Contract Notice Construction WorkDesign And Construction Of Thermal Connections To The Pijarski Educational Complex At Ul Baltic Sea In Rzesz wDescription Iii 1 The Subject Of The Order Is Design And Construction Of Thermal Connections To The Pijarski Educational Complex At Ul Baltic Sea In Rzesz w 2 The Scope Of The Contract Includes Part I I 1 Development Of A Complete Design Documentation In Accordance With The Concept Of Construction Of Thermal Connections Constituting Annex 2 To The Tor In The Scope Of The Construction And Executive Project The Prepared Design Documentation Must Have All The Elements Required For The Construction And Maintenance Project And Contain All Necessary Decisions Opinions And Agreements I 2 Development Of Technical Specifications For Construction Work And Acceptance For The Implementation Of Thermal Connections I 3 Making The Ordering Party Declare The Intention Of Construction Works That Do Not Require A Building Permit Attention The Ordering Party Will Have The Right To Dispose Of The Real Properties For Construction Purposes At The Moment Of Signing The Contract With The Selected Contractor For The Implementation Of The Contract Complete Design Documentation Should Be Developed In Accordance With Technical Conditions For The Design Of Thermal Connections To The Pijarski Educational Complex At Ul Baltycka In Rzesz w Included In The Functional And Utility Program Annex No 1 To The Terms Of Reference Technical And Operational Guidelines For The Design Of Networks In The Rzesz w Heating System Included In The Functional Program Annex No 1 To The Terms Of Reference Technical Conditions Which Should Be Met By Materials For The Execution Of Underground Heating Networks From Pipes And Pre Insulated Elements In The Heating System In Rzesz w Included In The Functional Program Annex No 1 To The Terms Of Reference Technical Requirements For Dam Shutters Intended For Use In The Rzesz w Heating System Included In The Functional Program Annex No 1 To The Terms Of Reference Technical Requirements For Flanged Ball Valves And Welding Tips Included In The Functional Program Annex No 1 To The Terms Of Reference A Detailed Description Of The Subject Of The Contract In The Scope Of The Implementation Of Project Documentation Is Included In Annex No 1 To The Setc Functional And Operational Program I 4 The Contractor Is Obliged To Exercise Authors Supervision While Performing Construction Works Of The Subject Of The Order Carried Out On The Basis Of The Prepared Documentation In Accordance With The Terms Of The Tor With Attachments Activities Performed As Part Of The Authors Supervision Will Be Exercised At Every Request Of The Employer Or The Competent Authority Part Ii Ii 1 Construction Of Thermal Connections In Accordance With The Design Documentation Approved By The Employer In The Technology Of Pre Insulated Pipes Allowing For Continuous Operation Of The Heating System With Computing Parameters Temperature 1350 700 C And Maximum Working Pressure 1 6 Mpa Attention Materials Necessary For The Implementation Of The Designed Thermal Connections Are Protected By The Contractor In Its Entirety Ii 2 The Subject Of The Order For The Construction Of Connections Should Be Made In Accordance With A The Developed Building And Executive Project B Developed Technical Specification For Construction Work And Acceptance C Technical Conditions Which Should Be Met By Materials For The Execution Of Underground Heating Networks From Pipes And Pre Insulated Elements In The Heating System In Rzesz w Included In The Functional Program Annex No 1 To The Terms Of Reference D Conditions For The Execution And Acceptance Of Pipe Joints Couplers By Electrofusion Welding And Installation Of Heat Shrink Joints In The Rzesz w Heating System Included In The Functional Program Annex No 1 To The Terms Of Reference E Technical Requirements For Damper Damper Intended For Use In The Rzesz w Heating System Included In The Functional Program Annex No 1 To The Terms Of ReferenceF Technical Requirements For Flanged Ball Valves And Welding Tips Included In The Functional Program Annex No 1 To The Terms Of Reference G Requirements For The Execution Of An As Built Surveying Inventory Included In The Functional Program Annex No 1 To The Terms Of Reference H Requirements For Welders And Personnel Supervising The Execution Of Welding Works And X Ray Examination Of Welds Contained In The Functional And Use Program Annex No 1 To The Terms Of Reference I Principles Of Technical Knowledge Currently Binding Construction Law With Executive Acts To It And Health And Safety Regulations A Detailed Description Of The Subject Of The Contract For The Construction Of ConnectionsTime Limit For Receipt Of Tenders Or Requests To Participate 5 12 2018 11 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 17203966
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.