Contract Notice Bridge Construction Work33130 001 Construction Of Movable Bridge Over Ribe Description On 26 August 2016 A Majority In The Folketing Agreed That A Bypass In Ribe Had To Be Established With Two Tracks In Each Direction And With A Moving Bridge Over Ribe The Bridge Must Be Constructed With Respect For The Cultural Environment In Which The Bridge Is Placed With Denmarks Oldest City Ribe And The Nordic Regions Oldest Cathedral Within Sight The Turnkey Contract Includes Demolition Of Existing Bridge Over Ribe Design And Execution Of The Moving Bridge The Bridge Must Have A Free Span Of At Least 36 5 M And A Clear Width Between Edge Beams Of At Least 10 M The Bridge Can Be Constructed As A Folding Bridge Swing Bridge Or Other Soil Drainage Bottom Protection Stable Gravel Asphalt Car Guard And Marking Work Of Approx 0 1 Km Main Road After Construction Of The Bridge The Contract Also Includes Removal Of The Interim Road West Of The Bridge Town The Turnkey Contract Must Be Completed In The Autumn Of 2019 Until The End Of 2020 With Final Work In The Spring Of 2021 Time Limit For Receipt Of Tenders Or Requests To Participate Date 01 04 2019 Local Time 11 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 18992820
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.