Contract Notice Water Treatment Plant Construction Work19 2429 Development Of A Biological Treatment Stage Sandefjord Treatment Facility Construction Work Including Hvac And Sanitary Installations B1Description Sandefjord Treatment Facility Will Expand The Existing Treatment Facility With A New Biological Treatment Facility And Flotation Stage The New Building Is To Be Integrated With The Existing Building And A New Roof Is To Be Constructed Over The Existing Basins Which Are Currently Outside The Project Will Be Carried Out With The Following Contracts M1 Machine Process InstallationsB1 Building Work Including Heating Water And Sewage And Hvac And Sanitary InstallationsE1 Electrotechnical InstallationsE2 Automation Operational Control Installations The Following Activities Are To Be Carried Out In This Contract B1 At The Same Time That The Existing Facility Is In Operation Construction Of A Complete New Building For Secondary Treatment Of Sewage Water Including Connections To The Existing Treatment Facility The Building Must Include The Following Functions Pump Room In The Basement Process Hall With Basins Biological Basins And Flotation As Well As Chutes For Transferring Sewage Water Between The Different Process Stages And To Lead The Cleaned Sewage Water To The Outflow Control Room Lift Person Lifts Switchboard Room Hc Wc And Cloakrooms Ventilation Room Blowing Machine Room Room For New Screw Pumps Walkways Stores And Chemical Room Ventilation Pressurised Air Water And Sewage And Lighting A Superstructure Is To Be Constructed Over The Old Sedimentation Basin In The Existing Facility Hvac And Sanitary Installations Are Included In The Contract Excavation Work For The Site Including Blasting Work Foundations Development Of A Driving Area Along The West Facade Of The Building As Well As The Development Of A Driving Area In The South East Of The Facility Constructional Steel And Concrete Work Joinery And Flashing And Guttering Work Welding And Heat Work Roof And Facade Work Steps Ladders And Railings External Water And Sewage Surface Water Management Work In The Security Area For The Biogas Facility There Will Be A Supplement Due To Geo Technical Surveys Time Limit For Receipt Of Tenders Or Requests To Participate Date 26 04 2019 Local Time 12 00
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 19222794
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.