Contract Notice AlternatorsPower Plant Aue Revision Machine Group 1 Lot GeneratorDescription The River Power Plant Aue Consists Of A Central Office A Three Field Dam And A 300 M Long Upstream Power Station Canal In 2020 It Is Planned To Revise Machine Group 1 And Possibly Modernize It The Los Generator Revision Mg1 Includes The Disassembly Revision Modernization Reassembly And Commissioning Of The Following Generator Type Three Phase Ac Synchronous Generator Brushless With Plain Bearings Axis Tilted From Horizontal 13Orated Voltage 8 Kvpower Factor Cosf 0 8Rated Power Generator 2090 Kvanominal Output Turbine Including Gearbox 1740 Kwrated Speed Generator 1000 Rpmnominal Speed Turbine 136 4 Rpmblowing Speed Generator Approx 3045 Rpmblowing Speed Turbine Approx 415 Rpmthe Removal And Replacement Of The Transmission But Not The Revision Of The Transmission Itself And The Revision Of The Turbine Belong To A Separate Lot Time Limit For Receipt Of Tenders Or Requests To Participate Date 31 07 2019 Local Time 16 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20295246
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.