Conversion And Extension Of The Ara Buchs, Earthworks And Construction Work As Part Of This Project, The Second Stage Of Extension Of The Buchs Wwtp Will Be Carried Out. In This Expansion Phase, The Increase In Biological Capacity And Value Preservation Measures Will Be Implemented. As Part Of This Capacity Increase, A New Aeration Tank, A Secondary Settling Tank, A Second Return Sludge Pumping Station, A Low Voltage Room, A Sand Washer, A Fresh Sludge Collector, A New Waste Water And A New Dumpster Room Will Be Built. With The Exception Of The Dumpster Room, Which Has A Floor On The Surface, All The Other Works Are In The Basement. The Construction Of The New Structures Is Designed As A Massive Construction. For The New Secondary Settling Basin 3, The Round Outer Walls Of The Tank Are Prestressed, Otherwise All Structures Are Loosely Reinforced. As Most Of The Works Are Under The Ground, No Special Stabilization Measures Are Necessary, But The Works Are Designed As White Basins. The Excavation Will Be Carried Out With A Free Embankment Or A Filtering Concrete Cover. The Lowering Of The Water Table Is Carried Out By An Open Dewatering System With A Settling Lake.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 53649876
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.