Replace Chiller With Split Heat Pump UnitsReplace Chiller With Split Heat Pump Units Run Refrigerant Piping For New Units Where The Existing Indoor Units Are Located Disconnect One Unit At A Time To Keep The Building Operational Note This Is If The Isolation Valves Are Operational Disconnect One Unit At A Time By Disconnecting The Water Piping Ducting Electrical Drains And LowVoltage Wiring Remove Old Ahu S And Set New Ahu Units In Existing Locations Reconnect New Unit To The Existing Ducting Refrigerant Piping Drains And Low Voltage Wiring To New Wifi Thermostats Set Most Of The Condensers Where The Chiller Is Located And Set The Auditoriums And Mini Split Units In ADifferent Location Due To The Refrigerant Piping Length Remove All Old Equipment For The Chilled Water System Note Excluding Removal Of Piping And Boiler Start Up And Insure Proper Operation Of New Systems All Labor Permits And Materials Included To Install New Units Note Excluded From This Proposal Is The New Electrical Circuits To The Indoor And Outdoor Units AndConcrete For The Auditoriums Unit Note This Proposal Is To Be Priced For Normal Business Hours Monday Through Friday From 7 00 Am To5 00 Pm Note Reuse If Available Existing Smoke Detectors For That Area Fire Alarm System If This Area Is NotAlready On Fire Alarm System It Is The Customer Responsibility To Contact Their Fire Alarm Vendor AndHave The Unit S Add To Their System To Meet State And Local Code The Cost For Adding ThisArea To The Customer S Fire Safety System Is Excluded From This ProposalIi Specifications 1 20 Ton Heat Pump1 7 5 Ton Heat Pump1 6 Ton Heat Pump1 5 Ton Heat Pump1 4 Ton Heat Pump1 20 Ton Air Handler1 7 5 Ton Air Handler1 6 Ton Air Handler1 5 Ton Air Handler1 4 Ton Air Handler7 Heat Strips5 Aux Drain Pans With Float Switches5 Digital Programmable Wi Fi Thermostats20 And 7 5 Ton Heat Pump Units Will Serve Zone 3 For The Main Area Zone 5 For The Auditorium Will Be Duel CircuitUnits Or Two Stages This Will Give The Library More Flexibility To Control Humidity When Those Areas Are Not At FullCapacity Zones 1 2 4 Will Be Single Stage Heat Pumps There Are Two Small Units That Serve The Foyer And CirculationArea Which Is Zone 6 7 Include In Your Proposal To Install A Two Zone Mini Split Unit That Will Cover These Two Areas The Auditorium Foyer And Circulation Areas The Outdoor Units Will Not Be Located In The Chiller Yard This Is Due To TheRefrigerant Line Length The Plan For The Auditorium Unit Is To Locate It Near The Boiler Room The Plan For The Mini Split IsTo Mount The Condenser On The Wall Near The Space It Serves On The Ash Street Side Of The Building
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 39955404
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.