Bridge over Csenk stream 45000000-7 Bridge to be built: The bridge is suitable for both bicycle and pedestrian traffic. The construction of the bridge is intended to ensure uninterrupted traffic on the bike path. Its connection is aligned with the planned bicycle path on both banks. The traffic width of the cycle path is 2.50m + 2 *0.75m benches. The free track width between the bridge barriers: 3.00m. The planned bridge rests on reinforced concrete abutments, has steel girders, and has a hardwood walking surface. The location of the bridge: over the Csenk stream, its 7+863 km. section, it will be in the 2+870 km section of the planned bicycle path. Crossing angle: 68 to the left. The bridge descends over the forest from property number 091 towards Telkib nya, Pet fi S ndor t (main road 3708). The bridge has a longitudinal gradient of 0.72%, which is also the longitudinal gradient of the bicycle path. There is no transverse fall. The horizontal data of the bridge, adapted to the bicycle path, were given in the EOV system. Its height is also adapted to the cycle path, 227.90m above Balti, which connects at the end point of 2+933.78m. The low-water part of the riverbed: 3.00 m wide, with a slope of 10/1. The width of the riverbed: 6/4 . The bridges superstructure length : 12.00m . m Before and after the bridge, there is a 10-10m long solid bed cover. The 30 cm vtg. a covering made of frost-resistant natural stone laid in concrete, both ends of which end with a 0.40m*0.80m concrete sealing tooth. Track layout: Planned track width: 3.00m
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 58114327
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.