Contract Notice Sewage Treatment Plant Construction WorkBeckton Stw Amp7 UpgradeDescription Beckton Sewage Treatment Works Stw Is Thames WaterS And The UkS Largest Stw It Is Located In The London Borough Of Newham East Of London On The North Bank Of The River Thames The Design Flow To Full Treatment Capacity Is 27 04 M3 S With Flow Received From The Catchment Being Up To 33 M3 S The Works Which Are The Subject Matter Of This Contract Opportunity Are To Provide For Growth Resilience And Consent Compliance To A Design Horizon Of 2036 With The Population Equivalent Pe Projected To Be 4 540 000 And The Contract Will Also Include Related Design And Engineering Services And Associated Equipment During Operation Of The Tideway Pumping Station From October 2022 Up To 12 M3 S Will Be Discharged But The Rate Will Need To Be Controlled To Ensure That Flow Received At The Inlet Works Does Not Exceed 27 M3 S The Scope Of This Project Comprises The Following Core Activities Upgrade And Extension To The Inlet Works To Cater For Pro Longed Periods Of Operation Of The Tideway Pumping Station Provision Of Medium Screens And Screenings Handling Plant At The Existing Inlet Works Replacement And Upgrade Of Inlet Works Diesel Powered Generator Extension To Asp4 Secondary Treatment Process Capacity To Provide Resilience Against Growth The Operation Of The Tideway Pumping Station And High Ammonia Load Peaks During Storm Loading Conditions Provision Of Asp4 Additional Blower Capacity Including A New Blower House Building To Provide Resilience Against High Ammonia Load Peaks During Storm Loading Conditions Replacement Of Asp3 Air Lift Conveyance Mechanism For Discharging Final Effluent Into The River Thames With Low Lift Pumping Stations Provision Of Pumping StationS Diesel Powered Generators Provision Of Asp3 Additional Blower Capacity Including New Blower House Buildings Or Containerised Solutions To Provide Resilience Against High Ammonia Load Peaks During Storm Loading Conditions Additional Sludge Buffering And Balancing Tanks And Raw Sludge Thickening Capacity To Provide Resilience Against Sludge Stream Bottle Necks Restricting Final Effluent Stream Operation Extension To The Cake Barn Capital Maintenance Works For Replacement And Upgrade Of Hv Lv 11 Kv 6 Kv Transformers And Hv Lv 11 Kv 420 Kv Switchboards Modifications To The Power Management System Scada Supervisory Control And Data Acquisition And The Tiled Mimic Panel Time Limit For Receipt Of Tenders Or Requests To Participate Date 11 03 2019 Local Time 10 00
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 18726942
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.