Background Built Between 1930 And 1936 The United States Department Of Agriculture Usda S South Building Is Listed On The National Register Of Historic Places The Historic Preservation Zones At The Basement And The First Floor Require Restoration Most Importantly There Are Many Life Safety Issues Which Shall Be Addressed To Comply With Contemporary Building Codes Including Accessibility Guidelines Additionally There Are Environmental Hazards Which Require Abatement Modernization Of The South Building Wing 6 And 7 Will Address These Concerns Thereby Ensuring The Safety Of Usda Employees And Visitors The South Building Is Usda S Largest Office Building The South Building Encompasses Approximately 2 2 Million Gross Square Feet Occupying Two 2 City Blocks Between Independence Avenue And C Street And 12Th And 14Th Streets Sw There Are Six 6 Main Floors A Sub Basement Ground Level A Basement And An Attic The South Building Has Seven 7 Wings Connected By A North Building Section Called The Headhouse And A South Building Section Called The Tailhouse Clustered At The Ends Of Each Of The Seven 7 North South Oriented Wings Are Elevators Stairs Toilets Telecom And Electrical Closets In Between The Wings Are Six 6 Open Courtyards For Staff Parking Excepting Court 4 Which Is For Shipping And Receiving Courts 1 2 And 3 Have Enclosed Ramps Which Lead To The Sub Basement Level The Courtyards Have Side Doors Which Allow Access Into Or Egress From The Building Wings The Building Contains Special Spaces As The Main Cafeteria Above Court 2 A 478 Seat Auditorium A Tv Studio And A Training Center In Court 5 A Major Data Center At Wing 4 Basement And A Retail Zone In The Wing 3 Subbasement Approximately 33 Of The South Building Was Modernized Previously Between 1998 And 2011 The Master Plan And The Modernization Concept Plans Were Completed Circa 1995 The Previous Modernization Phases Were Implemented Through The Design Bid Build Process Wing 3 Modernization Was Completed In 2000 Wing 4 In 2003 The Headhouse Offices From Wing 3 Through 5 In 2005 Mail Operations Center At Courtyard 4 In 2006 And Wing 5 In 2011 The Design For The Tailhouse Offices From Wing 3 Through Wing 5 Was Completed In 2011 However Construction Was Not Initiated Due To Insufficient Funding The Modernization Of Wing 6 Amp 7 Will Be Solicited And Award In Accordance With Two Phase Design Build Methods Prescribed By Far 36 3 The Project Will Be Executed Through The Design Build Method Utilizing A Phased Approach Beginning With Wing 7 Followed By Wing 6 Wing 7 Design Will Commence After Contract Award It Is Anticipated That Wing 6 Design Will Not Commence Until After Both Wing 7 Design Is Completed And Construction Work Has Begun Wing 6 Design Will Be Completed Prior To Completion Of Wing 7 Construction So That Construction At Wing 6 Can Commence At That Point The Work Of The Wing 6 Amp 7 Modernization Project Includes But Is Not Limited To The Following Design Disciplines And Their Related Building Site Utility Systems 1 Civil Engineering 2 Geotechnical Engineering 3 Landscape Architecture 4 Environmental Hazmat Remediation Engineering 5 Life Safety Engineering 6 Architecture 7 Historic Preservation 8 Interior Design 9 Structural Engineering 10 Blast Amp Atfp Engineering 11 Mechanical And Hvac Engineering 12 Plumbing Engineering 13 Fire Detection And Suppression Engineering 14 Electrical Engineering 15 Information Technology Engineering 16 Telecommunications Engineering 17 Vertical Transportation Engineering 18 Sustainability 19 Commissioning General Amp Enhanced The Wing 6 And 7 Modernization Shall Be Usgbc Leed Silver Certified Per Leed V4 Ic C Commercial Interiors Contractor And Their Designers Of Record Shall Develop Their Sustainability Approach To Com
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 39906909
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.