Contract Notice Railway Construction WorksModernization Of The Railway Cont Network And Signal Systems And Telek In The Railway Sections Of The Post Krumovo And Skutare Districts Incl In The Stations Of The Districts Krumovo Skutare And Dist Post Thrace Under The Project Razv Of The Railway Junction Plovdiv Description Stage 1 Project And Prepare Of Doc For Construction Site Draft And Handover To Tech Project Tp According To Required Of An Embassy And Norm As Well As Techn Specific For An Opera Jointly Tsi Applicable In Europe And Legislation On All Project Parts Connected With Modernized Railway Train Including Subways Overpasses And Passers Sals Contact Network Km And Signaling System And Telecommunications Sit On The Railway Stations Plovdiv Po Krumo Kru And Po Skutare Skr Incl In Por Kru Skr And Div Post Fw Of Thrace Tk Coordinate Of Tp And Prepare Of Doc For Comp An Assessment Report Of And Ed The Construction Site And The Doc For Assessment Of The Project With The Required Tsi From Nobo Preparation Of The Project Stage Ii Construction Modernization Of The Railway And Commuter Including Underpasses Overpasses And Passers Sals On Railway Stations Po Kru And Po Sk Incl In Corp Kru Scr And Tk Strengthen On The Ground And Laying A Protective Layer Modern Highway Construction On Current Roads And On Chief Tracks In East Prussia Kru Skr And Tp Tk With New Type 60E1 Rails And New Stairways With Elast Unscrewing 42 158 M All In One Tracks In Kru And Skr With New Rails Type 49E1 And New Stairways With Power Unscrewing 1 964 M 1 Pc Et Call In The Tcp And Pre Track Grids With Re Routing Type 49 And New Buses Sleepers With Undersold Power Renewal Of 32 New Arrows With New Ones Renewal Of 12 New Arrows With New Ones And New 2 Way Arrows With New Ones Sleepers Rehabilitation Of Water Drainage New Drainage And New Drainage Systems Construction Of 6 New Platforms In Sofia Tp Tk Depot And Reconstruction Of The Existing One In Kru Reconstruction Of 1 St I Was Walking Subway In The Tk Built In 1 St Pedestrian Street Built On The Pedestrian Street At Two Levels In The Area Of The Railway Crossing At Km 15 606 On 3 New Road Excursions New Platforms Sheds In Year Skr Sp The Landfill And The Landfill Site On Request Hydrants In The Year Of Por Skr And Kru Of Sound Insulation In Urban Areas And In Prefabricated Buildings Throughout The Railway Line Modernization Of The Km Construction Of A New One Phase Contact System For Air Km Inter Por Por Pk Kru And Pk Scr With Nominal Voltage 25 Kv 50 Hz Ac Of New Metal Hot Dip Galvanized Poles Conductor Rope Consoles Isolators Sectional Disconnectors Reverse Feeders Fittings And Fasteners Details Replacement Of All Disconnectors Including The Disconnectors Of The Neutral Inserts With New Ones With Drive And Their Integration Into The Scada System For Year Pp Building Of A New Standalone Line And Km On Tracks 11 And 12 Modernization Of Sti Systems Making A Temporary Signal During Interruption Of The Station Center And The Mrp Replacement Of The Marshall Relay Center Mrc Scr And Mrc Tc With The Marshall Company Centralization Mccs With Led Signals Axle Counters And New Turn Point Turntables Soa New Main And Backup Power Supply Tps Will Be Managed By Mccs Replacement Of Intergate Blocks With Self Locking Self Locking Signals With Axis Counters In Pk Kru Pp Tk And Tk Scp Replacement Of Track Circuits With Axle Counters In The Upper Por Columns And Exc Replacement Of The Soa In Por Throat Making A Tube Network In The Pp Tk And Grid And Install The New Signal Power And Control Cables Per Division Connect The Mcc Scratch And The Mtr To The Dispatcher Center At Po Replacement Of Essential Train Protection With A New Etcs Level 1 In The Pos Rev Thr Porp Tk Skp Skr Manole The Electric Barrier At Km 163 472 In Kru The Installation Of The Video Camera For The Throat Of The Tp And The Pp The Electric Barrier At Km 163 472 And The Mcc Room Modern On The Power And Heating System Install New Booster Heating Kru Skr Por And Ft On A New Pylon And Onboard Illuminated Reconstruction On The Outside Electrical Power Plants In Corp Kru Scr Tk And Depot Stage Iii Getting The User Out And Proof Of Receipt Certificate For Operation App For The User Of The Dnsk According To The State Of The Art System The Plan And Proving The Test Results With The Relevant Structure Of The Support With Required Operating Instructions As Well As Sub Doc For Receiving Certificate For An Opera Compatibility Time Limit For Receipt Of Tenders Or Requests To Participate Date 01 07 2019 Local Time 16 45 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 19820448
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.