Modification Of A Contract/Concession During Its Term: V030.09 Székesfehérvár Railway Node Support And Telecommunications Work Installation Of Traffic Guidance Equipment Short Description: The Present Investment Includes Székesfehérvár Railway Signaling And Communication Node Works Is By Performing Other Tasks Associated With Direct Azepin Works. The Objective Investment Will Be Implemented In Parallel With Track And Artworks. The Jobs To Be Carried Out Under The Treaty Shall Contain In Detail The Chapters Of The Technical Specifications (Volume Of Bidding Documentation), Here Is Only A Brief Summary Of The Work Of The Entrepreneurship Task, Which Are As Follows: - Installing A New Electronic Safety Device At Székesfehérvár Station, Included Székesfehérvár-Crane Székesfehérvár - Moha Stations New Axle Counter-Control And Train Control For Excluding Exclusion Device (Electrical Adjusted Gearbox: 89 Pcs (84 Pieces Of Székesfehérvár Station), Indicator: 66 Pcs, Shear Indicator: 55 Pcs, Axle Counting Points 207 Pcs, Stationary Line Equipment: 6Pcs, Etcs Level2 Equipment: 1 Pcs), - Conversion Of A Mechanical Safety Device For A Hike Station (21 Gearboxes), - The Design Work Of All Facilities (Depending On The Specializations For Licensing, Pre- And Export Plans For Licensing, Professional Authorities, Submitting And Submitting Their Certificates, Compilation And Compilation Of Realization And Operation Documentation), - Jobs Related To Commissioning Of Facilities, - Establish An Adapter Interface For Controlling The Appropriate Level Of Etcs. In The Framework Of This Tender, Demolition And Construction Work Outside The Boundaries Of The Track Construction Must Also Be Carried Out: - The Airport, Complete Breakdown Of Current On-Site Objects Of The Kszg Branch, - The Full Breakdown Of The Open-Line Equipment (At694 / 95, As694, As702, As15) And The Frequency Of The At712 / 13 Spacing Equipment Currently Covering The Airport Branch, - Makeover Of A D70v Type Relay Dependency For Free Bars (34 Centralized Gearboxes / Saru), - All The External Object (Light And Barrier Markers, Switching And Semi-Engines, Etc.) For The Final Safety Device Within The Scope Of The New Equipment, - Establishing A Cable Network In A Substructure And Land Prices, In The Planned Places Substructures In The Population Tube Version (Cable Cabinet: 108 Pcs), - Cable To The Management And Feedback Of Lovasberényi And The Mohai Line Line Barriers Will Be Reconstructed And The Current Cables Must Be Rotated Into The New Equipment. Property Protection: - Surveying Systems: There Are Three Special System Systems For A Surveillance System For A Security Target Monitoring System. - Railway Property Camera Monitoring System - Police Security Camera Monitoring System - P R Parking Property Camera Monitoring System - Burglary Indicator Systems: On The Székesfehérvár Railway Junction, Traffic And Technical Rooms Must Be Equipped With Access Control And Burglary Equipment. There Is A Need For A Panic Button And A Separate Access Control System Into The Cashiers. Access Control System For The Protection Of The Traffic Office On The First Floor Of The Recruitment Building Is Required To Establish An Access Control System Independently From Acidental Property Protection Systems. Modernization Of The Székesfehérvár Railway Node Affects The Following Telecommunication Cables, Equipment And Systems: - Székesfehérvár Station Is Lines And Local And Local And Lines Of Light-Fiber Network . - Szekesfehervar - Szekesfehervar Airport Mh And Szekesfehervar - Moss Contexts New Vonalitechnológiai Lightguide Fiber Cable Networks (The Station And The Viewer Directions Lightguide Fiber Overhead Cable Construction: 1020 M, The Light Guide Fiber Behúzó- / Or Overhead Cable (Optical Cord) Construction: 18325 M, Ac It Has Been Invested In Accordance With The Requirements Of The Electric Traction Railway Track Type Of Buyer: Body Governed By Public Law Type Of Contract: Works Type Of Procedure: Open Procedure Regulation: European Union, With Participation By Gpa Countries Type Of Bid: Not Applicable Award Criteria: Not Applicable [Disclaimer: The Above Text Is Machine Translated. For Accurate Information Kindly Refer The Original Document.]
|