Contract Notice Engineering ServicesA81 Sch pfbachtalbr cke U Muckbachtal Bridge Op Ing Bw TwpDescription Muckbachtalbr cke In The Course Of The Bab A 81 From Heilbronn To W rzburg The Muckbachtal Bridge Transports The Two Directional Lanes On 5 Separate Almost Identical Superstructures Over The Muckbach And The L 578 The 4 Lane Bridge Has 9 Fields With Spans Of 32 0 M 7 X 38 0 M 32 0 M Up The Total Length Of The Prestressed Concrete Box Girder Bridge Is Thus 330 M The Two Sub Structures Were Produced In 1969 72 Field By Field On Feed Armor And Put Into Operation In 1973 In The Years 1997 1998 Major Repair Work Was Carried Out On Both Superstructures Building Characteristicsasb No 6423 504Bridge Class Bk 60 According To Din 1072Width Between Railing 14 98 M Per Superstructurelane Width 11 50 M Per Superstructurebridge Surface 4 950 M2Each Superstructure 9 900 M2Totalclear Height 25 Mfor Existing Buildings Construction Single Celled Hollow Box Section Made Of Prestressed Concretemain Building Material Of The Superstructure Prestressed Concreteyear Of Construction 1973Single Span Block Lengths 32 0 M 7 X 38 0 M 32 0 Mremaining Service Life 2031Sch pfbachtalbr cke In The Course Of The A 81 Motorway From Weinsberg To W rzburg The Sch pfbachtalbr cke Bridge Transports The Two Carriageways On 5 Separate Superstructures Via The Sch pfbach And The K 2836 The 4 Lane Bridge Has 7 Fields With Spans Of 34 0 M 5 X 42 5 M 34 0 M Up The Total Length Of The Prestressed Concrete Box Girder Bridge Thus Amounts To 280 5 M The 5 Superstructures Were Produced In The Cycle Shift Method With The Production Site Was Located Behind The Abutment W rzburg The Two Superstructures Were Pushed Downhill In Accordance With The Longitudinal Gradient Of The Gradient First The Superstructure 2 Direction Weinsberg W rzburg Was Produced Asb No 6423 506Bridge Class Bk 60 According To Din 1072Width Between Railing 14 95 M Per Superstructurelane Width 11 50 M Per Superstructurebridge Area 4 193 M2Each Superstructure 8 386 M2Totalclear Height 25 Mfor Existing Buildings Construction Single Celled Hollow Box Section Made Of Prestressed Concretemain Building Material Of The Superstructure Prestressed Concreteyear 1972Single Span Block Lengths 34 0 M 5 X 42 5 M 34 0 Mremaining Service Life 2031After Evaluation Of The Recalculations Of The Structures The Feasibility Studies And The Economic Feasibility Studies Resulted In Each Case A Replacement Building For The Sch pfbachtalbr cke And Muckbachtalbr cke Time Limit For Receipt Of Tenders Or Requests To Participate Date 17 06 2019 Local Time 12 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20296127
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.