Tenders Are Invited For Continuation Of The Investment Design And Construction Of The S 3 Nowa S l Legnica E ...
Tender Notice
TenderID
37419692
Tender Brief
Tenders Are Invited For Continuation Of The Investment Design And Construction Of The S 3 Nowa S l Legnica Expressway A 4 Task Iii From The Kazmierz w Junction To The Lubin P lnoc Junction
Modification Of A Contract Concession During Its Term Continuation Of The Investment Design And Construction Of The S 3 Nowa S l Legnica Expressway A 4 Task Iii From The Kazmierz w Junction To The Lubin P lnoc JunctionConstruction WorkShort Description The Order Includes In Particular 1 Complete Construction Expressway Approx 14 4 Km Long I E Approx 8 4 Km 2 X 2 Lanes And An Emergency Lane Approx 6 0 Km 2 X 3 Lanes And An Emergency Lane 3 Road Junctions Kazmierz w Polkowice And Lubin P lnoc Internal Roads Serving The Areas Adjacent To The Road Lane And Technological Roads 11 Objects Eng Along The S3 Road With The Target Cross Section 2 X 3 Lanes Including Viaducts 2 Road 5 Ecological Crossings 3 Over Railway Lines 1 Over A Group Of Obstacles Economic Drive Under S3 6 Viaducts Along The Serving Roads Lower Animal Crossings Ecological Crossing Over S3 For Large Animals 6 Viaducts Over The S3 Along Local Roads Culverts With Hydrological And Ecological Functions Under The Crown Of Roads And Under Slopes Utilities And Reconstruction Of Utilities Colliding With The Investment In The Field Of Lighting Networks Electricity Water Gas Heating Rainwater Drainage And Purification Devices Sanitary Sewage System Telecommunications And Telecommunication Lines Construction Of A Drainage System For The Road Body Of The S3 Road And Other Roads Roadside And Airtight Ditches Storm Water Drainage Pre Treatment Facilities Settling Tanks And Separators Rainwater Reservoirs And Others Environmental Protection Devices Including Insulation Green Belts Acoustic And Anti Glare Screens Culverts Ecological Passages With A Protective And Guiding System Guiding Greenery Rainwater Drainage System Treatment Devices Settling Tanks Separators Inlet Wells With A Sand Trap Infiltration And Evaporation Tanks Teletechnical Sewage System For The Future Communication And Traffic Management System 2 Complete Rebuild The Existing Road Network In Terms Of Collisions With The S3 Road Drainage Networks As Well As Cleaning And Clearing Existing Drainage Devices And Receivers 3 Strengthening Of The Subsoil To Obtain Appropriate Conditions For The Foundation Of Roads Engineering Structures And Slope Stability 4 Demolition Of Improperly Made Protections Of The Pavement Structural Layers Against The Influence Of Mining 5 Preparation Of The Site For Future Mop Including Utilities I E Lighting Energy Water And Sewage Connections 6 Permanent Traffic Organization On The Expressway And Sections Of The Local Roads Being Reconstructed Including Protective Barriers Horizontal And Vertical Marking 7 Organization Of Traffic For The Duration Of The Works Including Providing Access To All Plots Adjacent To The Road Lane 8 Demolition Of Construction Objects Colliding With The Investment 9 Execution Fencing Of The S 3 Road Along Its Entire Length Green Areas Interfering With The S 3 Road Green Plantings 10 Restoration Of The Roads Used By The Contractor During The Construction To The Standard Prior To The Commencement Of Construction 11 Complete Reclamation Of The Areas Used For Technical And Social Facilities Construction Sites Roads For The Time Of Construction And Any Other Areas Transformed By The Contractor During The Works As Well As During The Removal Of Defects 12 Development Of Project Documentation Including A Making Any Changes Adopted In The But In The Scope Described In The Pfu And Obtaining The Necessary Administrative Decisions These Changes May Not Result In Changes Specified In The Decision On Environmental Conditions B Development Of The Necessary Industrial Technological And Workshop Executive Designs 13 Preparation Of As Built Documentation 14 Obtaining A Decision On Pnu 15 Segregation And Removal From The Construction Site Of Dk3 Demolition Waste Bulk Materials That Cannot Be Incorporated With Disposal 16 Backfilling Illegal Excavations With Land Reclamation 17 Execution Of Pavement Protection Against The Influence Of Mining Exploitation With The Development Of Differential Cost Estimates 18 Monitoring Of Exploitation Effects Type Of Buyer Ministry Or Any Other National Or Federal AuthorityType Of Contract WorksType Of Procedure Open ProcedureRegulation European Union With Participation By Gpa CountriesType Of Bid Not ApplicableAward Criteria Not Applicable Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 37419692
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.