tender for Nawabganj Nagar Palika Parishad Water Supply Reorganization And House Connection Scheme Construction Of Ohr,Tw,Distribution System, House Connection, 1 Provide all materials, labour, T&P etc. complete and constructed pump house of size (3.0X3.60) cum chlorinating room of size (1.80X2.60) and By Pass Chamber as per departmental type design and drawing. 2 Repairing & painting of existing pump house of cum chlorinating room of sizeincluding supply of all labour, material, T&P etc complete. 3 Rising Main for Zone 1 to 14 4 Supply of following sizes of D.I pipesclass K-7/9 withalljointingmaterials including supply of all type of specials asperIS- 8329/2000 or its latest amendments including F.O.R. destination and all taxes and insurance etc. complete 5 200 mm dia DI.K-9 6 150 mm dia DI.K-9 7 Supply of following sizes of D.I double flangedsluicevalveasperI.S:14846:2000 working pressure 10 Kg/cm2 F.O.R. destination and all taxes and insurance. 8 200 mm 9 150 mm 10 Carting of following sizes D.I.D/F Sluice valve and specials from departmental store to site of work and lowering theminto the trenches, fixing in position and jointing them with pipelines and testing etc. complete (including supply of jointing materials) 11 200 mm 12 150 mm 13 Excavationfor pipe line trenches in ordinary soil(loam,clayorsand)includingliftupto 1.5m and refilling, watering, ramming of excavated earth into trenches anddisposal of surplus earth up to 50m from the center of thefoundation trenches. 14 Carting of following sizes D.I. pipes class K- 7/9 and specials to the site of work lowering them in to trench and laying true to alignment includingtestingofpipelinebutexcluding cost of trenching and cutting of pipes etc. formaking of length but including making joints. 15 200 mm dia DI.K-9 16 150 mm dia DI.K-9 17 Dismantling of following type road and stackingofusefulmaterial andtemporary reinstatementofroadwitholdmaterialsetc.complete. 18 Bituminous Road 19 Reinstatement of following type road and stackingofusefulmaterial andtemporary reinstatementofroadwitholdmaterialsetc.complete. 20 Bituminous Road 21 Supply of all material labour, T&P etc. Required and construct of Sluice Valve Chamber Masonry Type as per type design. 22 Thrust Block 23 R.C.C. with cement, coarse sand & 20 mm gauge stone ballast in proportion of 1:1.5:3 in thrust blocks of pipe line excluding supply of reinforcement & its bending but including its fixing & binding the same with 0.50 mm thick binding wire in position & necessary centering & shuttering including curing and supply of all materials, labour, T & P etc. required for proper completion of the work. 24 Mild steel or iron work in R.C.C. wrought to required shape as necessary including bending for proper completion of the work including supply of steel & wastage etc. 25 R.C.C. OHT 26 RENOVATION OF EXISTING OVER HEAD TANKS WHICH INCLUDES FOLLOWING ITEMS:Providing and erection of scaffolding and shuttering material like challi, gurra, nail, bans, ballia, patra etc. required for complete of work on all surgace area of OHT from top dome to G.L. so as to give strong and safe plateform to workers to work on all part of OHT for repair and strengthning as per direction of engineer in charge. Surface Preparation- The surface of structure to be treated for strengthning shall be reoughened properly either by raking joints or by haching the cement concrete surface with a specially made haching tool or otherwise alternatively to /make the surface rough and dust free byproviding spatter key or wire brush.Injection grouting in vertical surface/wall placing and fixing nozzle by drilling machine in tank wall having minimum dia of nozzle 15mm and provide on a regular interval not exceeding 1m including construction joints. Injection of pidicrete AM (Ploymer based on shrinkage high strength grout) admisxed with cement through nozle under pressure by sump @ 250gms per bag of cement sealing the nozzle after frounting with Ploymer product mixed with cement, making tank body in working and seapage free condition.Changeofsteelladderinsidethetank,repairof MH cover of top dome, change of mosqeuto jali with new one complete. Supply and fixing of 20mm dia G.I.Pipe railing in stair case and balcony. (Taking only 25% new and 75% old materials) Laying and fixing of 3mm thick MS wire mesh on roof of slab for nominal reinforcement including cost of all labour, materials, T&P etc required for completion of work25 mm thick 1:2:4 plain cement concrete flooring in apron with cement coarse sand and 20mm gauge stone ballast, laid in panels Finished with 3mm floating coat of neat cement of cement including 75mm thick base concrete of 1:4:8 including supply of all material. PaintingofoutersurfaceofOHTwithwheather proof paint (like apex etc.) as per direction of engineer in-charge. Painting of iron work with 1 coat primer & 2 coats of approved emultion paint as per direction of engineer incharge. 27 Zone-1, 1600 kL Capacity 16 M Staging 28 Zone-2, 1900 kL Capacity 18 M Staging 29 Zone-3, 1600 kL Capacity 18 M Staging 30 Zone-4, 1900 kL Capacity 18 M Staging 31 Zone-7, 1200 kL Capacity 16 M Staging 32 Zone-9, 600 kL Capacity 18 M Staging 33 Zone-12, 600 kL Capacity 16 M Staging 34 Construction of New OHT 35 Supply of all materials labour T&P etc. complete and construction of R.C.C. (M30 Grade)Over Head Tank of following capacity and staging above ground level with all work complete, including cost of soil testing. All the components of OHT will be casted in M30 concrete & specially in M-30 construction of water bearing structure with cement, coarse sand and approved stone grit as per I.S. 11682, I.S.3370 part (I) & (II) and I.S.456.Minimum depth of foundation below original ground level will be 2.5M. Seismic effects and wind load should be taken into consideration as I.S. 1893 for earthquake resistance and as per I.S. 875 part-III for wind load on structure (this area is in seismic Zone IV and high damage risk zone for wind).The cost of OHT should be quoted assuming the bearing capacity of soil as 8 M.T.per sqm. including 1M wide RCC staircase from ground level to balcony. M.S. ladder made of 50x50x6 mm angle section and 20mm plain M.S. bars (specification of M.S. should be as per IS 800-2007) with hand rails of 20mm medium class G.I. pipes on both sides in three rows from balcony to top dome resting on an RCC platform (75cmx75cm and 10cm thick) projecting from top ring beam and one aluminum ladder inside the tank body (from manhole in top dome to bottom as per design and specification approved by Engineer in charge. 1 m wide R.C.C. M25 balcony around the tank at the junction point of vertical wall and conical wall. Proper railing of 20mm dia medium class G.I. pipe (in 3 rows) on both sides of stair case, around the balcony, at each landing and from landing with top ring beam upto manhole on the top dome and at the periphery of top dome. The G.I. Pipes will be supported on M.S. posts made of or RCC post, spaced at intervals not more than 1.5m.Proper ventilator at top dome in circular shape of 1.2 m dia. along with an R.C.C. cover of minimum 1.50m dia and with mosquito net of standard quality along with expanded metaled jali between top dome and RCC cover. Water level indicator fabricated with good quality minimum 45mm x 45mm x 6mm M.S. angle with indicator board scale made 50x50x6mm M.S. angle section, of 3mm thick M.S. plate should have a clear width of minimum 25cm painted with good paint with brass wire rope, pulley, copper ball float, pointer etc. Lightening conductor should be as per I.S.S.2309 or its latest amendments of latest electricity rules. C.I. manhole cover of min 60x60cm size with locking arrangement, Supply, fixing & jointing of C.I.D./F Pipes (for inlet, outlet, washout and overflow pipes) and specials, duck foot bend and fixing of the sluice valve at outlet and wash put pipe with all specials; construction of sluice valve chamber, floor and apron with semi circular drain around the apron with 25mm PCC 1:2:4 over 75 mm PCC 1:4:8, Apex painting on outer surface of OHT, painting on MS ladder, railing, vertical pipe etc. as per approved make; excavation in all type of soil and all other works required for proper and complete construction 36 Zone-5, 1800 kL Capacity 22 M Staging 37 Zone-6, 1800 kL Capacity 18 M Staging 38 Zone-8, 1200 kL Capacity 18 M Staging 39 Zone-10, 2200 kL Capacity 22 M Staging 40 Zone-11, 1900 kL Capacity 20 M Staging 41 Zone-13, 600 kL Capacity 22 M Staging 42 Zone-14, 600 kL Capacity 22 M Staging 43 Construction of CWR 44 Zone-1, 400 kL Capacity 45 Zone-2, 500 kL Capacity 46 Zone-3, 400 kL Capacity 47 Zone-4, 500 kL Capacity 48 Zone-7, 300 kL Capacity 49 Zone-8, 600 kL Capacity 50 Zone-10, 600 kL Capacity 51 Distribution System Zone 1 to 14 52 Excavation of earth in ordinary soil (loam, clay or sand)forlayingofpipelineincludingrefilling anddisposal of surplus earth for different size of pipe lift up to1.5m and50 m away. 53 Supplyoffollowingsizesofpipeincludingrail way freight and cartage as per IS 8329/2000 and IS4984/2016ortheirlatestamendmentsupto divisional store including all taxes etc. complete. 54 HDPE Pipe (Grade PE-100) PN-6 55 90mm diaO.D. 56 110mm dia O.D. 57 140 mm dia O.D. 58 160 mm dia O.D. 59 DI Pipe K-7 60 200mm dia 61 250mm dia 62 300mm dia 63 350mm dia 64 400mm dia 65 450mm dia 66 500mm dia 67 Carting, laying and jointing by Electrofusion Method of the following sizes ofpipe intothetrenchesincludingcostofall jointingmaterial,labour,T&Pandtestingetc, complete. The rate includes all material, labour and T&P for electrofusion jointing of HDPE pipe. 68 HDPE Pipe (Grade PE-100) PN-6 69 90mm diaO.D. 70 110mm dia O.D. 71 140 mm dia O.D. 72 160 mm dia O.D. 73 DI Pipe K-7 74 200mm dia 75 250mm dia 76 300mm dia 77 350mm dia 78 400mm dia 79 450mm dia 80 500mm dia 81 Supply of following types of fitting including rail wayfreight,cartageuptostore, all taxesand insurance.D.I.D/FSluiceValve/ScourValveas per IS 14846:2000 suitable for workingpressure10 kg/cm2. 82 D.I.D/F Sluice Valve 83 80mm dia 84 100mm dia 85 125mm dia 86 150mm dia 87 200mm dia 88 250mm dia 89 300mm dia 90 350mm dia 91 400mm dia 92 450mm dia 93 500mm dia 94 Scour Valve 80mm dia 95 Supply of under ground sluice value type firehydrant consisting of 80 mm dia sluice valve,80mm dia tail pieces, 80mm dia duck foot bend and 63 mm dia standard makes iron coupling with cap and etc. Complete conforming to latest/relevent I.S.specifications including all taxes and insurance. 96 Supply of 20 mm dia screwed down type air valve with gun metal seat, F.O.R. destination,including all taxes and insurance. 97 20 mm dia 98 CartingoffollowingsizesD.I.D/FSluicevalve andspecialsfromdepartmentalstoretositeof work and lowering them into the trenches, fixing inpositionandjointingthemwithpipelinesand testing etc. complete (including supply of jointing materials) 99 D.I.D/F Sluice Valve 100 80mm dia 101 100mm dia 102 125mm dia 103 150mm dia 104 200mm dia 105 250mm dia 106 300mm dia 107 350mm dia 108 400mm dia 109 450mm dia 110 500mm dia 111 Scour Valve 80 mm dia 112 Carting of 80 mm dia flanged fire hydrant to the site of works, lowering them into already prepared trenches and fixing them in position including baring and threading the main etc. Complete including thr cost of bailing out of water, supply of jointing materials such as nut-bolts, rubber insertions, white lead etc. Including their testing complete. 113 Carting from site store the 20 mm dia screwed down air valves, to the site of works, lowring them into already prepared trenches and fixing them in position including boring and threading the main etc. Complete and including the cost of bailing out of water , supply of jointing materials such as nut-bolts, rubber insertions, white lead etc.Including their testing complete. 114 Supply of all type materials and construct following chamber as per type design with supply of all labour, T & P etc. complete. 115 Masonry Type 116 Surface Box Type 117 Fire Hydrant Chamber 118 Air Valve Chamber 119 ScourValve Chamber 120 Dismantlingoffollowingtyperoadandstacking of useful material and temporary reinstatement of road with old materials etc. complete. 121 CC Road 122 Bituminous Road 123 B.O.E Road 124 Interlocking Road 125 Reinstatement of following type road and stacking of useful material and temporary reinstatement of road with old materials etc. complete. 126 CC Road 127 Bituminous Road 128 Bituminous Road PWD 129 B.O.E. Surface (Assuming 40% new brick and 60% old bricks used) 130 Interlocking Surface (Assuming 40% new brick and 60% old bricks used) 131 Provision for crossings of nalas & culvert includingsiftingoftelephonecablesetc.Along the alignment of pipeline including supply of C.I. tytonpipeand specialsetc.complete.(3.5M. Wide Road) 132 Provision forInstallation of ductpipesby Augerboringmethodincludingmakingofentry andexitpitsupto3mtrdepth,allrelatedcivil works like excavation etc. lowering of pipe segmentsinthejackingpit,layingjointingof pipeline through jacking process as per the instruction of Engineer-in-charge all complete. 133 Road Crossing through trenchless technique 134 Road Crossing through trenchless technique (200mm to 350 mm 135 Sand Filling 136 Interconnection of new pipeline with existing pipeline including trenching,jointing,testing etc complete. PVC/HDPE to HDPE 137 Interconnection of new pipeline with existing pipeline including trenching,jointing,testing etc complete. DI/CI to DI upto 350 mm dia 138 Construction of booster pump rooms including all required material labour T&P as per approved drawing and desigen plinth area rate. 139 Boundary Wall Gate and approchroad and site devlopment 140 Construction of Boundary Wall including Supply all materials, labour, T&P etc. required for proper completion of work as per type design. 141 Supplyandfixing3.6M&1.20MwideMSGatewith pillersincludingfabrication andsupplyofsteeland construction of boundary pillarsetc. completefor pump house 142 Provideallmaterials,labour,T&Petc.Requiredfor propercompletionofworkandconstructInterlocking Tiles approach road, laid dry and joints intact with coarse sand mortar including preparation of base etc. 143 Drain 144 Provide all materials labour, T&P etc. complete and construction of One Set staff quarter for operators & chaukidar as per departmental type design and drawing 145 Construction ofMaster Control Station. Building shall be RCC framed structure including all amenities like water supply, drainage, fire fighting, electrical fittings.required fall cellings/ wall panneling including all required furniturefor 10 persons in confrence rooms and other officers room as per standerd All specification shall be conforming to PWD/CPWD/C&DS building specification. 146 Construction ofRecharging Unit of ground water by rain water in water works sites as per the drawingor approved by Engineer in charge including supply of all materials, labour, T&P etc. required for proper completion of work. 147 HOUSE CONNECTION IN NEW PIPE LINE 148 Materials 149 20 mm dia (OD) HDPE pipe (12.5 KG/CM2) 150 15 mm dia (OD) GI pipe Class- B 151 Providing & supplying of clamp saddle (MS saddle for DI Pipe and Electrofusion Saddle For HDPE Pipe) for House service connections shall be of fastened strap type with threaded outlet for service connection.Clamp saddle shall be suitable for nominal size of distribution mains pipe line. The strap shall be elastomer coated ( insulated) type for firm grip on pipe as well as to protect the coating on the pipe and to insulate the unidentical metals. The saddle shall be single strap type up to pipe size of NB 600 and service outlet 15mm. Fasteners shall be of threaded nut bolt washer type. The sealing between the saddle and mains shall be obtained by using a profiled elastomer seal matching to the curvature of the pipe. The seal shall be elastomer type, suitable for all potable water application. The material of construction of the body, straps, fasteners etc. shall be non-corrosive material sucha as engineering plastic (PE/PP) or stainless steel of a combination of both and shall ne inclusive of all cost such as testing,inspection charges, transporation up to site, transit, insurance, loading, unloading, stacking etc. complete. 152 90 to 110 NB x 15 mm 153 140 to 160 NB x 15 mm 154 200 to 250 NB x 15 mm 155 300 to 350 NB x 15 mm 156 Labour 157 Making ferrule connection in. Distribution mainswith saddle piece, service connections, fittings, and fixing of G.M. Ferrule of 15 mm size inculding tapping the main and.cutting threading and fitting GI pipe and specials including supply of all binding materials such as white lead and teflon tape including making hole in wall and plastering the same with mortar including cost of mortar and also including the cost of crossing the drain including all labour, T&P complete as per direction of EIC 158 Dismantlingoffollowingtyperoadandstacking of useful material and temporary reinstatement of road with old materials etc. complete. 159 CC Road 160 Bituminous Road 161 B.O.E Road 162 Interlocking Road 163 Reinstatement of following type road and stacking of useful material and temporary reinstatement of road with old materials etc. complete. 164 CC Road 165 Bituminous Road 166 Bituminous Road PWD 167 B.O.E. Surface (Assuming 40% new brick and 60% old bricks used) 168 Interlocking Surface (Assuming 40% new brick and 60% old bricks used) 169 Construction of TW for 1200/1100 LPM 170 TRANSPORTATION 171 Transportation of rig machineincluding Loading , unloading, Erection, Dismantling & labour etc complete in all respect . 172 Transportation of 250psi compressor including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . 173 Transportation of 3 cusec op unit including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . 174 Transportation of TubewellL Assemblyincluding Loading , unloading with labour etc complete in all respect . 175 CONSTRUCTION OF TUBE WELL (DRILLING) As per IS 2800 (Part I & II) 176 DC Drilling upto 200M 177 Logging of Bore 178 Drilling of 600mm dia bore from G.L. to 47 m BGL. 179 Drilling of 500mm dia bore from 47 m BGL to 100m BGL. 180 Drilling of 500mm dia bore from 101m BGL to 165m BGL. 181 LOWERING OF TUBE WELL ASSEMBLY AND SHROUDING OF T.W. BY GRAVEL- 182 Welding and lowering of TW Assembly (including electrodes welding set and generator etc. required for completion of work) as per following : Lowering of 300mm X 200mm dia (tube well assembly in bore hole and shrouding of pea gravel between annular space of bore hole and T.W. assembly from G.L. to 150m BGL. 183 Lowering of 300mm dia MSERW 7.1mm thick plain pipe from GL to 42 m BGL. 184 Lowering of 200mm dia MSERW plain/slotted pipe 7.1mm thick from 42m BGL to 100m BGL. 185 Lowering of 200mm dia MSERW plain/slotted pipe 7.1mm thick from 101m BGL to 150m BGL. 186 TUBE WELL: ASSEMBLY (As per IS 4270, IS 8110) 187 M.S. Tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) well cap, bail pliug, clamp, reducer, centre guide, support structure etc as required & as per typed design complete in all respect. 188 300mm dia size MSERW housing pipe 7.1mm thick including with 1 no 300 X200mm dia M.S reducer 16mm thick, 1 noM.S. well cap 12mm thick , 10 no M.S. ring 100X12mm thick, M.S. S/I clamp ,T.W. Support (I Section) etc comp in all respect . 189 200mm dia MSERW 7.1mm thick plain /slotted pipe including with 20 no M.S ring 100X12mmthick , 1 noM.S. bail plug , 10 no center guide etc comp in all respect. 190 PEA-GRAVEL (As per IS 4097) 191 1.60mm to 4.80mm size pea-gravel of Lalkuwan quarry duly screened, washed and proper stackingat site. 192 DEVELOPMNET OF TUBE WELL 193 Development of tube well by 250 PSI air compressor 194 Development of tube well by 3 cusec O.P. Unit 195 Development of tube well by 3 cusec O.P. Unit. 196 TEST 197 Chemical and bacteriological test. 198 Construction of TW for 800 LPM 199 TRANSPORTATION 200 Transportation of rig machineincluding Loading , unloading, Erection, Dismantling & labour etc complete in all respect . 201 Transportation of 250psi compressor including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . 202 Transportation of 3 cusec op unit including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . 203 Transportation of TubewellL Assemblyincluding Loading , unloading with labour etc complete in all respect . 204 CONSTRUCTION OF TUBE WELL (DRILLING) As per IS 2800 (Part I & II) 205 DC Drilling upto 200M 206 Logging of Bore 207 Drilling of 600mm dia bore from G.L. to 65 m BGL. 208 Drilling of 500mm dia bore from 65 m BGL to 100m BGL. 209 Drilling of 500mm dia bore from 101m BGL to 165m BGL. 210 LOWERING OF TUBE WELL ASSEMBLY AND SHROUDING OF T.W. BY GRAVEL- 211 Welding and lowering of TW Assembly (including electrodes welding set and generator etc. required for completion of work) as per following : Lowering of 200mm X 150mm dia (tube well assembly in bore hole and shrouding of pea gravel between annular space of bore hole and T.W. assembly from G.L. to 150m BGL. 212 Lowering of 200mm dia MSERW 7.1mm thick plain pipe from GL to 60m BGL. 213 Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm thick from 60m BGL to 100m BGL. 214 Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm thick from 101m BGL to 150m BGL. 215 TUBE WELL: ASSEMBLY (As per IS 4270, IS 8110) 216 M.S. Tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) well cap, bail pliug, clamp, reducer, centre guide, support structure etc as required & as per typed design complete in all respect. 217 200mm dia size MSERW housing pipe 7.1mm thick including with 1 no 200 X150mm dia M.S reducer 16mm thick, 1 noM.S. well cap 12mm thick , 10 no M.S. ring 100X12mm thick, M.S. S/I clamp ,T.W. Support (I Section) etc comp in all respect . 218 150mm dia MSERW 7.1mm thick plain /slotted pipe including with 20 no M.S ring 100X12mmthick , 1 noM.S. bail plug , 10 no center guide etc comp in all respect. 219 PEA-GRAVEL (As per IS 4097) 220 1.60mm to 4.80mm size pea-gravel of Lalkuwan quarry duly screened, washed and proper stackingat site. 221 DEVELOPMNET OF TUBE WELL 222 Development of tube well by 250 PSI air compressor 223 Cutting of T.W. cover by gas cutter, re-welding of T.W. cover by Electric welding after complete development of work. 224 Development of tube well by 3 cusec O.P. Unit 225 Cutting of housing cover by gas cutter 226 Development of tube well by 3 cusec O.P. Unit. 227 Re-welding of Tube well cover by Electric welding 228 TEST 229 Chemical and bacteriological test. 230 Construction of TW for 700 LPM 231 TRANSPORTATION 232 Transportation of rig machineincluding Loading , unloading, Erection, Dismantling & labour etc complete in all respect . 233 Transportation of 250psi compressor including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . 234 Transportation of 3 cusec op unit including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . 235 Transportation of TubewellL Assemblyincluding Loading , unloading with labour etc complete in all respect . 236 CONSTRUCTION OF TUBE WELL (DRILLING) As per IS 2800 (Part I & II) 237 DC Drilling upto 200M 238 Logging of Bore 239 Drilling of 600mm dia bore from G.L. to 47 m BGL. 240 Drilling of 500mm dia bore from 47 m BGL to 100m BGL. 241 Drilling of 500mm dia bore from 101m BGL to 165m BGL. 242 LOWERING OF TUBE WELL ASSEMBLY AND SHROUDING OF T.W. BY GRAVEL- 243 Welding and lowering of TW Assembly (including electrodes welding set and generator etc. required for completion of work) as per following : Lowering of 300mm X 150mm dia (tube well assembly in bore hole and shrouding of pea gravel between annular space of bore hole and T.W. assembly from G.L. to 150m BGL. 244 Lowering of 300mm dia MSERW 7.1mm thick plain pipe from GL to 42m BGL. 245 Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm thick from 42m BGL to 100m BGL. 246 Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm thick from 101m BGL to 150m BGL. 247 TUBE WELL: ASSEMBLY (As per IS 4270, IS 8110) 248 M.S. Tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) well cap, bail pliug, clamp, reducer, centre guide, support structure etc as required & as per typed design complete in all respect. 249 300mm dia size MSERW housing pipe 7.1mm thick including with 1 no 300 X150mm dia M.S reducer 16mm thick, 1 noM.S. well cap 12mm thick , 10 no M.S. ring 100X12mm thick, M.S. S/I clamp ,T.W. Support (I Section) etc comp in all respect . 250 150mm dia MSERW 7.1mm thick plain /slotted pipe including with 20 no M.S ring 100X12mmthick , 1 noM.S. bail plug , 10 no center guide etc comp in all respect. 251 PEA-GRAVEL (As per IS 4097) 252 1.60mm to 4.80mm size pea-gravel of Lalkuwan quarry duly screened, washed and proper stackingat site. 253 DEVELOPMNET OF TUBE WELL 254 Development of tube well by 250 PSI air compressor 255 Development of tube well by 3 cusec O.P. Unit 256 Development of tube well by 3 cusec O.P. Unit. 257 TEST 258 Chemical and bacteriological test. 259 Pumping Plant & Instrumentation Including Servo Stablizer and Chlorinating Plant For New/Existing Tubewells 260 SITC of 1200 LPM submersible clear water pumping plant ( suitable head as per site condition and direction of engineer in charge) suitable to operate on 415+ %5 volt, 50 Hz, 3 phase A.C. supply (as per IS 8034-1989) with 150 mm dia column pipe 24 meter,150 mm dia NRV,150 mm dia CI D/F Bend 90 Degree,150 mm dia CI A/F Tee, 150 mm dia D/F pipe (1.5 m long 2 nos. and 1 m long 1 no.), earthing, painting, Toolset, stabilizer, wiring of pump house internal and external, chainpully block , and all pumping plant accessories with nut bolts and rubber packing etc. 261 SITC of 800 LPM submersible clear water pumping plant ( suitable head as per site condition and direction of engineer in charge) suitable to operate on 415+ %5 volt, 50 Hz, 3 phase A.C. supply (as per IS 8034-1989) with 100 mm dia column pipe 24 meter,100 mm dia NRV,100 mm dia CI D/F Bend 90 Degree,100 mm dia CI A/F Tee, 100 mm dia D/F pipe (1.5 m long 2 nos. and 1 m long 1 no.), earthing, painting, Toolset, stabilizer, wiring of pump house internal and external, chainpully block , and all pumping plant accessories with nut bolts and rubber packing etc. 262 SCADA compatable chlorinatingSystem 263 Supply & Erection of Servo Stabilizer of 15 KVA 264 Supply & Erection of Servo Stabilizer of 20 KVA 265 Supply & Erection of Servo Stabilizer of 30KVA 266 Supply & Erection of Servo Stabilizer of 40 KVA 267 CE / UL certified Intelligent smart energy meter 268 Motor OperatedActuator having positioning card with Sluice Valve (150mm) 269 Motor OperatedActuator having positioning card with Sluice Valve (100mm) 270 CE / UL certified Electromagneticflowmeter of size:150mm 271 CE / UL certified Electromagneticflowmeter of size:100mm 272 Digital Soft starter (7.5 KW) 273 Digital Soft starter (15 - 22KW) 274 Digital Soft starter (22 -30KW) 275 Digital Soft starter (30 -45KW) 276 Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (100 Amps) 277 CE / UL certified Hydrostatatic type sub soil water level transmitter 278 CE / UL certified Pressure Transmitter 279 CE / UL certified Surge protector for control panel 280 CE / UL certified 7" HMI touchscreen suitable to communicate with PLC/RTU, for local display & control of process parameters 281 Control panel with IP 54 protection, industrial grade from all equipments (separate for control (24V) and power equipments. 282 Complete Cabling for tubewell including all power & control cables of all equipment at pumphouse and OHT 283 Suppy and Installation of Suitable Size Armored Cable including copper lugs etc. complete work. 284 Internal electrification of pump house and chlorinating room. 285 SITC ofSCADA And Automation for New/Existing TWs 286 Fully Automation of T/W through SCADA complete in all respect e.g. supply installationtesting of all required RTU, wireless communication device, control panel, PLC, Programming,software, Licences, wiring etc complete in all respect including mobile based app development and interconnection with LCS,MCS central control room Barabanki & central control room Lucknow as per 24 x 7 water supply requirement. 287 Pumping Plant & Instrumentation Of CWR Zone 1 288 V.T. Pump- Motor Set 289 1900 LPM 40M head Clear Water 1450 RPM,surfacedischarge,self water lubricated, Bottom Suction with 150 mm dia size & 6 M long column Assembly ( Column Pipeshaft & Rubber spider) Discharge head, Top shaft, rachet to prevent reverse rotation, suitable to couple with 3 phase 4 Pole, Vertical hollow shaft1450 RPM squirrel cage 400 V±10% 50 Hz, AC, Motor etc. (or suitable head, H.P, RPM of pump motor & size & length of coloumn pipes as per site condition and direction of engineer in charge) 290 Starter 291 Provision of Digital Soft Starter to operate Upto 35 HP motor(or suitable Capacity as per site condition and direction of engineer in charge) at 0.4KV +10%3phase,50Hz. A.C. and to control the above motors. It shall comprise of all protection devicesas per latest I.S.S. specifications. 292 L.T. Switchgear Panel Board 293 Provision of 1 no. panelextensible typeswitchboard suitable for 0.4 KV3 phase 50 HZ. A.C. in cubical pattern, floor mountingcompletewith insulatedbus bars of suitable size forrequiredload. The switch board shall consist of the following : a. Oneno.Incoming Panelcomprisingof100AmpsMCCB indoor vertical isolation horizontally drawouttype withrelays as per ISS.Panelwill be comprisingof voltmeterwith selector switch, power factor meter,frequencymeter. KWH meter and ammetercomplete with selector switch, motor protection relay etc to operate 03 nos. 35 H.P. motor(or suitable Capacity as per site condition and direction of engineer in charge). . b. 3 Nos. outgoing panelsfor pumping plants. Each panel of 100Amps capacity MCCB with ammeter and C.T.with selector switch, KW meter, single phasing preventer, capacitor etc to operate 03 nos. 35 H.P. motor. c. 2 No. outgoing panels for misc. work comprising of 100Amp MCCB. 294 Provision and laying of PVC armoured Power cables of requiredsizes with earthing material.for internal wiring i.e Panel to Starters and from Starters to Motors 295 Delivery pipes and specials as per details given below (or suitable size as per site condition and direction of engineer in charge): 150 mm size individual delivery and 250 mm size common delivery with jointing material, valves, Tee, bends etc.a. 150 mm dia Detachable Joint-3 Nosb. 150 mm dia Bend- 3 Nosc. 150 X 250 mm Tee- 3 Nos d. 250 mm Reflux Valve-1 Nos.e. 250 mm dia Duckfoot Bend-1 Nos.f. 250 mm dia Common Header-15 M g. 250 mm dia Blind Flange-1 No 296 Provision of MS Girder for pump base etc. 297 Chukkered Plate and Grills to cover the Gaps between Girder and Adjacent Pumps 298 Internal electrification of Pump House (CWR), Pannel roomand campus with Light & Fan wiring and& other Necessary works. 299 Supply of Electro menhanical type chlorinating plant 0 to 30 LPHcapacity pump set Suitable for 500 Kg./Cm2 working pressure to feedsodiumhypochloridesolutioncomplete ste, Sodium Hypochloride liquid is used in this type of chlorinator which contains 120 gms of chlorine in 1000 ml Quantity Confirming quality Manegment System Standard NS-EN ISO 9001-2000 300 H.O.T. crane of 3 Tones capacity , Lift 4.5 Mtr 301 Testing of pumps & other equipment at work site 302 Painting of equipment with two coats. 303 CE / UL certified Intelligent smart energy meter 304 Motor Operatedsluice valve with Actuator for Pumps(150mm)(or suitable size as per site condition and direction of engineer in charge) 305 Motor Operatedsluice valve with Actuator for Common Header (250mm)(or suitable size as per site condition and direction of engineer in charge) 306 Electromagneticflowmeter of size: 250mm for common header(or suitable size as per site condition and direction of engineer in charge) 307 Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (160 Amps) 308 CE / UL certifiedRadar type Level Transmitter for CWR 309 CE / UL certifiedSmart Pressure Transmitter 310 CE / UL certified Surge protector for control panel 311 CE / UL certified 7" HMI touchscreen suitable to communicate with PLC/RTU, for local display & control of process parameters 312 Complete Cabling for ZPS including all power & control cable of all equipments at ZPS and OHT 313 Control panel with IP 54 protection, industrial grade fro all equipments (separate for control (24V) and power equipments. 314 Installation, commissioning & testing 315 Pumping Plant & Instrumentation Of CWR Zone 2 316 V.T. Pump- Motor Set 317 2700 LPM 40M head Clear Water 1450 RPM, surfacedischarge,self water lubricated, Bottom Suction with 200 mm dia size 6 M long column Assembly ( Column Pipeshaft & Rubber spider) Discharge head, Top shaft, rachet to prevent reverse rotation, suitable to couple with 3 phase 4 Pole, Vertical hollow shaft1450 RPM squirrel cage 400 V±10% 50 Hz, AC, Motor etc. (or suitable head, H.P, RPM of pump motor & size & length of coloumn pipes as per site condition and direction of engineer in charge) 318 Starter 319 Provision of Digital Soft Starter to operate Upto 40 HP motor(or suitable Capacity as per site condition and direction of engineer in charge) at 0.4KV +10%3phase,50Hz. A.C. and to control the above motors. It shall comprise of all protection devicesas per latest I.S.S. specifications. 320 L.T. Switchgear Panel Board 321 Provision of 1 no. panelextensible typeswitchboard suitable for 0.4 KV3 phase 50 HZ. A.C. in cubical pattern, floor mountingcompletewith insulatedbus bars of suitable size forrequiredload. The switch board shall consist of the following : a. Oneno.Incoming Panelcomprisingof100AmpsMCCB indoor vertical isolation horizontally drawouttype withrelays as per ISS.Panelwill be comprisingof voltmeterwith selector switch, power factor meter,frequencymeter. KWH meter and ammetercomplete with selector switch, motor protection relay etc to operate 03 nos. 40 H.P. motor(or suitable Capacity as per site condition and direction of engineer in charge).. b. 3 Nos. outgoing panelsfor pumping plants. Each panel of 100Amps capacity MCCB with ammeter and C.T.with selector switch, KW meter, single phasing preventer, capacitor etc to operate 03 nos. 40 H.P. motor. c. 2 No. outgoing panels for misc. work comprising of 100Amp MCCB. 322 Provision and laying of PVC armoured Power cables of requiredsizes with earthing material.for internal wiring i.e Panel to Starters and from Starters to Motors 323 Delivery pipes and specials as per details given below(or suitable size as per site condition and direction of engineer in charge) : 200 mm size individual delivery and 250 mm size common delivery with jointing material, valves, Tee, bends etc. a. 200 mm dia Detachable Joint-3 Nosb. 200 mm dia Bend- 3 Nos c. 200 X 250 mm Tee- 3 Nos d. 250 mm Reflux Valve-1 Nos.e. 250 mm dia Duckfoot Bend-1 Nos.f. 250 mm dia Common Header-15 Mg. 250 mm dia Blind Flange-1 No 324 Provision of MS Girder for pump base etc. 325 Chukkered Plate and Grills to cover the Gaps between Girder and Adjacent Pumps 326 Internal electrification of Pump House (CWR), Pannel roomand campus with Light & Fan wiring and& other Necessary works. 327 Supply of Electro menhanical type chlorinating plant 0 to 30 LPHcapacity pump set Suitable for 500 Kg./Cm2 working pressure to feedsodiumhypochloridesolutioncomplete ste, Sodium Hypochloride liquid is used in this type of chlorinator which contains 120 gms of chlorine in 1000 ml Quantity Confirming quality Manegment System Standard NS-EN ISO 9001-2000 328 H.O.T. crane of 3 Tones capacity , Lift 4.5 Mtr 329 Testing of pumps & other equipment at work site 330 Painting of equipment with two coats. 331 CE / UL certified Intelligent smart energy meter 332 Motor Operatedsluice valve with Actuator for Pumps(200mm)(or suitable size as per site condition and direction of engineer in charge) 333 Motor Operatedsluice valve with Actuator for Common Header (250mm)(or suitable size as per site condition and direction of engineer in charge) 334 Electromagneticflowmeter of size: 250mm for common header(or suitable size as per site condition and direction of engineer in charge) 335 Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (160 Amps) 336 CE / UL certifiedRadar type Level Transmitter for CWR 337 CE / UL certifiedSmart Pressure Transmitter 338 CE / UL certified Surge protector for control panel 339 CE / UL certified 7" HMI touchscreen suitable to communicate with PLC/RTU, for local display & control of process parameters 340 Complete Cabling for ZPS including all power & control cable of all equipments at ZPS and OHT 341 Control panel with IP 54 protection, industrial grade fro all equipments (separate for control (24V) and power equipments. 342 Installation, commissioning & testing 343 Pumping Plant & Instrumentation Of CWR Zone 3 344 V.T. Pump- Motor Set 345 1900 LPM 40M head Clear Water 1450 RPM,surfacedischarge,self water lubricated, Bottom Suction with150 mm dia & 6 M long column Assembly ( Column Pipeshaft & Rubber spider) Discharge head, Top shaft, rachet to prevent reverse rotation, suitable to couple with 3 phase 4 Pole, Vertical hollow shaft1450 RPM squirrel cage 400 V±10% 50 Hz, AC, Motor etc. (or suitable head, H.P, RPM of pump motor & size & length of coloumn pipes as per site condition and direction of engineer in charge) 346 Starter 347 Provision of Digital Soft Starter to operate Upto 35 HP motor(or suitable Capacity as per site condition and direction of engineer in charge)at 0.4KV +10%3phase,50Hz. A.C. and to control the above motors. It shall comprise of all protection devicesas per latest I.S.S. specifications. 348 L.T. Switchgear Panel Board 349 Provision of 1 no. panelextensible typeswitchboard suitable for 0.4 KV3 phase 50 HZ. A.C. in cubical pattern, floor mountingcompletewith insulatedbus bars of suitable size forrequiredload. The switch board shall consist of the following : a. Oneno.Incoming Panelcomprisingof100AmpsMCCB indoor vertical isolation horizontally drawouttype withrelays as per ISS.Panelwill be comprisingof voltmeterwith selector switch, power factor meter,frequencymeter. KWH meter and ammetercomplete with selector switch, motor protection relay etc to operate 03 nos. 35 H.P. motor(or suitable Capacity as per site condition and direction of engineer in charge). . b. 3 Nos. outgoing panelsfor pumping plants. Each panel of 100Amps capacity MCCB with ammeter and C.T.with selector switch, KW meter, single phasing preventer, capacitor etc to operate 03 nos. 35 H.P. motor. c. 2 No. outgoing panels for misc. work comprising of 100Amp MCCB. 350 Provision and laying of PVC armoured Power cables of requiredsizes with earthing material.for internal wiring i.e Panel to Starters and from Starters to Motors 351 Delivery pipes and specials as per details given below(or suitable size as per site condition and direction of engineer in charge) : 150 mm size individual delivery and 250 mm size common delivery with jointing material, valves, Tee, bends etc. a. 150 mm dia Detachable Joint-3 Nosb. 150 mm dia Bend- 3 Nosc. 150 X 250 mm Tee- 3 Nos d. 250 mm Reflux Valve-1 Nos. e. 250 mm dia Duckfoot Bend-1 Nos. f. 250 mm dia Common Header-15 Mg. 250 mm dia Blind Flange-1 No 352 Provision of MS Girder for pump base etc. 353 Chukkered Plate and Grills to cover the Gaps between Girder and Adjacent Pumps 354 Internal electrification of Pump House (CWR), Pannel roomand campus with Light & Fan wiring and& other Necessary works. 355 Supply of Electro menhanical type chlorinating plant 0 to 30 LPHcapacity pump set Suitable for 500 Kg./Cm2 working pressure to feedsodiumhypochloridesolutioncomplete ste, Sodium Hypochloride liquid is used in this type of chlorinator which contains 120 gms of chlorine in 1000 ml Quantity Confirming quality Manegment System Standard NS-EN ISO 9001-2000 356 H.O.T. crane of 3 Tones capacity , Lift 4.5 Mtr 357 Testing of pumps & other equipment at work site 358 Painting of equipment with two coats. 359 CE / UL certified Intelligent smart energy meter 360 Motor Operatedsluice valve with Actuator for Pumps(150mm) (or suitable size as per site condition and direction of engineer in charge) 361 Motor Operatedsluice valve with Actuator for Common Header (250mm) (or suitable size as per site condition and direction of engineer in charge) 362 Electromagneticflowmeter of size: 250mm for common header (or suitable size as per site condition and direction of engineer in charge) 363 Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (160 Amps) 364 CE / UL certifiedRadar type Level Transmitter for CWR 365 CE / UL certifiedSmart Pressure Transmitter 366 CE / UL certified Surge protector for control panel 367 CE / UL certified 7" HMI touchscreen suitable to communicate with PLC/RTU, for local display & control of process parameters 368 Complete Cabling for ZPS including all power & control cable of all equipments at ZPS and OHT 369 Control panel with IP 54 protection, industrial grade fro all equipments (separate for control (24V) and power equipments. 370 Installation, commissioning & testing 371 Pumping Plant & Instrumentation Of CWR Zone 4 372 V.T. Pump- Motor Set 373 2200 LPM 40M head Clear Water 1450 RPM, surfacedischarge,self water lubricated, Bottom Suction with 200 mm dia size 6 M long column Assembly ( Column Pipeshaft & Rubber spider) Discharge head, Top shaft, rachet to prevent reverse rotation, suitable to couple with 3 phase 4 Pole, Vertical hollow shaft1450 RPM squirrel cage 400 V±10% 50 Hz, AC, Motor etc. (or suitable head, H.P, RPM of pump motor & size & length of coloumn pipes as per site condition and direction of engineer in charge) 374 Starter 375 Provision of Digital Soft Starter to operate Upto 35 HP motor(or suitable Capacity as per site condition and direction of engineer in charge) at 0.4KV +10%3phase,50Hz. A.C. and to control the above motors. It shall comprise of all protection devicesas per latest I.S.S. specifications. 376 L.T. Switchgear Panel Board 377 Provision of 1 no. panelextensible typeswitchboard suitable for 0.4 KV3 phase 50 HZ. A.C. in cubical pattern, floor mountingcompletewith insulatedbus bars of suitable size forrequiredload. The switch board shall consist of the following : a. Oneno.Incoming Panelcomprisingof100AmpsMCCB indoor vertical isolation horizontally drawouttype withrelays as per ISS.Panelwill be comprisingof voltmeterwith selector switch, power factor meter,frequencymeter. KWH meter and ammetercomplete with selector switch, motor protection relay etc to operate 03 nos. 35 H.P. motor(or suitable Capacity as per site condition and direction of engineer in charge).b. 3 Nos. outgoing panelsfor pumping plants. Each panel of 100Amps capacity MCCB with ammeter and C.T.with selector switch, KW meter, single phasing preventer, capacitor etc to operate 03 nos. 35 H.P. motor. c. 2 No. outgoing panels for misc. work comprising of 100Amp MCCB. 378 Provision and laying of PVC armoured Power cables of requiredsizes with earthing material.for internal wiring i.e Panel to Starters and from Starters to Motors 379 Delivery pipes and specials as per details given below(or suitable size as per site condition and direction of engineer in charge) : 200 mm size individual delivery and 250 mm size common delivery with jointing material, valves, Tee, bends etc. a. 200 mm dia Detachable Joint-3 Nosb. 200 mm dia Bend- 3 Nos c. 200 X 250 mm Tee- 3 Nos d. 250 mm Reflux Valve-1 Nos.e. 250 mm dia Duckfoot Bend-1 Nos.f. 250 mm dia Common Header-15 Mg. 250 mm dia Blind Flange-1 No 380 Provision of MS Girder for pump base etc. 381 Chukkered Plate and Grills to cover the Gaps between Girder and Adjacent Pumps 382 Internal electrification of Pump House (CWR), Pannel roomand campus with Light & Fan wiring and& other Necessary works. 383 Supply of Electro menhanical type chlorinating plant 0 to 30 LPHcapacity pump set Suitable for 500 Kg./Cm2 working pressure to feedsodiumhypochloridesolutioncomplete ste, Sodium Hypochloride liquid is used in this type of chlorinator which contains 120 gms of chlorine in 1000 ml Quantity Confirming quality Manegment System Standard NS-EN ISO 9001-2000 384 H.O.T. crane of 3 Tones capacity , Lift 4.5 Mtr 385 Testing of pumps & other equipment at work site 386 Painting of equipment with two coats. 387 CE / UL certified Intelligent smart energy meter 388 Motor Operatedsluice valve with Actuator for Pumps(200mm)(or suitable size as per site condition and direction of engineer in charge) 389 Motor Operatedsluice valve with Actuator for Common Header (250mm)(or suitable size as per site condition and direction of engineer in charge) 390 Electromagneticflowmeter of size: 250mm for common header(or suitable size as per site condition and direction of engineer in charge) 391 Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (160 Amps) 392 CE / UL certifiedRadar type Level Transmitter for CWR 393 CE / UL certifiedSmart Pressure Transmitter 394 CE / UL certified Surge protector for control panel 395 CE / UL certified 7" HMI touchscreen suitable to communicate with PLC/RTU, for local display & control of process parameters 396 Complete Cabling for ZPS including all power & control cable of all equipments at ZPS and OHT 397 Control panel with IP 54 protection, industrial grade fro all equipments (separate for control (24V) and power equipments. 398 Installation, commissioning & testing 399 Pumping Plant & Instrumentation Of CWR Zone 7 400 V.T. Pump- Motor Set 401 1500 LPM 40M head Clear Water 1450 RPM,surfacedischarge,self water lubricated, Bottom Suction with150 mm dia & 6 M long column Assembly ( Column Pipeshaft & Rubber spider) Discharge head, Top shaft, rachet to prevent reverse rotation, suitable to couple with 3 phase 4 Pole, Vertical hollow shaft1450 RPM squirrel cage 400 V±10% 50 Hz, AC, Motor etc. (or suitable head, H.P, RPM of pump motor & size & length of coloumn pipes as per site condition and direction of engineer in charge) 402 Starter 403 Provision of Digital Soft Starter to operate Upto 35 HP motor at 0.4KV +10%3phase,50Hz. A.C. and to control the above motors. It shall comprise of all protection devicesas per latest I.S.S. specifications. 404 L.T. Switchgear Panel Board 405 Provision of 1 no. panelextensible typeswitchboard suitable for 0.4 KV3 phase 50 HZ. A.C. in cubical pattern, floor mountingcompletewith insulatedbus bars of suitable size forrequiredload. The switch board shall consist of the following : a. Oneno.Incoming Panelcomprisingof100AmpsMCCB indoor vertical isolation horizontally drawouttype withrelays as per ISS.Panelwill be comprisingof voltmeterwith selector switch, power factor meter,frequencymeter. KWH meter and ammetercomplete with selector switch, motor protection relay etc to operate 03 nos. 35 H.P. motor(or suitable Capacity as per site condition and direction of engineer in charge)..b. 3 Nos. outgoing panelsfor pumping plants. Each panel of 100Amps capacity MCCB with ammeter and C.T.with selector switch, KW meter, single phasing preventer, capacitor etc to operate 03 nos. 35 H.P. motor. c. 2 No. outgoing panels for misc. work comprising of 100Amp MCCB. 406 Provision and laying of PVC armoured Power cables of requiredsizes with earthing material.for internal wiring i.e Panel to Starters and from Starters to Motors 407 Delivery pipes and specials as per details given below(or suitable size as per site condition and direction of engineer in charge) : 150 mm size individual delivery and 250 mm size common delivery with jointing material, valves, Tee, bends etc. a. 150 mm dia Detachable Joint-3 Nosb. 150 mm dia Bend- 3 Nosc. 150 X 200 mm Tee- 3 Nos d. 200 mm Reflux Valve-1 Nos.e. 200 mm dia Duckfoot Bend-1 Nos.f. 200 mm dia Common Header-15 Mg. 200 mm dia Blind Flange-1 No 408 Provision of MS Girder for pump base etc. 409 Chukkered Plate and Grills to cover the Gaps between Girder and Adjacent Pumps 410 Internal electrification of Pump House (CWR), Pannel roomand campus with Light & Fan wiring and& other Necessary works. 411 Supply of Electro menhanical type chlorinating plant 0 to 30 LPHcapacity pump set Suitable for 500 Kg./Cm2 working pressure to feedsodiumhypochloridesolutioncomplete ste, Sodium Hypochloride liquid is used in this type of chlorinator which contains 120 gms of chlorine in 1000 ml Quantity Confirming quality Manegment System Standard NS-EN ISO 9001-2000 412 H.O.T. crane of 3 Tones capacity , Lift 4.5 Mtr 413 Testing of pumps & other equipment at work site 414 Painting of equipment with two coats. 415 CE / UL certified Intelligent smart energy meter 416 Motor Operatedsluice valve with Actuator for Pumps(150mm)(or suitable size as per site condition and direction of engineer in charge) 417 Motor Operatedsluice valve with Actuator for Common Header (200mm)(or suitable size as per site condition and direction of engineer in charge) 418 Electromagneticflowmeter of size: 200mm for common header(or suitable size as per site condition and direction of engineer in charge) 419 Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (100 Amps) 420 CE / UL certifiedRadar type Level Transmitter for CWR 421 CE / UL certifiedSmart Pressure Transmitter 422 CE / UL certified Surge protector for control panel 423 CE / UL certified 7" HMI touchscreen suitable to communicate with PLC/RTU, for local display & control of process parameters 424 Complete Cabling for ZPS including all power & control cable of all equipments at ZPS and OHT 425 Control panel with IP 54 protection, industrial grade fro all equipments (separate for control (24V) and power equipments. 426 Installation, commissioning & testing 427 Pumping Plant & Instrumentation Of CWR Zone 8 428 V.T. Pump- Motor Set 429 2500 LPM 40M head Clear Water 1450 RPM, surfacedischarge,self water lubricated, Bottom Suction with 200 mm dia size 6 M long column Assembly ( Column Pipeshaft & Rubber spider) Discharge head, Top shaft, rachet to prevent reverse rotation, suitable to couple with 3 phase 4 Pole, Vertical hollow shaft1450 RPM squirrel cage 400 V±10% 50 Hz, AC, Motor etc. (or suitable head, H.P, RPM of pump motor & size & length of coloumn pipes as per site condition and direction of engineer in charge) 430 Starter 431 Provision of Digital Soft Starter to operate Upto 40 HP motor(or suitable Capacity as per site condition and direction of engineer in charge) at 0.4KV +10%3phase,50Hz. A.C. and to control the above motors. It shall comprise of all protection devicesas per latest I.S.S. specifications. 432 L.T. Switchgear Panel Board 433 Provision of 1 no. panelextensible typeswitchboard suitable for 0.4 KV3 phase 50 HZ. A.C. in cubical pattern, floor mountingcompletewith insulatedbus bars of suitable size forrequiredload. The switch board shall consist of the following : a. Oneno.Incoming Panelcomprisingof100AmpsMCCB indoor vertical isolation horizontally drawouttype withrelays as per ISS.Panelwill be comprisingof voltmeterwith selector switch, power factor meter,frequencymeter. KWH meter and ammetercomplete with selector switch, motor protection relay etc to operate 03 nos. 40 H.P. motor(or suitable Capacity as per site condition and direction of engineer in charge)..b. 3 Nos. outgoing panelsfor pumping plants. Each panel of 100Amps capacity MCCB with ammeter and C.T.with selector switch, KW meter, single phasing preventer, capacitor etc to operate 03 nos. 40 H.P. motor. c. 2 No. outgoing panels for misc. work comprising of 100Amp MCCB. 434 Provision and laying of PVC armoured Power cables of requiredsizes with earthing material.for internal wiring i.e Panel to Starters and from Starters to Motors 435 Delivery pipes and specials as per details given below(or suitable size as per site condition and direction of engineer in charge) : 200 mm size individual delivery and 250 mm size common delivery with jointing material, valves, Tee, bends etc. a. 200 mm dia Detachable Joint-3 Nosb. 200 mm dia Bend- 3 Nos c. 200 X 250 mm Tee- 3 Nos d. 250 mm Reflux Valve-1 Nos.e. 250 mm dia Duckfoot Bend-1 Nos.f. 250 mm dia Common Header-15 Mg. 250 mm dia Blind Flange-1 No 436 Provision of MS Girder for pump base etc. 437 Chukkered Plate and Grills to cover the Gaps between Girder and Adjacent Pumps 438 Internal electrification of Pump House (CWR), Pannel roomand campus with Light & Fan wiring and& other Necessary works. 439 Supply of Electro menhanical type chlorinating plant 0 to 30 LPHcapacity pump set Suitable for 500 Kg./Cm2 working pressure to feedsodiumhypochloridesolutioncomplete ste, Sodium Hypochloride liquid is used in this type of chlorinator which contains 120 gms of chlorine in 1000 ml Quantity Confirming quality Manegment System Standard NS-EN ISO 9001-2000 440 H.O.T. crane of 3 Tones capacity , Lift 4.5 Mtr 441 Testing of pumps & other equipment at work site 442 Painting of equipment with two coats. 443 CE / UL certified Intelligent smart energy meter 444 Motor Operatedsluice valve with Actuator for Pumps(200mm)(or suitable size as per site condition and direction of engineer in charge) 445 Motor Operatedsluice valve with Actuator for Common Header (250mm)(or suitable size as per site condition and direction of engineer in charge) 446 Electromagneticflowmeter of size: 250mm for common header(or suitable size as per site condition and direction of engineer in charge) 447 Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (160 Amps) 448 CE / UL certifiedRadar type Level Transmitter for CWR 449 CE / UL certifiedSmart Pressure Transmitter 450 CE / UL certified Surge protector for control panel 451 CE / UL certified 7" HMI touchscreen suitable to communicate with PLC/RTU, for local display & control of process parameters 452 Complete Cabling for ZPS including all power & control cable of all equipments at ZPS and OHT 453 Control panel with IP 54 protection, industrial grade fro all equipments (separate for control (24V) and power equipments. 454 Installation, commissioning & testing 455 Pumping Plant & Instrumentation Of CWRZone 10 456 V.T. Pump- Motor Set 457 2400 LPM 40M head Clear Water 1450 RPM, surfacedischarge,self water lubricated, Bottom Suction with 200 mm dia size 6 M long column Assembly ( Column Pipeshaft & Rubber spider) Discharge head, Top shaft, rachet to prevent reverse rotation, suitable to couple with 3 phase 4 Pole, Vertical hollow shaft1450 RPM squirrel cage 400 V±10% 50 Hz, AC, Motor etc. (or suitable head, H.P, RPM of pump motor & size & length of coloumn pipes as per site condition and direction of engineer in charge) 458 Starter 459 Provision of Digital Soft Starter to operate Upto 40 HP motor(or suitable Capacity as per site condition and direction of engineer in charge) at 0.4KV +10%3phase,50Hz. A.C. and to control the above motors. It shall comprise of all protection devicesas per latest I.S.S. specifications. 460 L.T. Switchgear Panel Board 461 Provision of 1 no. panelextensible typeswitchboard suitable for 0.4 KV3 phase 50 HZ. A.C. in cubical pattern, floor mountingcompletewith insulatedbus bars of suitable size forrequiredload. The switch board shall consist of the following : a. Oneno.Incoming Panelcomprisingof100AmpsMCCB indoor vertical isolation horizontally drawouttype withrelays as per ISS.Panelwill be comprisingof voltmeterwith selector switch, power factor meter,frequencymeter. KWH meter and ammetercomplete with selector switch, motor protection relay etc to operate 03 nos. 40 H.P. motor(or suitable Capacity as per site condition and direction of engineer in charge).. b. 3 Nos. outgoing panelsfor pumping plants. Each panel of 100Amps capacity MCCB with ammeter and C.T.with selector switch, KW meter, single phasing preventer, capacitor etc to operate 03 nos. 40 H.P. motor. c. 2 No. outgoing panels for misc. work comprising of 100Amp MCCB. 462 Provision and laying of PVC armoured Power cables of requiredsizes with earthing material.for internal wiring i.e Panel to Starters and from Starters to Motors 463 Delivery pipes and specials as per details given below(or suitable size as per site condition and direction of engineer in charge) : 200 mm size individual delivery and 250 mm size common delivery with jointing material, valves, Tee, bends etc. a. 200 mm dia Detachable Joint-3 Nosb. 200 mm dia Bend- 3 Nos c. 200 X 250 mm Tee- 3 Nos d. 250 mm Reflux Valve-1 Nos.e. 250 mm dia Duckfoot Bend-1 Nos.f. 250 mm dia Common Header-15 Mg. 250 mm dia Blind Flange-1 No 464 Provision of MS Girder for pump base etc. 465 Chukkered Plate and Grills to cover the Gaps between Girder and Adjacent Pumps 466 Internal electrification of Pump House (CWR), Pannel roomand campus with Light & Fan wiring and& other Necessary works. 467 Supply of Electro menhanical type chlorinating plant 0 to 30 LPHcapacity pump set Suitable for 500 Kg./Cm2 working pressure to feedsodiumhypochloridesolutioncomplete ste, Sodium Hypochloride liquid is used in this type of chlorinator which contains 120 gms of chlorine in 1000 ml Quantity Confirming quality Manegment System Standard NS-EN ISO 9001-2000 468 H.O.T. crane of 3 Tones capacity , Lift 4.5 Mtr 469 Testing of pumps & other equipment at work site 470 Painting of equipment with two coats. 471 CE / UL certified Intelligent smart energy meter 472 Motor Operatedsluice valve with Actuator for Pumps(200mm)(or suitable size as per site condition and direction of engineer in charge) 473 Motor Operatedsluice valve with Actuator for Common Header (250mm)(or suitable size as per site condition and direction of engineer in charge) 474 Electromagneticflowmeter of size: 250mm for common header(or suitable size as per site condition and direction of engineer in charge) 475 Auto phase reversal unit with inbuilt time delay & enclosure conforming to IEC: 60947-1 & IEC:60947-b-1) (160 Amps) 476 CE / UL certifiedRadar type Level Transmitter for CWR 477 CE / UL certifiedSmart Pressure Transmitter 478 CE / UL certified Surge protector for control panel 479 CE / UL certified 7" HMI touchscreen suitable to communicate with PLC/RTU, for local display & control of process parameters 480 Complete Cabling for ZPS including all power & control cable of all equipments at ZPS and OHT 481 Control panel with IP 54 protection, industrial grade fro all equipments (separate for control (24V) and power equipments. 482 Installation, commissioning & testing 483 Automation of CWR For All ZONEs 484 CE & UL approved manufacturer’s RTU/ PLC in IP 54 encloser suitable to communicate with GSM based modem unit with CPU and power supply with analog and digital parameter and features as specified, onefor each tubewellto store and transmit data on GSM backbone. RTU/PLC designed with logic to transfer data at multiple stations. G.S.M./G.P.R.S. based wireless communication with 4G Modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations, all accessories included with signal enhancer anteena made for pumping plant 485 Automation of All Zone OHT 486 Automation of existing/new OHT & associated infrastructure as per actual site requirement like existing/new Tubewells related valves, pressure transmitters,level sensors, chlorination system, OHT outlet flowmeter, OHT outlet acutator valves with positioning card,required RTU panel, control & power wiring, earthing including SITC /repairing of already existing equipments (in case of existing OHT)complete in all respect in a way to complete automation as per CPHEEO drink from tap mannual further associated guidelines. 487 DMA /ESR Automation for Zone-1 488 Survey, design asset mapping, SITC of following equipments along with other requied infrastucture/equipments as per requirements and guidelines of 24x7 water supply requirements. The job includes SITC of all required software and hardwares not mentioned elsewhere & min. 8 hrs battery backup.. 489 Double Solenoid Flow Control Valve 350 mm Dia 490 Pressure Transmitter 491 Mannual Pressure Transmitter 492 CE / UL certified Electromagnetic flowmeter of size 350 mm Dia 493 SCADA Compatible Chlorinating Plant 494 Design, SITC of Booster pumps asper 24 x 7 water supply requirements with 50% standby of peak water demand along with main piping and actuator valves and bypass arrangement,extra pressure transmiiter, VFD drive, PLC panel, TDS analyser, power and control wiring complete in all respect considering all DMAs 495 Resedual Chlorine Analyser 496 DMA /ESR Automation for Zone-2 497 Survey, design asset mapping, SITC of following equipments along with other requied infrastucture/equipments as per requirements and guidelines of 24x7 water supply requirements. The job includes SITC of all required software and hardwares not mentioned elsewhere & min. 8 hrs battery backup.. 498 Double Solenoid Flow Control Valve 250 mm 499 Double Solenoid Flow Control Valve 300 mm 500 Pressure Transmitter 501 Mannual Pressure Transmitter 502 CE / UL certified Electromagnetic flowmeter of size250 mm Dia 503 Design, SITC of Booster pumps asper 24 x 7 water supply requirements with 50% standby of peak water demand along with main piping and actuator valves and bypass arrangement,extra pressure transmiiter, VFD drive, PLC panel, TDS analyser, power and control wiring complete in all respect considering all DMAs 504 CE / UL certified Electromagnetic flowmeter of size 300 mm Dia 505 SCADA Compatible Chlorinating Plant 506 Resedual Chlorine Analyser 507 DMA /ESR Automation for Zone-3 508 Survey, design asset mapping, SITC of following equipments along with other requied infrastucture/equipments as per requirements and guidelines of 24x7 water supply requirements. The job includes SITC of all required software and hardwares not mentioned elsewhere & min. 8 hrs battery backup.. 509 Double Solenoid Flow Control Valve350 mm Dia 510 Pressure Transmitter 511 Mannual Pressure Transmitter 512 CE / UL certified Electromagnetic flowmeter of size 350 mm Dia 513 Design, SITC of Booster pumps asper 24 x 7 water supply requirements with 50% standby of peak water demand along with main piping and actuator valves and bypass arrangement,extra pressure transmiiter, VFD drive, PLC panel, TDS analyser, power and control wiring complete in all respect considering all DMAs 514 SCADA Compatible Chlorinating Plant 515 Resedual Chlorine Analyser 516 DMA /ESR Automation for Zone-4 517 Survey, design asset mapping, SITC of following equipments along with other requied infrastucture/equipments as per requirements and guidelines of 24x7 water supply requirements. The job includes SITC of all required software and hardwares not mentioned elsewhere & min. 8 hrs battery backup.. 518 Double Solenoid Flow Control Valve 200 mm dia 519 Double Solenoid Flow Control Valve 300 mm dia 520 Pressure Transmitter 521 Mannual Pressure Transmitter 522 CE / UL certified Electromagnetic flowmeter of size200 mm dia 523 Design, SITC of Booster pumps asper 24 x 7 water supply requirements with 50% standby of peak water demand along with main piping and actuator valves and bypass arrangement,extra pressure transmiiter, VFD drive, PLC panel, TDS analyser, power and control wiring complete in all respect considering all DMAs 524 CE / UL certified Electromagnetic flowmeter of size300 mm dia 525 SCADA Compatible Chlorinating Plant 526 Resedual Chlorine Analyser 527 DMA /ESR Automation for Zone-5 528 Survey, design asset mapping, SITC of following equipments along with other requied infrastucture/equipments as per requirements and guidelines of 24x7 water supply requirements. The job includes SITC of all required software and hardwares not mentioned elsewhere & min. 8 hrs battery backup.. 529 Double Solenoid Flow Control Valve 350 mm dia 530 Pressure Transmitter 531 Mannual Pressure Transmitter 532 CE / UL certified Electromagnetic flowmeter of size 350 mm dia 533 SCADA Compatible Chlorinating Plant 534 Resedual Chlorine Analyser 535 DMA /ESR Automation for Zone-6 536 Survey, design asset mapping, SITC of following equipments along with other requied infrastucture/equipments as per requirements and guidelines of 24x7 water supply requirements. The job includes SITC of all required software and hardwares not mentioned elsewhere & min. 8 hrs battery backup.. 537 Double Solenoid Flow Control Valve350 mm dia 538 Pressure Transmitter 539 Mannual Pressure Transmitter 540 CE / UL certified Electromagnetic flowmeter of size 350 mm dia 541 SCADA Compatible Chlorinating Plant 542 Resedual Chlorine Analyser 543 DMA /ESR Automation for Zone-7 544 Survey, design asset mapping, SITC of following equipments along with other requied infrastucture/equipments as per requirements and guidelines of 24x7 water supply requirements. The job includes SITC of all required software and hardwares not mentioned elsewhere & min. 8 hrs battery backup.. 545 Double Solenoid Flow Control Valve 546 Pressure Transmitter 547 Mannual Pressure Transmitter 548 CE / UL certified Electromagnetic flowmeter of size 549 Design, SITC of Booster pumps asper 24 x 7 water supply requirements with 50% standby of peak water demand along with main piping and actuator valves and bypass arrangement,extra pressure transmiiter, VFD drive, PLC panel, TDS analyser, power and control wiring complete in all respect considering all DMAs 550 SCADA Compatible Chlorinating Plant 551 Resedual Chlorine Analyser 552 DMA /ESR Automation for Zone-8 553 Survey, design asset mapping, SITC of following equipments along with other requied infrastucture/equipments as per requirements and guidelines of 24x7 water supply requirements. The job includes SITC of all required software and hardwares not mentioned elsewhere & min. 8 hrs battery backup.. 554 Double Solenoid Flow Control Valve250 mm dia 555 Double Solenoid Flow Control Valve300 mm dia 556 Pressure Transmitter 557 Mannual Pressure Transmitter 558 CE / UL certified Electromagnetic flowmeter of size 250mm dia 559 CE / UL certified Electromagnetic flowmeter of size 300mm dia 560 SCADA Compatible Chlorinating Plant 561 Resedual Chlorine Analyser 562 DMA /ESR Automation for Zone-9 563 Survey, design asset mapping, SITC of following equipments along with other requied infrastucture/equipments as per requirements and guidelines of 24x7 water supply requirements. The job includes SITC of all required software and hardwares not mentioned elsewhere & min. 8 hrs battery backup.. 564 Double Solenoid Flow Control Valve300 mm 565 Pressure Transmitter 566 Mannual Pressure Transmitter 567 CE / UL certified Electromagnetic flowmeter of size 300 mm 568 Design, SITC of Booster pumps asper 24 x 7 water supply requirements with 50% standby of peak water demand along with main piping and actuator valves and bypass arrangement,extra pressure transmiiter, VFD drive, PLC panel, TDS analyser, power and control wiring complete in all respect considering all DMAs 569 SCADA Compatible Chlorinating Plant 570 Resedual Chlorine Analyser 571 DMA /ESR Automation for Zone-10 572 Survey, design asset mapping, SITC of following equipments along with other requied infrastucture/equipments as per requirements and guidelines of 24x7 water supply requirements. The job includes SITC of all required software and hardwares not mentioned elsewhere & min. 8 hrs battery backup.. 573 Double Solenoid Flow Control Valve 200 mm dia 574 Double Solenoid Flow Control Valve 300 mm dia 575 Pressure Transmitter 576 Mannual Pressure Transmitter 577 CE / UL certified Electromagnetic flowmeter of size 200 mm dia 578 CE / UL certified Electromagnetic flowmeter of size 300 mm dia 579 SCADA Compatible Chlorinating Plant 580 Resedual Chlorine Analyser 581 DMA /ESR Automation for Zone-11 582 Survey, design asset mapping, SITC of following equipments along with other requied infrastucture/equipments as per requirements and guidelines of 24x7 water supply requirements. The job includes SITC of all required software and hardwares not mentioned elsewhere & min. 8 hrs battery backup.. 583 Double Solenoid Flow Control Valve350 mm dia 584 Pressure Transmitter 585 Mannual Pressure Transmitter 586 CE / UL certified Electromagnetic flowmeter of size350 mm dia 587 SCADA Compatible Chlorinating Plant 588 Resedual Chlorine Analyser 589 DMA /ESR Automation for Zone-12 590 Survey, design asset mapping, SITC of following equipments along with other requied infrastucture/equipments as per requirements and guidelines of 24x7 water supply requirements. The job includes SITC of all required software and hardwares not mentioned elsewhere & min. 8 hrs battery backup.. 591 Double Solenoid Flow Control Valve300 mm dia 592 Pressure Transmitter 593 Mannual Pressure Transmitter 594 Design, SITC of Booster pumps asper 24 x 7 water supply requirements with 50% standby of peak water demand along with main piping and actuator valves and bypass arrangement,extra pressure transmiiter, VFD drive, PLC panel, TDS analyser, power and control wiring complete in all respect considering all DMAs 595 CE / UL certified Electromagnetic flowmeter of size 300 mm dia 596 SCADA Compatible Chlorinating Plant 597 Resedual Chlorine Analyser 598 DMA /ESR Automation for Zone-13 599 Survey, design asset mapping, SITC of following equipments along with other requied infrastucture/equipments as per requirements and guidelines of 24x7 water supply requirements. The job includes SITC of all required software and hardwares not mentioned elsewhere & min. 8 hrs battery backup.. 600 Double Solenoid Flow Control Valve250 mm dia 601 Pressure Transmitter 602 Mannual Pressure Transmitter with Display 603 CE / UL certified Electromagnetic flowmeter of size 250 mm dia 604 SCADA Compatible Chlorinating Plant 605 Resedual Chlorine Analyser 606 DMA /ESR Automation for Zone-14 607 Survey, design asset mapping, SITC of following equipments along with other requied infrastucture/equipments as per requirements and guidelines of 24x7 water supply requirements. The job includes SITC of all required software and hardwares not mentioned elsewhere & min. 8 hrs battery backup.. 608 Double Solenoid Flow Control Valve250 mm dia 609 Pressure Transmitter 610 Mannual Pressure Transmitter with Display 611 CE / UL certified Electromagnetic flowmeter of size 250 mm dia 612 SCADA Compatible Chlorinating Plant 613 Resedual Chlorine Analyser 614 SITC of SCADA MCS 615 SITC of MCS SCADAfor each DMA of all Zones including TWs, CWR, ESR/OHT complete in all respect. (or as per site condition and direction of engineer in charge or as per CPHEEO manual Drink from Tap Dec.2024) 616 Sub Station OfCWR Zone 617 Design & SITC of electric substation for CWR including 02 Nos.(01 Working+01 Standby) Transformer, 11 KV HT swicthgear panel with 01 No incoming and 02 Nos. outgoing VCB alongwith LT control panel having sufficient No of ACB/MCCB of suitable size for actual site equipment reqiremwnts with electrical interlocks and complete power and control cabling works, APFC, earthing, lighting arrester, TPMO Switch, safety SITCs barbed wire, H-Pole, foundation/plinth, lighting, Rubber mating, internal, external electrification, laisioning from Discom, NOC from electrical safety department,testing & commisioning complete in all respect with all labour material & T&Ps having capacity 100KVA/160KVA, 11/0.415 KV 618 Trail & Run 619 Three Months Trial & Run OfTubewell & SCADA with all consumable items 620 Three Months Trial & Run OfCWR with all consumable items
|