Contract Notice Secondary School Construction WorkRenovation U Extension Of The Bsz For Economics ZeignerDescription 1 Distributions And Built In Appliances 2 Pieces Low Voltage Main Distribution 1 Piece Of Transducer Measurements 24 Pieces Sub Distributors For Floors Kitchen Technology Field Distributors Volta Incl Load Breakers Approx 250 Pieces Of Fi Ls Switch B C Char Approx 300 Ls Switches B C Char Approx 20 Surge Arresters Including All Montages Deliveries 2 Cables Lines Laying Systems Approx 180 M 4 X 150 Mm2Service Line About 5 300 M 5 X 1 5 Mm2Power Line Halogen Free About 2 800 M 3 X 1 5 Mm2Power Line Halogen Free About 9 700 M 3 X 2 5 Mm2Power Line Halogen Free About 1 100 M Three Phase Cables 1 5 Mm2 25 Mm2 Approx 1 000 M Rks Cable Trays 100 500 Mm2Wide Approx 550 M Parapet Channel Sheet Steel 130 170 X 70 Approx 500 M Cable Trunking In Various Sizes 3 Installation Material And Accessories About 1450 Pieces Network Sockets Approx 330 Pieces Switch Button Approx 150 Pieces Presence Detector 4 Lights About 800 Pieces Of Lights Approx 200 Emergency Lights Including Central Battery System 5 Fire Protection Breakthroughs Approx 230 M Fire Protection Channel Fire Protection Measures In All Necessary Areasmake All Necessary Breakthroughs For The Installation6 Sunscreen Approx 35 Pieces Of Motor Control Units For El Sun Protection Incl Control And Supply Line 1 Piece Weather Station 7 Telecommunication And Information Technology Systems 1 Intercom With External And Internal Station 1 Piece Server Cabinet With 7 Patch Panels 48 P Approx 500 M Fiber Optic Cabling Inside Outside Incl Splice Boxes Splices Approx 17 500 M Cat 7 Data Cables Incl Measurements 8 Pa System 1 Piece Ela Center 2 Pieces Of Audio Loops With Amplifier About 230 Pieces Of Speakers Approx 1 500 M Of Installation Cable Halogen Free 9 Ema 1 Piece Central Approx 25 Pieces Of Motion Detector Approximately 1 200 M Telecommunication Telephone Lines 10 Bma 1 Piece Central Approx 160 Pieces Of Optical Smoke Detectors About 5 500 M Fire Alarm Cable 11 New Sports Hallservices 1 10 In Small Quantities For The Construction Of A Sports Hallincl Documentation Commissioning Of All Plantsmaintenance The Commissioning Of The Maintenance Contract Is Carried Out By The Property Management Agency At The Same Time As The Commissioning Of The Installation In The Bid Evaluation The Prices Stated In The Maintenance Offers Are Taken Into Account For A Planned Term Of 4 Years Without The Application Of A Present Value Factor An Undelivered Maintenance Contract May Lead To The Exclusion Of The Offer Submission Of The Original Calculation On Special Request Of The Awarding Authority Time Limit For Receipt Of Tenders Or Requests To Participate Date 07 06 2019 Local Time 15 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20132194
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.