Contract Notice Drainage And Surface WorksTamar Bridge Kerb Unit And Deck Waterproofing Remedial WorkDescription Preferred Methodology Remove And Retain Existing Kerb Units For Re Use Remove Existing Mild Steel Holding Down Studs Clean And Shot Blast Bridge Deck To Remove Corrosion Undertake Plate Testing Mpi And If Necessary Undertake Weld Repairs Weld New Stainless Steel Holding Down Studs To The Prepared Bridge Deck Undertake Weld Test Prime And Waterproof Bridge The Deck With A High Performance Waterproofing System Reinstate Kerb Units And Fix Down Using New Stainless Steel Fixings Make Good To All Drainage Connections With All Of These Aforementioned Activities Requiring Strict Associated Traffic Management Control It Is Anticipated That The Work May Last For A Duration Of Up To 12 Months From The Proposed Contract Commencement Date Of 1 4 2019 Interested Contractors Are Invited To Request A Copy Of The Trial Documentation For Information Via The Portal As This Is Likely To Be Of Assistance In Helping Them To Determine If They Can Offer The Same Or A Similarly Durable And Cost Effective Solution And Encourage A Tendered Submission In Due Course However No Information Taken Or Implied From This Trial Report And The Supporting Information Documents Shall Necessarily Be Deemed Acceptable For Incorporation In The Proposed Works And The Council Reserves The Right To Impose Contractual Terms And Specifications That May Not Be Satisfied By These Means In Addition As A Key Part Of This Procurement Process Any Prospective Tenderer Will At Their Own Cost And Risk Be Expected To Attend Or At Least Be Represented At The Designated Provider Information Event To Be Held At The Bridge Office And Currently Scheduled For 10 00 Am On Wednesday 7 11 2018 For Potential Bidders To Familiarize Themselves With Local Conditions Any Potential Operational Constraints And Ask Any Questions Of The Bridge Engineering Manager And His Technical Support Colleagues Attendance Is Strongly Advised But Not Mandatory And Any Contractors Unable To Be In Attendance Will Along With Those Who Were Be Provided In Writing With Any Information Or Questions Raised And Answers Given On The Day To Ensure All Parties Have The Same Information To Base Their Tender Submissions Upon And Seek To Avoid Any Future Confusion Or Misunderstandings Concerning The Specification And Scope Of Requirements Etc Contractors Will Be Permitted To Access The Bridge Under Supervision Wearing Either Their Own Or Suitable Ppe To Be Provided On Site And Are Requested To Use The Portal Messaging System To Confirm Their Attendance And The Names And Job Titles Of Those Anticipated To Be In Attendance The Main Meeting Point Contact And Address For Assembly Will Be As Follows Richard Cole Engineering Manager Tamar Bridge And Torpoint Ferry Joint Committee Tamar Bridge Offices Pemros Road St Budeaux Plymouth Pl5 1Lp Only If Your Company Or Its Representative S Is Unable To Attend At The Last Minute Or Unavoidably Detained Please Advise Richard Via Either Of The Following Means As Soon As Possible Telephone 01752 361577 Or Email Richard Cole Tamarcrossings Org UkAny Other Tender Related Queries Must Only Be Raised Via The Portal Messaging System Please Note This Tender Opportunity Is Being Advertised By The Joint Authorities Of Cornwall Council And Plymouth City Council On Behalf Of The Tamar Bridge And Torpoint Ferry Joint Committee Which Operates And Maintains The Bridge On Their Behalf Time Limit For Receipt Of Tenders Or Requests To Participate Date 17 12 2018 Local Time 15 00
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 17267040
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.