract Construction Of Roof Areas Reinforced Concrete Flat Roofs As Ribbed Or Slab Ceilings From The Year Of Construction With Bituminous Sealing Single Roof Areas With Strong Height Graduation Surrounding Fair Faced Concrete Attics And A Large Number Of Skylights In The Hall Area Penthouse Roofs Over The 2 Workrooms In The North Wing Are Designed As Flat Sloping Roofs Construction Division And Construction Phases There Are 3 Different Structures Available Which Are Rehabilitated At Different Times The Following Structure Also Takes Into Account The Use Of The School In The First Construction Phase The Classroom 2Nd Ba Will Be Used By The School And The North Wing 1 Ba Will Be Rebuilt From The Summer Of 2020 When The First Ba Is Completed The Rehabilitation Of The 2Nd Ba Will Begin And School Operations Will Start In The North Wing Then Follows The Renovation Of The Gym 1 North Wing 1St Ba Essentially 1 To 2 Storey With Rotunda Cafeteria Attica Heights Of The Building From About 3 60 M To About 8 70 M 2 South Wing Classrooms 2Nd Floor 3 Storey With Staggered Levels Attic Heights Of The Building Up To 13 20 M 3 Halls 3Rd Ba 1 Storey Hall Between The Northern And Southern Structures With Non Rectangular Floor Plans And Offset Levels Attica Heights Of The Building From About 2 50 M To About 3 30 M Scope Demolition Works Existing Roof Areas Approx 2 600 M2 Roofing Bitumin Warm Roof Approx 2 600 M2 Roof Drains Approx 50 St Plumbing Work Attic Cover Approx 1 750 M Titanium Zinc Sheet Roof Staircase Mensadach Approx 35 M2 Skylights 0 90 M To 1 50 M Approx 52 Pcs Green Roof Extensive Greening Approx 1 000 M2 Fall Protection All Roof Surfaces About 3 700 M2 Time Limit For Receipt Of Tenders Or Requests To Participate Date 26 06 2019 Local Time 10 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20350834
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.