Quotation Are Invited For Replace Ac Units Modify Supply Replacement Of Package Ac Units Condenser Coils At Umm Ramool Chc A Scope Of Works Modify Supply And Replac Ement Of Existing Package Ac Units 3 Nos Condenser Coil Both Circuits With Necessary Modification Of Gas Pipes Freon To Replac E Same As Existing Contractor Shall Visit The Site And Take Necessary Measurement And Connections As Per Existing Conditions Ex Actly Same Contractor To Recover Gas From The System Remove The Existing Condenser Coil And Install New Coil With Necessary M Odification Of Gas Pipes Contractor To Carry Out Leak Testing With Nitrogen Gas Contractor To Hold The Pressure For 24 Hours T O Confirm Contractor To Proper Flushing Of The Coils And Proper Connections With The Leak Test Contractor To Replace Filter Dr Ier Core Same As Existing Contractor To Vacuum The System From Moisture Contractor To Supply And Charge The Freon Gas As Per Site Requirement Contractor To Paint The Condenser Coil With Heresite Anti Corrosive Coating The Job Execution Shall Be Carrie D Out In The Timing Assigned By The Dewa Engineer Submit All Materials And Brands For Approval The Contractor Is Required To Ta Ke All Precaution So As Not Damage Any Of The Existing Equipment Structure Etc Contractor Staff Is Required To Wear Proper Perso Nal Productive Equipment At All Times Inside The Premises And Shall Take All Fire Precaution While Carrying Out The Work Of Brazing Etc Welding And Fabrication At Site Only Contractor To Bring All Welding Sets Cylinders Tools And All Required Materials Cran E Lift And Hooks To Finish The Work In During One Month Only Warranty For The Condenser Coil And Heresite Anti Corrosive Coating Five Years From The Day Of Testing And Completing The Works Testing Installing And Commissioning The Complete System As Per Exi Sting Site Requirements And Carrier Manufactures Recommendation The Job Execution Shall Be Carried Out In The Timing Assigned By The Dewa Engineer The Contractor Is Required To Take All Precaution So As Not Damage Any Of The Existing Equipment Structure Etc Contractor Staff Is Required To Wear Proper Personal Productive Equipment At All Times Inside The Premises All Health And Safet Y Measures Signboards Fire Blanket Fire Extinguishers Etc To Be Followed Up Strictly Contractor Has To Provide Material Submit Tal Method Statement And Schedule Of Work To The Engineer For Approval Before Carrying Out The Installation In Case Of Un Satis Factory Performance The Lpo Will Be Cancelled Giving 15 Days Notice Covid 19 Precaution Measures To Be Followed As Per Dewa Heal Th Safety Department Recommendation Until Further Notice Contact Person For Site Visit Mr Mohamed Obeid 052 6973337 04 32278 79 And Mr Mohideen 055 3810513 04 3227879 And Mr Jacob 055 4370480 B General Condition Mobilization At Site Of The Contra Ct The Contractor Is Required To Quote Lump Sum Price For The Above Mentioned Scope Of Works The Quotation Will Be Submitted As Per Dewa Specification And Survey Only Spare Parts Required To Carry Out The Rectification Activity Should Be Arranged At The Earliest In Order To Keep The Equipment Down Time To Minimum And Must Be Genuine Spares From Oem Or Oem Recommended Vendors All T He Materials In General Will Conform As Per Latest Standards And Shall Be Submitted To Dewa For Engineers Approval The Contractor Is Required To Take All Precaution So As Not Damage Any Of The Existing Equipment Structure Ete The Contractor Shall Deploy T He Skilled Technicians For Carrying Out The Works Should We Experience A Breakdown In Any Of Equipment System At Any Time Of The Day Or Night You Will Respond To Our Request With Your 24 Hours Emergency Call Out System Available 7 Days A Week Qty 3Modify Supply Replacement Of Package Ac Units Condenser Coilsat Umm Ramool Chc Standard Terms Conditions1 Prices Should Be Ddp Delivery Duty Paid At Dewa Stores 2 Quotation To Be Submitted Only In Local Currency U A E Dirhams3 Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material4 No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company And Your Participation In Dewa Tenders Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 41115698
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.