Contract Notice Trunk Road Construction WorkA281 Ba4 Bl1 3A Agent SoundingDescription In The Course Of The 4Th Construction Phase Of The Bab 281 Between The Bab 1 And The Bab 27 Is Planned To Build In Building Km 2 124 815 The Bridge Structure 2472 Transfer Of The Carl Benz Stra e The Bridge Structure Is Deep Set And Within The Footprint Of The Road Embankment A Subsoil Improvement Is Carried Out As A Prerequisite For The Construction Of The 4Th Construction Section Of Bab 281 The Media Crossings And Crossings Are Concentrated In Five Media Crossings As A Preparatory Measure For The Construction Of The Bridge Structure Of The Carl Benz Stra e And Production Of The Media Intersections The Ordnance Clearance Of These Sub Areas Is To Be Established Surface Sounding Drilling Sounding Out Of Suspected Dud Suspect Points Disposal Of Ordnance By Soil Removal Volume Clearing In Individual Areas Exposure Of Suspicious Objects Excavation Of Calibrated Bomb Craters For The Following Areas Base Area Of The Road Embankment Of The Planned Carl Benz Stra e And The Connection To The H ttenstra e Area Below The Bridge Carl Benz Stra e Section Media Intersection 1 To 5 Individual Surfaces Such B Production Of Storage Areas Time Limit For Receipt Of Tenders Or Requests To Participate Date 18 06 2019 Local Time 09 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20108291
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.